Block 3799, lot 001
601 Townsend St
- City’s use
- Commercial Office
- Built
- 1905
- Stories
- 4
- Units
- 1
- Building
- 287,649 sq ft
- Lot
- 75,625 sq ft
- Zoning
- UMU
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
135 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 601 Townsend St | Bcci Construction Company | 1/f: dishwasher replacement. structural, electrical and mep drawings included.Details
1/f: dishwasher replacement. structural, electrical and mep drawings included. | $224,342 |
| Feb 26, 2025 | Completed final sign-off Jul 2025 | 601 Townsend St | Sabah International Incorporated | basement - voluntary addition of smoke detectors as related to the existing fire alarm system. voluntary 9 smoke detectors inside switch gear roomDetails
basement - voluntary addition of smoke detectors as related to the existing fire alarm system. voluntary 9 smoke detectors inside switch gear room | $17,435 |
| Oct 25, 2022 | Completed final sign-off Aug 2023 | 601 Townsend St | Arrow Sign Company | remove (e) letters & clips. install one set non-illuminated letters "baker + hamilton - since 1948".Details
remove (e) letters & clips. install one set non-illuminated letters "baker + hamilton - since 1948". | $72,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 601 Townsend St | Ad Art Inc. | erect (2) electric illum single faced wall signs ("adobe") on exterior 4th floor corners.Details
erect (2) electric illum single faced wall signs ("adobe") on exterior 4th floor corners. | $10,000 |
| Apr 5, 2022 | Completed final sign-off Apr 2023 | 601 Townsend St | Bcci Construction Company | rev to pa 202102114531. reversed door 1010 swing, revised egress thru 1010, removed illuminated exit sign above door 1343c, revised occupant loads @ exit components on rest of level 1. no changes to occupant loads per room, area or level. occupant loads on level 1 onlyDetails
rev to pa 202102114531. reversed door 1010 swing, revised egress thru 1010, removed illuminated exit sign above door 1343c, revised occupant loads @ exit components on rest of level 1. no changes to occupant loads per room, area or level. occupant loads on level 1 only | $5,000 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 601 Townsend St | Sabah International Incorporated | remove and replace existing edwards est-3 fire alarm control unit with new generation edwards est-4 facu as per csfm info bulletin dated sept. 4, 2008.Details
remove and replace existing edwards est-3 fire alarm control unit with new generation edwards est-4 facu as per csfm info bulletin dated sept. 4, 2008. | $78,007 |
| Sep 17, 2021 | Completed final sign-off Nov 2021 | 601 Townsend St | Sabah International Incorporated | fire alarm ti: add 1 ceiling led horn/strobe, 1 ceiling led strobe. ref pa #202107295389. 1st flDetails
fire alarm ti: add 1 ceiling led horn/strobe, 1 ceiling led strobe. ref pa #202107295389. 1st fl | $10,739 |
| Aug 17, 2021 | Completed final sign-off Sep 2021 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | 1st fl relocate 1, add 2 fire sprinklers per ti ref 202107295398Details
1st fl relocate 1, add 2 fire sprinklers per ti ref 202107295398 | $1,275 |
| Jul 29, 2021 | Completed final sign-off Dec 2021 | 601 Townsend St | Bcci Construction Company | 1st fl conversion of a telecom room to a single stall restroom. mep includedDetails
1st fl conversion of a telecom room to a single stall restroom. mep included | $40,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2023 | 601 Townsend St | Bcci Construction Company | 1st floor - limited to providing occupancy and egress analysis for a-2 assembly areas to receive assembly stamp ref. 2020-1113-8827Details
1st floor - limited to providing occupancy and egress analysis for a-2 assembly areas to receive assembly stamp ref. 2020-1113-8827 | |
| Nov 13, 2020 | Completed final sign-off Dec 2020 | 601 Townsend St | Bcci Construction Company | 1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room.Details
1st fl room #1010: administrative permit only. no work. limited to providing occupancy for training room. | $50,000 |
| Oct 27, 2020 | Never finaled issued May 2021, no final | 601 Townsend St | Bcci Construction Company | structural only permit for awning and patio updates. revision to bpa #201903266194.Details
structural only permit for awning and patio updates. revision to bpa #201903266194. | $50,000 |
| Oct 20, 2020 | Never finaled issued Nov 2020, no final | 601 Townsend St | Acco Engineered Systems Inc. Dba Acco En | 2/f: replacement of 4 (e) self-containted a/c units with new split system units in 2/f idf rooms. maher n/a.Details
2/f: replacement of 4 (e) self-containted a/c units with new split system units in 2/f idf rooms. maher n/a. | $90,000 |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 601 Townsend St | Sabah International Incorporated | fa ti on 1st fl: modify existing fire alarm system. add 1 dual input module. ref pa 201903266194Details
fa ti on 1st fl: modify existing fire alarm system. add 1 dual input module. ref pa 201903266194 | $9,972 |
| Jul 27, 2020 | Never finaled issued Jul 2020, no final | 601 Townsend St | street space | ||
| Mar 16, 2020 | Never finaled issued Aug 2020, no final | 601 Townsend St | Acco Engineered Systems Inc. Dba Acco En | 1st & 3rd floors: replacement of idf room air conditioning units.Details
1st & 3rd floors: replacement of idf room air conditioning units. | $158,000 |
| Mar 16, 2020 | Never finaled issued Sep 2020, no final | 601 Townsend St | Acco Engineered Systems Inc. Dba Acco En | 2nd floors: replacement of condenserwater system, computer room air conditioners, and ups room fan coil with new dx computer room air conditioners and split system dx for ups room.Details
2nd floors: replacement of condenserwater system, computer room air conditioners, and ups room fan coil with new dx computer room air conditioners and split system dx for ups room. | $620,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 601 Townsend St | Acco Engineered Systems Inc. Dba Acco En | like for like boiler replacement for hhw heating hot water system. qty 3. same locations as ex not visible from streetDetails
like for like boiler replacement for hhw heating hot water system. qty 3. same locations as ex not visible from street | $160,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 601 Townsend St | street space | ||
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 601 Townsend St | Rogers Electric | install electrical charging stations in adobe workplace parking garage using poerflex load management technology. charging stations level 2, 1 150 kva transformer, 1 400 a subpanel, 2 225 a subpanels installed to support thisDetails
install electrical charging stations in adobe workplace parking garage using poerflex load management technology. charging stations level 2, 1 150 kva transformer, 1 400 a subpanel, 2 225 a subpanels installed to support this | $60,000 |
| Aug 28, 2019 | Completed final sign-off Nov 2020 | 601 Townsend St | Sabah International Incorporated | voluntary work, add 2 heat det, modify (e) fire alarm system, replace 1 heat detDetails
voluntary work, add 2 heat det, modify (e) fire alarm system, replace 1 heat det | $11,582 |
| May 15, 2019 | Never finaled issued May 2019, no final | 601 Townsend St | Intelligent Technologies & Services Inc | as built set of plans per app#201904016748. n/a for maherDetails
as built set of plans per app#201904016748. n/a for maher | |
| Apr 9, 2019 | Completed final sign-off Nov 2020 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | first floor patio: add (15); relocate (0); and plug (0) in order to conform with new wall and ceiling layout of the t.i. job #19-618Details
first floor patio: add (15); relocate (0); and plug (0) in order to conform with new wall and ceiling layout of the t.i. job #19-618 | $7,875 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 601 Townsend St | Intelligent Technologies & Services Inc | replace existing pre-action panel & smoke detection within 2nd fl server room & battery roomDetails
replace existing pre-action panel & smoke detection within 2nd fl server room & battery room | $17,526 |
| Mar 26, 2019 | Completed final sign-off Mar 2021 | 601 Townsend St | Bcci Construction Company | patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permitDetails
patio ground floor replacement of existing awning panels and demolition at patio; all the (n)works shown are for reference only, light fixtures, patio work and are under separate permit | $350,000 |
| Mar 15, 2019 | Never finaled filed Mar 2019, never issued | 601 Townsend St | street space | ||
| Oct 3, 2018 | Completed final sign-off Nov 2020 | 601 Townsend St | Sabah International Incorporated | fire alarm upgrade, add 2 heat detectors. 1st fl.Details
fire alarm upgrade, add 2 heat detectors. 1st fl. | $6,714 |
| Aug 31, 2018 | Expired or cancelled cancelled Aug 2023 | 601 Townsend St | Bcci Construction Company | 1st flr - revision to arch ref pa 201511233300. revised egress exit signage and approval of townhall assembly areaDetails
1st flr - revision to arch ref pa 201511233300. revised egress exit signage and approval of townhall assembly area | |
| May 23, 2018 | Never finaled issued May 2018, no final | 601 Townsend St | street space | ||
| May 23, 2018 | Never finaled issued May 2018, no final | 601 Townsend St | street space | ||
| Mar 13, 2018 | Never finaled filed Mar 2018, never issued | 601 Townsend St | streetspace | ||
| Mar 13, 2018 | Never finaled issued Mar 2018, no final | 601 Townsend St | streetspace | ||
| Feb 28, 2018 | Completed final sign-off Mar 2018 | 601 Townsend St | Sabah International Incorporated | as-built for permit #2016-0309-1549.Details
as-built for permit #2016-0309-1549. | |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 601 Townsend St | street space | ||
| Feb 15, 2018 | Completed final sign-off Jun 2018 | 601 Townsend St | Giampolini & Co Dba Giampolini/Courtney | paint windows, replace window perimeter caulking, repair failed parge coatings at window sills and ledges. repair any loose bricks. repair mortar joints as required. rinse walls with water.Details
paint windows, replace window perimeter caulking, repair failed parge coatings at window sills and ledges. repair any loose bricks. repair mortar joints as required. rinse walls with water. | $500,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 601 Townsend St | street space | ||
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 601 Townsend St | street space | ||
| Oct 20, 2017 | Never finaled issued Oct 2017, no final | 601 Townsend St | street space/mta meters | ||
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 601 Townsend St | street space permit & mta permit | ||
| Aug 9, 2017 | Never finaled filed Aug 2017, never issued | 601 Townsend St | street space | ||
| Mar 10, 2017 | Never finaled issued Sep 2019, no final | 601 Townsend St | Nova Partners Inc | 1,2,3/f: revision to 201607132201 egress diagrams, ref 200405244620r1; a-2 assembly spaces on floor. maher not reqDetails
1,2,3/f: revision to 201607132201 egress diagrams, ref 200405244620r1; a-2 assembly spaces on floor. maher not req | |
| Dec 13, 2016 | Completed final sign-off Mar 2025 | 601 Townsend St | Sabah International Incorporated | 1st, 2nd, 3rd, floors: fire alarm tenant improvement. ref #201607312201. add 1 booster supply, 2 batteries, 1 sync module, 91 notification. n/a for maherDetails
1st, 2nd, 3rd, floors: fire alarm tenant improvement. ref #201607312201. add 1 booster supply, 2 batteries, 1 sync module, 91 notification. n/a for maher | $35,000 |
| Oct 25, 2016 | Completed final sign-off Aug 2017 | 601 Townsend St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - ti 1st floor 6 added sprinklers, 2nd floor - 8 added sprinklers, 3rd floor - 18 added sprinklers. ref pa 2016-0713-2201. maher naDetails
existing fire sprinkler system - ti 1st floor 6 added sprinklers, 2nd floor - 8 added sprinklers, 3rd floor - 18 added sprinklers. ref pa 2016-0713-2201. maher na | $16,000 |
| Jul 20, 2016 | Completed final sign-off Jul 2016 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | add 6 dry fire sprinklers at basement for new freezers. ref. 2015-09-08-6396. maher naDetails
add 6 dry fire sprinklers at basement for new freezers. ref. 2015-09-08-6396. maher na | $3,120 |
| Jul 13, 2016 | Never finaled issued Sep 2016, no final | 601 Townsend St | Nova Partners Inc | 1,2 & 3rd floors: ti- non structural. mep/fire/life safety under sep permitDetails
1,2 & 3rd floors: ti- non structural. mep/fire/life safety under sep permit | $3,000,000 |
| Jul 8, 2016 | Completed final sign-off Apr 2018 | 601 Townsend St | Bcci Construction Company | fire evacuation signage; maher n/aDetails
fire evacuation signage; maher n/a | $500 |
| Jun 22, 2016 | Completed final sign-off Apr 2018 | 601 Townsend St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of pyro chem fire suppression system in the main kitchen area maher naDetails
installation of pyro chem fire suppression system in the main kitchen area maher na | $5,000 |
| Jun 21, 2016 | Completed final sign-off Jan 2018 | 601 Townsend St | Siemens Industry, Inc. | 3rd floor "adobe" fire alarm - add 1 duct detector at a fire/smoke damperDetails
3rd floor "adobe" fire alarm - add 1 duct detector at a fire/smoke damper | $610 |
| Jun 2, 2016 | Never finaled issued Jul 2016, no final | 601 Townsend St | Bcci Construction Company | for dph (health) review of only work approved under pa 2015-1123-3300. no additional work or changes to original approval.Details
for dph (health) review of only work approved under pa 2015-1123-3300. no additional work or changes to original approval. | |
| May 2, 2016 | Never finaled issued May 2016, no final | 601 Townsend St | street space | ||
| Apr 6, 2016 | Never finaled issued Apr 2016, no final | 601 Townsend St | street space | ||
| Mar 31, 2016 | Completed final sign-off Oct 2016 | 601 Townsend St | Bcci Construction Company | revision to pa 2015-0908-6396 in response to a field condition in the basement.Details
revision to pa 2015-0908-6396 in response to a field condition in the basement. | $82,649 |
| Mar 9, 2016 | Completed final sign-off Jun 2018 | 601 Townsend St | Sabah International Incorporated | fa tenant improvement, add (2) booster power supplies, (1) sync module (3) input module, (2) smoke detector, (1) control relay, (2) door holder, (31) horn/strobes, (14) strobes. ref pa 2016-0309-1549 maher naDetails
fa tenant improvement, add (2) booster power supplies, (1) sync module (3) input module, (2) smoke detector, (1) control relay, (2) door holder, (31) horn/strobes, (14) strobes. ref pa 2016-0309-1549 maher na | $13,365 |
| Feb 24, 2016 | Completed final sign-off May 2016 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | add, relocate and remove fire sprinklers per ti (add 108) (relocate 57) (remove 42) 1st floor. ref pa 2015-1123-3300. maher naDetails
add, relocate and remove fire sprinklers per ti (add 108) (relocate 57) (remove 42) 1st floor. ref pa 2015-1123-3300. maher na | $92,400 |
| Feb 24, 2016 | Never finaled issued Feb 2016, no final | 601 Townsend St | street space permit pa #201509086396Details
street space permit pa #201509086396 | ||
| Jan 19, 2016 | Completed final sign-off Nov 2019 | 601 Townsend St | Bcci Construction Company | (exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a **Details
(exterior entry) -approved pa# 2015/11/23/3300 for exterior work including the replacement of 2 stair egress doors. ** maher: n/a ** | $7,500 |
| Jan 15, 2016 | Completed final sign-off Jul 2016 | 601 Townsend St | Bcci Construction Company | 1st floor - structural work for kitchen hoods associated with issued, pa #201511203235 * 201511162642. n/a maher ordinanceDetails
1st floor - structural work for kitchen hoods associated with issued, pa #201511203235 * 201511162642. n/a maher ordinance | $4,500 |
| Nov 23, 2015 | Completed final sign-off Nov 2019 | 601 Townsend St | Bcci Construction Company | 1st floor partial floor t.i. including new partitions & relocation of fitness room & pantry & refresh of dining space & associated m.e.p. fire life safety under separate permit. n/a maher ordinanceDetails
1st floor partial floor t.i. including new partitions & relocation of fitness room & pantry & refresh of dining space & associated m.e.p. fire life safety under separate permit. n/a maher ordinance | $1,485,000 |
| Nov 20, 2015 | Completed final sign-off Nov 2019 | 601 Townsend St | Bcci Construction Company | 0n 1st floor and new exhuast duct and shaft to roof - mep associated with pa 2015-1116-2642 including new ductwork, lighting & t-24Details
0n 1st floor and new exhuast duct and shaft to roof - mep associated with pa 2015-1116-2642 including new ductwork, lighting & t-24 | $542,840 |
| Nov 16, 2015 | Completed final sign-off Nov 2019 | 601 Townsend St | Bcci Construction Company | 1st flr: t.i. on 1st flr including the renovation of an existing employee cafeteria, the existing shipping & receiving space and relocating two conference rooms; maher n/aDetails
1st flr: t.i. on 1st flr including the renovation of an existing employee cafeteria, the existing shipping & receiving space and relocating two conference rooms; maher n/a | $985,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2016 | 601 Townsend St | Sabah International Incorporated | fire alarm ti. remove (2) existing wall horn/strobes and add (3) new ceiling horn/strobes. maher naDetails
fire alarm ti. remove (2) existing wall horn/strobes and add (3) new ceiling horn/strobes. maher na | $6,492 |
| Sep 8, 2015 | Completed final sign-off Nov 2019 | 601 Townsend St | Bcci Construction Company | partial floor t.i. in the basement including non-structural demolition of partition walls replacing with expanded storage and non-load bearing partitions. n/a for maher.Details
partial floor t.i. in the basement including non-structural demolition of partition walls replacing with expanded storage and non-load bearing partitions. n/a for maher. | $544,207 |
| Jan 8, 2015 | Never finaled issued Jan 2015, no final | 601 Townsend St | Sabah International Incorporated | 2nd fl: fire alarm t.i. replace (6) existing vonventional duct detectors with addressable duct detectors and control relays for ac shutdown on 2nd floor. this is a volunteer replacement. replacement is like for like. no associated mech or arch work.Details
2nd fl: fire alarm t.i. replace (6) existing vonventional duct detectors with addressable duct detectors and control relays for ac shutdown on 2nd floor. this is a volunteer replacement. replacement is like for like. no associated mech or arch work. | $13,398 |
| Aug 6, 2014 | Expired or cancelled withdrawn Aug 2016 | 601 Townsend St | change of use of 72,600 sf in basement from storage to office use per planning commission motion no. 18619. no work proposed. n/a for the maher ordinance #155-13Details
change of use of 72,600 sf in basement from storage to office use per planning commission motion no. 18619. no work proposed. n/a for the maher ordinance #155-13 | ||
| Jun 10, 2014 | Completed final sign-off Jul 2014 | 601 Townsend St | Red Hawk Fire & Security Ca Llc | 3rd floor: adding 2 strobes and relocating one horn/strobes. ref app#201405196130. n/a for the maher ordinance #155-13Details
3rd floor: adding 2 strobes and relocating one horn/strobes. ref app#201405196130. n/a for the maher ordinance #155-13 | $4,500 |
| May 28, 2014 | Completed final sign-off Jun 2014 | 601 Townsend St | on 3rd floor - fire sprinkler permit. add 2 pendents, 2 uprights, delete 2 uprights on the 3rd fl. ti 201405196130 maher 155-13 not reqDetails
on 3rd floor - fire sprinkler permit. add 2 pendents, 2 uprights, delete 2 uprights on the 3rd fl. ti 201405196130 maher 155-13 not req | $2,048 | |
| May 19, 2014 | Completed final sign-off Jul 2014 | 601 Townsend St | Novo Construction Inc | partial 3/f tenant improvement to include non-structural demonition, new partitions to create phone rooms, work stations and soft seating. mech. elect under separate permit. n/a ordinance #155-13.Details
partial 3/f tenant improvement to include non-structural demonition, new partitions to create phone rooms, work stations and soft seating. mech. elect under separate permit. n/a ordinance #155-13. | $283,000 |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 601 Townsend St | Red Hawk Fire & Security Ca Llc | new devices to be added (16) strobes, (4) horn/strobes & relocating existing notification devices. t.i. pa# 201311121631. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd.Details
new devices to be added (16) strobes, (4) horn/strobes & relocating existing notification devices. t.i. pa# 201311121631. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd. | $7,500 |
| Dec 30, 2013 | Completed final sign-off Jul 2014 | 601 Townsend St | Novo Construction Inc | modify (e) & install (n) air distribution & piping for new tenant layout on 1st, 2nd & 3rd floors.Details
modify (e) & install (n) air distribution & piping for new tenant layout on 1st, 2nd & 3rd floors. | $5,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2014 | 601 Townsend St | fire sprinkler permit, relocate 61 and add 23 pendents on floors 1-3. t.i. pa# 201311121631Details
fire sprinkler permit, relocate 61 and add 23 pendents on floors 1-3. t.i. pa# 201311121631 | $43,176 | |
| Dec 10, 2013 | Completed final sign-off Jul 2014 | 601 Townsend St | Novo Construction Inc | partial tenant improvement of 614 sf on the 2nd fl, non structural demolition of partition walls. replacing with soft seating and millworkDetails
partial tenant improvement of 614 sf on the 2nd fl, non structural demolition of partition walls. replacing with soft seating and millwork | $60,000 |
| Nov 12, 2013 | Completed final sign-off Jul 2014 | 601 Townsend St | Novo Construction Inc | 1st, 2nd, 3rd floor:partial t.i. of 8949 sq ft across 3 floors to include non structural demolition of partition walls. installation of new non load bearing partitionsDetails
1st, 2nd, 3rd floor:partial t.i. of 8949 sq ft across 3 floors to include non structural demolition of partition walls. installation of new non load bearing partitions | $120,000 |
| Aug 13, 2013 | Completed final sign-off Aug 2013 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | 1st floor-relocate fire sprinkler heads per t.i-9 relocatedDetails
1st floor-relocate fire sprinkler heads per t.i-9 relocated | $4,600 |
| Aug 8, 2013 | Completed final sign-off Sep 2013 | 601 Townsend St | Novo Construction Inc | 1st floor-renovation of 956 gsf consisting of non structural demolition & construction of (e) conference roomDetails
1st floor-renovation of 956 gsf consisting of non structural demolition & construction of (e) conference room | $119,688 |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 601 Townsend St | street space permit | ||
| Dec 23, 2010 | Expired or cancelled withdrawn Mar 2011 | 601 Townsend St | Devcon Construction | adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachment by bsm.Details
adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachment by bsm. | $425,000 |
| Dec 16, 2010 | Never finaled issued Dec 2010, no final | 601 Townsend St | Acco Engineered Systems Inc. Dba Acco En | rooftop boiler replacement. | $150,000 |
| Dec 15, 2010 | Completed final sign-off Jan 2011 | 601 Townsend St | Diversified Fire Products | 1st/2nd/3rd floors-fire alarm t.i.-2 control relays, 2 in duct detectors, 2 horn/strobes ceiling & 1 strobe only (wall)Details
1st/2nd/3rd floors-fire alarm t.i.-2 control relays, 2 in duct detectors, 2 horn/strobes ceiling & 1 strobe only (wall) | $5,280 |
| Nov 18, 2010 | Completed final sign-off Jan 2011 | 601 Townsend St | Golden Bear Fire Protect. | installation of fire sprinklers at first and second floor - 14 heads. add & relocate fire sprinklers as required by room remodels.Details
installation of fire sprinklers at first and second floor - 14 heads. add & relocate fire sprinklers as required by room remodels. | $1,000 |
| Nov 4, 2010 | Completed final sign-off Jan 2011 | 601 Townsend St | Devcon Construction | remodel to existing shower areas & adding 3 new shower stalls each on 1st and 2nd floors.Details
remodel to existing shower areas & adding 3 new shower stalls each on 1st and 2nd floors. | $192,299 |
| May 11, 2010 | Never finaled issued May 2010, no final | 601 Townsend St | Weidner Architectural Signage | to erect 2 electric wall signsDetails
to erect 2 electric wall signs | $30,000 |
| Oct 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Intelligent Technologies & Services Inc | revision to pa #200807025877, at 2nd fl: revise sequence of operation to approved pre-action detection system. remove emerg power shut down upon pre=-action system activation.Details
revision to pa #200807025877, at 2nd fl: revise sequence of operation to approved pre-action detection system. remove emerg power shut down upon pre=-action system activation. | |
| Jul 29, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Diversified Fire Products | 2nd floor fire alarm t.i. fo resl lag 2139, 1 control relay, 1 horn/strobe, 1 duct detector, 1 fsd.Details
2nd floor fire alarm t.i. fo resl lag 2139, 1 control relay, 1 horn/strobe, 1 duct detector, 1 fsd. | $6,960 |
| Jul 2, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Intelligent Technologies & Services Inc | expand existing pre-action detection system by adding detection into eng/server lab.Details
expand existing pre-action detection system by adding detection into eng/server lab. | $1,700 |
| Jun 25, 2008 | Completed final sign-off Sep 2008 | 601 Townsend St | Golden Bear Fire Protect. | modification to existing preaction fire sprinkler sytem to include added lab room 2139, 19 sprinklersDetails
modification to existing preaction fire sprinkler sytem to include added lab room 2139, 19 sprinklers | $4,800 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Devcon Construction | 2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixturesDetails
2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixtures | $210,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Devcon Construction | ti for 2nd floor to construct a new engineering server lab in room #2139. new partitions, finishes and door assembly. convert ex. storage in room 2289 to a new electrical room with 1hr. rated wall assembly. mep and fire safety will be submited under a saparate permitDetails
ti for 2nd floor to construct a new engineering server lab in room #2139. new partitions, finishes and door assembly. convert ex. storage in room 2289 to a new electrical room with 1hr. rated wall assembly. mep and fire safety will be submited under a saparate permit | $175,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 601 Townsend St | Devcon Construction | add 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807Details
add 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807 | $165,000 |
| May 10, 2006 | Completed final sign-off May 2007 | 601 Townsend St | remove interior lobby door & replace with 3 optical security turnstiles.Details
remove interior lobby door & replace with 3 optical security turnstiles. | $6,000 | |
| Apr 19, 2006 | Never finaled issued Apr 2006, no final | 601 Townsend St | Weidner Architectural Signage | erect non-electric wall single faced sign.Details
erect non-electric wall single faced sign. | |
| Nov 30, 2005 | Completed final sign-off Mar 2006 | 601 Townsend St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of ansul fire systemDetails
installation of ansul fire system | $2,700 |
| Oct 4, 2005 | Completed final sign-off Nov 2005 | 601 Townsend St | revision to appl#200405244620 provide magnetic locks for doors into g/f lobby.doors are supplied with panic hardware & audio alarm will sound when opened.Details
revision to appl#200405244620 provide magnetic locks for doors into g/f lobby.doors are supplied with panic hardware & audio alarm will sound when opened. | $2,000 | |
| Aug 11, 2005 | Completed final sign-off Sep 2005 | 601 Townsend St | Golden Bear Fire Protect. | revision to pa#200504271024 added calculated area per plan check comment. basement.Details
revision to pa#200504271024 added calculated area per plan check comment. basement. | $1,000 |
| Jun 16, 2005 | Completed final sign-off Jan 2006 | 601 Townsend St | L. J. Kruse Co | fuel oil piping as built (orig pa# 2004/08/06/0888)Details
fuel oil piping as built (orig pa# 2004/08/06/0888) | |
| Jun 14, 2005 | Completed final sign-off Nov 2005 | 601 Townsend St | structural revision to pa# 2004/08/12/1404. structural work only.Details
structural revision to pa# 2004/08/12/1404. structural work only. | $10,000 | |
| Apr 27, 2005 | Completed final sign-off Sep 2005 | 601 Townsend St | revsion to pa# 2004/07/22/9533, relocation of fire sprinklers. as built differs from approvedDetails
revsion to pa# 2004/07/22/9533, relocation of fire sprinklers. as built differs from approved | $5,000 | |
| Mar 23, 2005 | Expired or cancelled expired Mar 2006 | 601 Townsend St | install ul-300 ansul r-102 fire system for hood & duct, equipment protectionDetails
install ul-300 ansul r-102 fire system for hood & duct, equipment protection | $6,150 | |
| Mar 21, 2005 | Never finaled issued Mar 2005, no final | 601 Townsend St | street space | ||
| Nov 17, 2004 | Completed final sign-off Apr 2005 | 601 Townsend St | Devcon Construction | emergency demolition of hazardous water tower supports per field inspectors instruction.Details
emergency demolition of hazardous water tower supports per field inspectors instruction. | $1,000 |
| Oct 22, 2004 | Never finaled issued Oct 2004, no final | 601 Townsend St | Intelligent Technologies & Services Inc | redesign existing preaction system. 5 detectors.Details
redesign existing preaction system. 5 detectors. | $2,500 |
| Aug 17, 2004 | Expired or cancelled expired Mar 2006 | 601 Townsend St | Sprig Electric (Archkey Solutions) | installation of fire alarm system on all floors.Details
installation of fire alarm system on all floors. | $60,000 |
| Aug 12, 2004 | Completed final sign-off Jul 2005 | 601 Townsend St | single faced electric roof wall signDetails
single faced electric roof wall sign | $20,000 | |
| Aug 12, 2004 | Never finaled issued Nov 2004, no final | 601 Townsend St | Devcon Construction | exterior improvements: new canopy and entranceDetails
exterior improvements: new canopy and entrance | $875,000 |
| Aug 6, 2004 | Completed final sign-off Jan 2006 | 601 Townsend St | L. J. Kruse Co | fuel piping systemDetails
fuel piping system | $75,000 |
| Jul 22, 2004 | Completed final sign-off Sep 2005 | 601 Townsend St | Golden Bear Fire Protect. | add & relocate fire sprinklers.Details
add & relocate fire sprinklers. | $69,900 |
| Jul 13, 2004 | Expired or cancelled expired Mar 2006 | 601 Townsend St | minor structural/architectural rev. to appl#200404151372Details
minor structural/architectural rev. to appl#200404151372 | $20,000 | |
| May 24, 2004 | Completed final sign-off Jan 2006 | 601 Townsend St | renovation of office bldg. on all floors, new mechanical,electrical & plumbingDetails
renovation of office bldg. on all floors, new mechanical,electrical & plumbing | $3,200,000 | |
| Apr 15, 2004 | Expired or cancelled expired Mar 2006 | 601 Townsend St | interior demo all floors & structural repair to prep.for future t.i.Details
interior demo all floors & structural repair to prep.for future t.i. | $250,000 | |
| Jun 26, 2002 | Expired or cancelled expired Aug 2004 | 601 Townsend St | upgrade existing entrance to ;basement provide h/c upgrade to (e) ramp to basement.barrier removal oDetails
upgrade existing entrance to ;basement provide h/c upgrade to (e) ramp to basement.barrier removal o | $4,000 | |
| Jun 17, 2002 | Expired or cancelled expired Nov 2002 | 601 Townsend St | construction of enclosures for future exit stairs from basement to 1st flr(200006193046)Details
construction of enclosures for future exit stairs from basement to 1st flr(200006193046) | $4,000 | |
| Jul 16, 2001 | Expired or cancelled expired Nov 2001 | 601 Townsend St | Cannon Constructors North Inc | for final inspection - 2000/07/11/4758.Details
for final inspection - 2000/07/11/4758. | |
| Jul 16, 2001 | Expired or cancelled expired Nov 2001 | 601 Townsend St | Cannon Constructors North Inc | renew permit app#200007175346 for final inspection onlyDetails
renew permit app#200007175346 for final inspection only | |
| Mar 28, 2001 | Completed final sign-off Sep 2001 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | t.i. add (3) fire sprinkler heads per new walls on 2nd floorDetails
t.i. add (3) fire sprinkler heads per new walls on 2nd floor | $850 |
| Dec 28, 2000 | Completed final sign-off Sep 2001 | 601 Townsend St | add new doors and card readers to isolate western 1/3 of 2nd floor space submit sep applic for cardDetails
add new doors and card readers to isolate western 1/3 of 2nd floor space submit sep applic for card | $5,000 | |
| Oct 13, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | Decker Electric Co Inc Electrical Contra | fire alarm systemDetails
fire alarm system | $39,000 |
| Oct 4, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | Decker Electric Co Inc Electrical Contra | provide strobes, horns, booster panels, smoke detectros, duct detectors and hvac, damper shut downDetails
provide strobes, horns, booster panels, smoke detectros, duct detectors and hvac, damper shut down | $39,000 |
| Sep 22, 2000 | Completed final sign-off Sep 2001 | 601 Townsend St | Intelligent Technologies & Services Inc | fire sprinkler system 2nd flDetails
fire sprinkler system 2nd fl | $2,500 |
| Sep 11, 2000 | Expired or cancelled expired Sep 2001 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | install new fire sprinkler system at basement area connect to existing supply risersDetails
install new fire sprinkler system at basement area connect to existing supply risers | $40,500 |
| Aug 30, 2000 | Completed final sign-off Sep 2001 | 601 Townsend St | Ayoob & Peery Plumbing Co Inc | modify (e) fire sprinklers to accommodate t/i-1 new preaction system (118 heads)Details
modify (e) fire sprinklers to accommodate t/i-1 new preaction system (118 heads) | $92,000 |
| Aug 26, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | revise to architect detailDetails
revise to architect detail | ||
| Aug 5, 2000 | Expired or cancelled expired Dec 2000 | 601 Townsend St | street space | ||
| Aug 5, 2000 | Expired or cancelled expired Dec 2000 | 601 Townsend St | street space | ||
| Aug 2, 2000 | Completed final sign-off Sep 2001 | 601 Townsend St | provide electrical and mechanical per plan.Details
provide electrical and mechanical per plan. | ||
| Aug 2, 2000 | Completed final sign-off Sep 2001 | 601 Townsend St | provide electrical and mechanical per plansDetails
provide electrical and mechanical per plans | ||
| Aug 2, 2000 | Never finaled issued Aug 2000, no final | 601 Townsend St | t/i partition walls doors employee's break rm outlets light fixtures & cabinetryDetails
t/i partition walls doors employee's break rm outlets light fixtures & cabinetry | $250,000 | |
| Aug 2, 2000 | Never finaled issued Aug 2000, no final | 601 Townsend St | t/i partition walls doors employee's break rm outlets light fixtures & cabinetry 3/fDetails
t/i partition walls doors employee's break rm outlets light fixtures & cabinetry 3/f | $225,000 | |
| Jul 17, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | Cannon Constructors North Inc | submit fire sprinkler drawings a calculatoins.Details
submit fire sprinkler drawings a calculatoins. | $200,000 |
| Jul 13, 2000 | Expired or cancelled expired Oct 2001 | 601 Townsend St | improvements for upgrading the (e) storage use including a west entrance, new exitDetails
improvements for upgrading the (e) storage use including a west entrance, new exit | $300,000 | |
| Jul 11, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | Cannon Constructors North Inc | fire alarm and life safetyDetails
fire alarm and life safety | $25,000 |
| Jun 19, 2000 | Completed final sign-off Jul 2001 | 601 Townsend St | construct enclosure for future exit stairs from basemt to 1/f enclosure for future west lobbyDetails
construct enclosure for future exit stairs from basemt to 1/f enclosure for future west lobby | $30,000 | |
| Jun 8, 2000 | Expired or cancelled withdrawn Aug 2000 | 601 Townsend St | Dpr Construction Inc | oti-1 3rd floor el, me, l/s, sp | $2,000,000 |
| Jun 7, 2000 | Expired or cancelled withdrawn Aug 2000 | 601 Townsend St | oti-1 2nd floor electrical mechanical lifesafty sprinklerDetails
oti-1 2nd floor electrical mechanical lifesafty sprinkler | $2,000,000 | |
| May 6, 2000 | Expired or cancelled withdrawn Jan 2001 | 601 Townsend St | install door, elevator, shaft, bathrooms, tenant improvement.Details
install door, elevator, shaft, bathrooms, tenant improvement. | $180,000 | |
| May 6, 2000 | Expired or cancelled withdrawn Jan 2001 | 601 Townsend St | exterior modification | $120,000 | |
| Mar 18, 2000 | Expired or cancelled withdrawn Aug 2000 | 601 Townsend St | revision to 9911656s. this is to upgrade basement bathrooms to comply with ada.Details
revision to 9911656s. this is to upgrade basement bathrooms to comply with ada. | $350,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (17), Sabah International Incorporated (11), Ayoob & Peery Plumbing Co Inc (8), Devcon Construction (7), Intelligent Technologies & Services Inc (6), Acco Engineered Systems Inc. Dba Acco En (5), Novo Construction Inc (5), Cannon Constructors North Inc (4), Golden Bear Fire Protect. (4), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Decker Electric Co Inc Electrical Contra (2), Diversified Fire Products (2), L. J. Kruse Co (2), Nova Partners Inc (2), Red Hawk Fire & Security Ca Llc (2), Weidner Architectural Signage (2), Ad Art Inc., Anderson, Rowe & Buckley, Inc., Arrow Sign Company, Dpr Construction Inc, Giampolini & Co Dba Giampolini/Courtney, Rogers Electric, Siemens Industry, Inc., Sprig Electric (Archkey Solutions)
- Architects
- Douglas Zocker (2), Jon Jackson (2), Robin Mcdonald (2), William Raymond Turner (2), Daniel Kirby, Daniel Pamperin, Gregory Mottola, Joseph Mastro Valerio, L.H. Nishkian, Marco Cham-Yin Fung, Robert Lopez
- Engineers
- Alexander Joseph Pacheco, James ,Pgamma,, Laurie K. Johnston, Xuong Quach
- Authorized agents
- Nicole Vetzmadian
- Designers
- C. Sabah David Hansen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.