Permit 201012237333
601 Townsend St
adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachment by bsm.
- Outcome
- Expired or cancelled (city status: withdrawn, Mar 24, 2011)
- Filed
- Dec 23, 2010
- Declared cost
- $425,000
- Building use
- office
- Neighborhood
- Mission Bay (how long permits take there)
- Contractor
- Devcon Construction (license 399163)
- Property
- All permits at this address (block 3799, lot 001)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Devcon Construction (license 399163)
- Authorized agent
- Jackie Baumann, Bruce D. Baumann & Assoc. (no license listed), applicant