Walsh Construction Company Ii Llc
- Based in
- Concord
- On San Francisco permits
- Nov 2014 to Jul 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 5 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2023 | Completed final sign-off Aug 2023 | 400 Paul Av | revision to pa# 201603293329, updated plan layout, door removed from electrical room in basement. notes added for future scope and for door fire rating requirements.Details
revision to pa# 201603293329, updated plan layout, door removed from electrical room in basement. notes added for future scope and for door fire rating requirements. | |
| Dec 22, 2022 | Never finaled issued Jan 2023, no final | 400 Paul Av | to renew pa# 2018-0927-1576: pa# 2016-0329-3329: all work complete for t.c.oDetails
to renew pa# 2018-0927-1576: pa# 2016-0329-3329: all work complete for t.c.o | |
| Dec 21, 2022 | Completed final sign-off Aug 2023 | 400 Paul Av | bldg a and b: permit revision to document tco conditions. revisions include deferring bathrooms on level 2 and basement to tenant improvement phase. ref permits 201603293329 and 202009033417.Details
bldg a and b: permit revision to document tco conditions. revisions include deferring bathrooms on level 2 and basement to tenant improvement phase. ref permits 201603293329 and 202009033417. | |
| Jun 8, 2022 | Completed final sign-off May 2023 | 400 Paul Av | revision to generator and fuel oil addendum revised generator pad design. ref to 2014 1117 1675 s8 & 202010277447.Details
revision to generator and fuel oil addendum revised generator pad design. ref to 2014 1117 1675 s8 & 202010277447. | |
| Oct 27, 2020 | Never finaled issued Apr 2022, no final | 400 Paul Av | install ex generator to serve bldg# a/b (under this permit) & bldg# c (under separate permit). reference permit for bldg a/b pa# 201603293329 & pa# 202009033417. total 6 generators.Details
install ex generator to serve bldg# a/b (under this permit) & bldg# c (under separate permit). reference permit for bldg a/b pa# 201603293329 & pa# 202009033417. total 6 generators. | $50,000 |
| Sep 3, 2020 | Never finaled issued Aug 2021, no final | 400 Paul Av | revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments)Details
revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments) | |
| Sep 1, 2020 | Never finaled issued Aug 2021, no final | 400 Paul Av | revision to pa 201905069798: 1. change spacing of column grid, added brace frames2. modifies floor loading 3. revised elevations to reflect new column grid, openings on exterior facade, & new elevator shaft height. 4. added fire pump/domestic water pump rooms. 5. other {Details
revision to pa 201905069798: 1. change spacing of column grid, added brace frames2. modifies floor loading 3. revised elevations to reflect new column grid, openings on exterior facade, & new elevator shaft height. 4. added fire pump/domestic water pump rooms. 5. other { | |
| May 23, 2019 | Never finaled issued Jun 2019, no final | 400 Paul Av | fire service for new bldDetails
fire service for new bld | $15,000 |
| May 6, 2019 | Completed final sign-off May 2023 | 400 Paul Av | revision to #201411171675-(s1) bldg c. superstrucrue, architectural, mep. foundation filed under #201901241163(s1)Details
revision to #201411171675-(s1) bldg c. superstrucrue, architectural, mep. foundation filed under #201901241163(s1) | |
| Jan 24, 2019 | Completed final sign-off May 2023 | 400 Paul Av | revision to app#201411171675(s1) bldg c. foundation of continous footing around bldg perimeter and spread footing at inerior. footing support the lateral system braced frames are connected to combine foundations. **maher n/a**Details
revision to app#201411171675(s1) bldg c. foundation of continous footing around bldg perimeter and spread footing at inerior. footing support the lateral system braced frames are connected to combine foundations. **maher n/a** | $50,000 |
| Sep 27, 2018 | Expired or cancelled expired Aug 2023 | 400 Paul Av | plumbing system for 400 paul avenue including strom water management. ref pa# 2014/117/17/1675-s1. ** maher: n/a **Details
plumbing system for 400 paul avenue including strom water management. ref pa# 2014/117/17/1675-s1. ** maher: n/a ** | |
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 556 Golden Gate Av | (2) 24'x60' temporary portable office trailersDetails
(2) 24'x60' temporary portable office trailers | $50,000 |
| Mar 29, 2016 | Expired or cancelled expired Aug 2023 | 400 Paul Av | remodel (e) building with new offices, new ceilings, new interior walls.Details
remodel (e) building with new offices, new ceilings, new interior walls. | |
| Nov 17, 2014 | Never finaled issued Oct 2015, no final | 400 Paul Av | to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not requiredDetails
to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not required | $300,000 |