Theodore Mahl
- Listed as
- architect, authorized agent-others
- Firm
- Cac Architects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Jul 2023
11 permits since 2000 (architect on 10 permits, authorized agent-others on 1 permit): 4 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2023 | Completed final sign-off Aug 2023 | 400 Paul Av | Walsh Construction Company Ii Llc | revision to pa# 201603293329, updated plan layout, door removed from electrical room in basement. notes added for future scope and for door fire rating requirements.Details
revision to pa# 201603293329, updated plan layout, door removed from electrical room in basement. notes added for future scope and for door fire rating requirements. | |
| Dec 21, 2022 | Completed final sign-off Aug 2023 | 400 Paul Av | Walsh Construction Company Ii Llc | bldg a and b: permit revision to document tco conditions. revisions include deferring bathrooms on level 2 and basement to tenant improvement phase. ref permits 201603293329 and 202009033417.Details
bldg a and b: permit revision to document tco conditions. revisions include deferring bathrooms on level 2 and basement to tenant improvement phase. ref permits 201603293329 and 202009033417. | |
| Aug 20, 2021 | Expired or cancelled withdrawn Nov 2021 | 400 Paul Av | building c: new t.i work for data center of about 90k sz ft. program includes data hall, elec rooms, support office & conference room, all on 30" raised fl with roof mech equip.work on l2 limited to pipe penetrations from roof to level 1. on site there is a new entry @ the north side of bldg.Details
building c: new t.i work for data center of about 90k sz ft. program includes data hall, elec rooms, support office & conference room, all on 30" raised fl with roof mech equip.work on l2 limited to pipe penetrations from roof to level 1. on site there is a new entry @ the north side of bldg. | $1,000,000 | |
| Oct 27, 2020 | Never finaled issued Apr 2022, no final | 400 Paul Av | Walsh Construction Company Ii Llc | install ex generator to serve bldg# a/b (under this permit) & bldg# c (under separate permit). reference permit for bldg a/b pa# 201603293329 & pa# 202009033417. total 6 generators.Details
install ex generator to serve bldg# a/b (under this permit) & bldg# c (under separate permit). reference permit for bldg a/b pa# 201603293329 & pa# 202009033417. total 6 generators. | $50,000 |
| Sep 3, 2020 | Never finaled issued Aug 2021, no final | 400 Paul Av | Walsh Construction Company Ii Llc | revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments)Details
revision to pa 201603293329: 1.relocate main entry on level 1, add elevator control room, add point of entry rooms to basement level of bldg b, and add architectural details. (see individual sheets for additional comments) | |
| Sep 1, 2020 | Never finaled issued Aug 2021, no final | 400 Paul Av | Walsh Construction Company Ii Llc | revision to pa 201905069798: 1. change spacing of column grid, added brace frames2. modifies floor loading 3. revised elevations to reflect new column grid, openings on exterior facade, & new elevator shaft height. 4. added fire pump/domestic water pump rooms. 5. other {Details
revision to pa 201905069798: 1. change spacing of column grid, added brace frames2. modifies floor loading 3. revised elevations to reflect new column grid, openings on exterior facade, & new elevator shaft height. 4. added fire pump/domestic water pump rooms. 5. other { | |
| May 6, 2019 | Completed final sign-off May 2023 | 400 Paul Av | Walsh Construction Company Ii Llc | revision to #201411171675-(s1) bldg c. superstrucrue, architectural, mep. foundation filed under #201901241163(s1)Details
revision to #201411171675-(s1) bldg c. superstrucrue, architectural, mep. foundation filed under #201901241163(s1) | |
| Mar 29, 2016 | Expired or cancelled expired Aug 2023 | 400 Paul Av | Dpr Construction Inc, Nova Corp Dba Nova Cm Corp, Walsh Construction Company Ii Llc | remodel (e) building with new offices, new ceilings, new interior walls.Details
remodel (e) building with new offices, new ceilings, new interior walls. | |
| Nov 17, 2014 | Completed final sign-off Aug 2016 | 400 Paul Av | Dpr Construction Inc | demolish one story manafacturing center. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
demolish one story manafacturing center. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $20,000 |
| Nov 17, 2014 | Never finaled issued Oct 2015, no final | 400 Paul Av | Dpr Construction Inc, Nova Corp Dba Nova Cm Corp, Walsh Construction Company Ii Llc | to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not requiredDetails
to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not required | $300,000 |
| Feb 10, 2005 | Expired or cancelled expired Jun 2006 | 1314 Polk St | renew 200404068109 & 200405275006.Details
renew 200404068109 & 200405275006. |