Patrick Daly
- Listed as
- architect, designer, engineer
- Firm
- Woods Bagot
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Aug 2026
63 permits since 2000 (architect on 60 permits, engineer on 2 permits, designer on 1 permit): 36 completed, 18 in progress, 9 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 1 Sansome St | Skyline Construction | 29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly.Details
29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly. | |
| Aug 12, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door.Details
floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door. | |
| May 29, 2026 | In progress issued Jul 2026 | 1 Sansome St | Skyline Construction | 40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition detailsDetails
40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition details | |
| May 18, 2026 | In progress issued Jul 2026 | 1 Sansome St | Skyline Construction | level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit.Details
level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit. | |
| May 11, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths.Details
floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths. | $400,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details.Details
26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details. | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modificationsDetails
33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modifications | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications.Details
revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications. | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | revision to pa 202511129399 30-31floor - food service scope includes finishes, equipments and environmental health notes. revision includes additional lockers, drinking fountain, ceiling and soffit modificationsDetails
revision to pa 202511129399 30-31floor - food service scope includes finishes, equipments and environmental health notes. revision includes additional lockers, drinking fountain, ceiling and soffit modifications | ||
| Apr 7, 2026 | In progress issued Jun 2026 | 1 Sansome St | Skyline Construction | 28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation...Details
28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation... | |
| Mar 31, 2026 | In progress issued Apr 2026 | 1 Sansome St | Skyline Construction | 29th/f: deferred mep for t.i. 202512101397Details
29th/f: deferred mep for t.i. 202512101397 | $1,157,328 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 26/f: deferred mep for pa# 202512172035.Details
26/f: deferred mep for pa# 202512172035. | $1,157,328 |
| Mar 9, 2026 | Completed final sign-off May 2026 | 300 Mission St | Novo Construction Inc | 22nd floor: minor interior t.i. new partitions and finishesDetails
22nd floor: minor interior t.i. new partitions and finishes | $157,680 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 24-25/f: deferred mep for pa# 202512172034.Details
24-25/f: deferred mep for pa# 202512172034. | $2,314,656 |
| Feb 6, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | l 27: revision to bpa202510207709. for dph approval of level27 mk. revisions also include upgraded restroom layouts, drinking fountains + misc finishes.Details
l 27: revision to bpa202510207709. for dph approval of level27 mk. revisions also include upgraded restroom layouts, drinking fountains + misc finishes. | |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | level 33,35 deferred mep for 202511129396Details
level 33,35 deferred mep for 202511129396 | $2,333,160 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | l30-31 deferred mep for 202511129399Details
l30-31 deferred mep for 202511129399 | $2,347,776 |
| Dec 18, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 26th floor. core and shell structural upgrade and moditications to support t.i.Details
26th floor. core and shell structural upgrade and moditications to support t.i. | $100,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1 Sansome St | Skyline Construction | level 40th floor. core and shell structural upgrade and moditications to support t.i.Details
level 40th floor. core and shell structural upgrade and moditications to support t.i. | $50,000 |
| Dec 18, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 29th and 30th floor. core and shell structural upgrade and moditications to support t.i.Details
29th and 30th floor. core and shell structural upgrade and moditications to support t.i. | $100,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 1 Sansome St | Skyline Construction | 28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in food facilities or staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in food facilities or staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,068,820 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $4,137,640 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,068,820 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit.Details
level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit. | $1,285,238 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 29th/f:t.i. including interior renovations for layout, lobby, reception, 3 phone booths, multi purpose with upgrades to restrooms.no finish work equipment or fixture installation in food facilities or staff to occur prior to dph approval under defer permit.mep deferred. horizontal exit addedDetails
29th/f:t.i. including interior renovations for layout, lobby, reception, 3 phone booths, multi purpose with upgrades to restrooms.no finish work equipment or fixture installation in food facilities or staff to occur prior to dph approval under defer permit.mep deferred. horizontal exit added | $2,396,444 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,155,982 |
| Dec 1, 2025 | In progress issued Dec 2025 | 655 Montgomery St | Source Planning And Construction Inc | 19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting.Details
19/f: demo (e) toilet partitions and finishes and replace with (n). (n) bathroom finishes and fixtures and lighting. | $67,088 |
| Nov 25, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revised details to illustrate design changes to exteior security wall. added cdu and thermal chamber both for future installation ref#: 202504043753Details
revised details to illustrate design changes to exteior security wall. added cdu and thermal chamber both for future installation ref#: 202504043753 | $10,000 |
| Nov 24, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202510177584. update structural details including cross sections, concrete pavement, handrail details, and rebar placement.Details
revision to 202510177584. update structural details including cross sections, concrete pavement, handrail details, and rebar placement. | |
| Nov 12, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferredDetails
33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferred | $7,400,000 |
| Nov 6, 2025 | In progress issued Dec 2025 | 1 Sansome St | Skyline Construction | 28th/fl: core and shell structured upgrade and modifications required to support future t.i.Details
28th/fl: core and shell structured upgrade and modifications required to support future t.i. | $100,000 |
| Oct 29, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202503111984: removal of fsd-5-25 & fsd 5-26 from schedule & plans, mechanical schedule only scopeDetails
revision to 202503111984: removal of fsd-5-25 & fsd 5-26 from schedule & plans, mechanical schedule only scope | |
| Oct 20, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 27th floor: ti -non-structural partitions, ceilings, fixtures, finishes. mep deferred.Details
27th floor: ti -non-structural partitions, ceilings, fixtures, finishes. mep deferred. | $2,100,000 |
| Oct 17, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to bpa: 202503172334. exterior door updates and new exterior ramp; minor interior geometry. revision and incorporate fitness room requipment, update raised floor detail and to 2 hour rated library, window detail. across levels 1,2,3,4Details
revision to bpa: 202503172334. exterior door updates and new exterior ramp; minor interior geometry. revision and incorporate fitness room requipment, update raised floor detail and to 2 hour rated library, window detail. across levels 1,2,3,4 | |
| Oct 8, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Siemens Industry, Inc. | 1-4/fl- fire alarm ti. ref 202503172334Details
1-4/fl- fire alarm ti. ref 202503172334 | $10,000 |
| Sep 23, 2025 | In progress issued Nov 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | 1-4/fl- deferred submittal for sfdph food service review only ref 202503172334Details
1-4/fl- deferred submittal for sfdph food service review only ref 202503172334 | |
| Sep 17, 2025 | In progress issued Oct 2025 | 1 Sansome St | Skyline Construction | addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosureDetails
addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosure | $1,200,000 |
| Sep 5, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202503112039 to incorporate 2) new executive offices w/ watiting rooms & modified restroom layoutDetails
revision to 202503112039 to incorporate 2) new executive offices w/ watiting rooms & modified restroom layout | $500 |
| Aug 13, 2025 | In progress issued Sep 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to pa#: 202504043753. to modify assembly for (e) security wall in room 1124, and to add new security wall in room 1123.Details
revision to pa#: 202504043753. to modify assembly for (e) security wall in room 1124, and to add new security wall in room 1123. | $278,168 |
| Aug 6, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | temporary lobby at level 1 to facilitate building entry and access to levels 5 and 6 once they are complete. during which the time levels 1-4 will still be under construction.Details
temporary lobby at level 1 to facilitate building entry and access to levels 5 and 6 once they are complete. during which the time levels 1-4 will still be under construction. | $100,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to approved pa #202503111984. to incorporate a horizontal exit to accomodate additional loading. minor additional revisions included and clouded.Details
revision to approved pa #202503111984. to incorporate a horizontal exit to accomodate additional loading. minor additional revisions included and clouded. | $10,000 |
| Jul 8, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 27th-31st fl, 33rd, 35th, 38th and 40th fl - interior only non-structural demo per ab-017Details
27th-31st fl, 33rd, 35th, 38th and 40th fl - interior only non-structural demo per ab-017 | $1,099,602 |
| Jul 2, 2025 | In progress issued Aug 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | 5th & 6th fl - deferred submittal to approved pa 202503111984 and 202503112039 for sfdph review only. (2) micro kitchens for food serviceDetails
5th & 6th fl - deferred submittal to approved pa 202503111984 and 202503112039 for sfdph review only. (2) micro kitchens for food service | |
| Apr 16, 2025 | Completed final sign-off Jan 2026 | 655 Montgomery St | Source Planning And Construction Inc | 19/f: ti - demo (e) partitions, finishes, ceiling, lighting. (n) partitions, doors, finishes, ceiling, lighting, millwork. no structural work.Details
19/f: ti - demo (e) partitions, finishes, ceiling, lighting. (n) partitions, doors, finishes, ceiling, lighting, millwork. no structural work. | $2,429,174 |
| Apr 4, 2025 | In progress issued May 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | l1- new server room, workspace a desk area. l2- new electrical room to supply the server room on l1. office. scope of work does not overlap with 2025-0317-2334Details
l1- new server room, workspace a desk area. l2- new electrical room to supply the server room on l1. office. scope of work does not overlap with 2025-0317-2334 | $278,168 |
| Mar 26, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | level 1 thru level 4 & roof only: tenant improvement.new partitions, ceiling, finishes, millwork & lighting. mep included.new communicating stair from level 1 thru 6. with coiling fire door at l1-l2.kitchen/health department scope under separate permit.Details
level 1 thru level 4 & roof only: tenant improvement.new partitions, ceiling, finishes, millwork & lighting. mep included.new communicating stair from level 1 thru 6. with coiling fire door at l1-l2.kitchen/health department scope under separate permit. | $41,626,378 |
| Mar 11, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | level 6 interior tenant improvement includes new non load bearing partitions, ceilings, finishes, millwork, lighting. mep included.Details
level 6 interior tenant improvement includes new non load bearing partitions, ceilings, finishes, millwork, lighting. mep included. | $5,955,727 |
| Mar 11, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included.Details
level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included. | $10,780,569 |
| Jan 30, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | 5th & 6th fl:interior non-structural demo of walls, doors, & restrooms. no ceiling work planned. scope of work does not overlap w/ 202501228843Details
5th & 6th fl:interior non-structural demo of walls, doors, & restrooms. no ceiling work planned. scope of work does not overlap w/ 202501228843 | $35,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6Details
structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6 | $694,000 |
| Jan 22, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | all levels: interior non-structural demo of walls, doors, and vertical curculation in the building. no ceiling work planned per ab-017.Details
all levels: interior non-structural demo of walls, doors, and vertical curculation in the building. no ceiling work planned per ab-017. | $190,000 |
| Dec 16, 2019 | Never finaled filed Dec 2019, never issued | 1125 Market St | to erect a type 1-a, 14-story with 2 level basement, 180 guest room hotel & restaurant. (r-1,b,a-1,a-2,a-3,s-2)Details
to erect a type 1-a, 14-story with 2 level basement, 180 guest room hotel & restaurant. (r-1,b,a-1,a-2,a-3,s-2) | $49,300,000 | |
| Sep 17, 2018 | Completed final sign-off Mar 2019 | 88 Kearny St | Bcci Construction Company | 19th flr - ti build back. includes new partions maher naDetails
19th flr - ti build back. includes new partions maher na | $1,300,000 |
| Dec 5, 2016 | Completed final sign-off Jan 2017 | 228 Grant Av | Angotti & Reilly Inc. | revision to pa 2015-1005-9570. no change to scope of work permit revision to the addition of the lighting schedule and title 24 formsDetails
revision to pa 2015-1005-9570. no change to scope of work permit revision to the addition of the lighting schedule and title 24 forms | |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 228 Grant Av | Angotti & Reilly Inc. | 4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom.Details
4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom. | $70,000 |
| Sep 29, 2016 | Never finaled filed Sep 2016, never issued | 1200 Van Ness Av | to erect 13 stories, 4 basements, 107 units residential, commercial, retail & parking building of type 1b over type 1a podium construction ** maher: n/a **Details
to erect 13 stories, 4 basements, 107 units residential, commercial, retail & parking building of type 1b over type 1a podium construction ** maher: n/a ** | $96,500,000 | |
| Sep 28, 2016 | Never finaled filed Sep 2016, never issued | 5 Thomas Mellon Dr | demolition of three story office and retail building.Details
demolition of three story office and retail building. | $40,000 | |
| Sep 20, 2016 | Never finaled issued Jan 2020, no final | 5 Thomas Mellon Dr | north bldg a. to erect 8 stories, 3 basement, type i-a, 90 units residential, assembly & parking building. (r-2, a-3,s-2) ** maher: n/a **Details
north bldg a. to erect 8 stories, 3 basement, type i-a, 90 units residential, assembly & parking building. (r-2, a-3,s-2) ** maher: n/a ** | $41,000,000 | |
| Sep 20, 2016 | Never finaled issued Feb 2020, no final | 5 Thomas Mellon Dr | south bldg e. erect a six stories 133 dwelling units building with 3 basements.Details
south bldg e. erect a six stories 133 dwelling units building with 3 basements. | $42,000,000 | |
| Sep 20, 2016 | Never finaled issued Feb 2020, no final | 5 Thomas Mellon Dr | south bldg c, erect a six stories 76 dwelling units type 1a residential building with 3 basement.Details
south bldg c, erect a six stories 76 dwelling units type 1a residential building with 3 basement. | $42,000,000 | |
| Sep 20, 2016 | Never finaled issued Feb 2020, no final | 5 Thomas Mellon Dr | south bldg d. erect a six stories 113 dwelling units building with 3 basements.**maher n/a**Details
south bldg d. erect a six stories 113 dwelling units building with 3 basements.**maher n/a** | $42,000,000 | |
| Sep 20, 2016 | Never finaled issued Jan 2020, no final | 5 Thomas Mellon Dr | north bldg b. to erect 17 stories, 3 basement, type i-a, 174 units residential, assembly & parking building. (r-2,a-3,s-2) ** maher: n/a **Details
north bldg b. to erect 17 stories, 3 basement, type i-a, 174 units residential, assembly & parking building. (r-2,a-3,s-2) ** maher: n/a ** | $81,000,000 | |
| Oct 23, 2015 | Never finaled filed Oct 2015, never issued | 455 Serrano Dr | erect an 11 story, 248 covered multi-family dwelling unit buildingDetails
erect an 11 story, 248 covered multi-family dwelling unit building | $56,227,346 |