J C Morgan Builders
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Aug 2008
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 260 California St | revision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet.Details
revision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet. | |
| Apr 21, 2008 | Completed final sign-off Oct 2008 | 260 California St | office tenant improvement on the 5th fl. construct 2 new walls and new floor covering. mep, life safety and sprinkler under separate permits. demo done under 2008/04/17/0011Details
office tenant improvement on the 5th fl. construct 2 new walls and new floor covering. mep, life safety and sprinkler under separate permits. demo done under 2008/04/17/0011 | $18,000 |
| Apr 17, 2008 | Completed final sign-off Oct 2008 | 260 California St | interior demolition of non load bearing partitions and door assemblies, ab-017.Details
interior demolition of non load bearing partitions and door assemblies, ab-017. | $6,600 |
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 277 09th St | install new 5/8 drywall over (e) 3x6 studs,ceiling were affected with 1 5/8/ drywall screws, tap & mud to smooth wall level 3-5 finish. prime walls, install r-13 insulation into (e) walls, r-19 insulation into any opened ceiling affected by construction in kind. revision to pa# 200712170613Details
install new 5/8 drywall over (e) 3x6 studs,ceiling were affected with 1 5/8/ drywall screws, tap & mud to smooth wall level 3-5 finish. prime walls, install r-13 insulation into (e) walls, r-19 insulation into any opened ceiling affected by construction in kind. revision to pa# 200712170613 | $18,000 |
| Dec 17, 2007 | Completed final sign-off Apr 2008 | 299 09th St | revision to pa# 2007/11/05/7287. remove ex. water and termite damaged exterior wall framing and siding along 9th & folsom streets and east wall. rebuild with new 3x6 wall framing, attach to new 3x6 pressure treated sill bolted into new stemwall of concrete. cover exterior with new 1/2" plwd.Details
revision to pa# 2007/11/05/7287. remove ex. water and termite damaged exterior wall framing and siding along 9th & folsom streets and east wall. rebuild with new 3x6 wall framing, attach to new 3x6 pressure treated sill bolted into new stemwall of concrete. cover exterior with new 1/2" plwd. | $45,000 |
| Nov 5, 2007 | Never finaled issued Nov 2007, no final | 299 09th St | remove existing siding, repair and replace any water damaged wall studs, replace any damaged 1x8x14. recover with tyvek and bituthane around windows, install 5/8 plywood, install new 1x8 cove siding with stucco baseDetails
remove existing siding, repair and replace any water damaged wall studs, replace any damaged 1x8x14. recover with tyvek and bituthane around windows, install 5/8 plywood, install new 1x8 cove siding with stucco base | $15,000 |