Block 0069, lot 068
1150 Lombard St
- City’s use
- Single Family Residential
- Built
- 1989
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,332 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
3 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 1150 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | framing repairs to exterior wall, like for like and put back stucco like for like. unit 26Details
framing repairs to exterior wall, like for like and put back stucco like for like. unit 26 | $40,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1150 Lombard St | Evercharge Inc | common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location.Details
common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location. | $1,500 |
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 1150 Lombard St | Cee Jay Industry | common area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakersDetails
common area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakers | $17,750 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andrew Chekene Enterprises/ Dba Ac Enter, Cee Jay Industry, Evercharge Inc
- Engineers
- Alexander Shorts
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.