Kirk A Fry
- Listed as
- engineer
- Firm
- Osborn Engineering
- Based in
- Cleveland
- On San Francisco permits
- May 2019 to Dec 2019
3 permits since 2000 (engineer on 3 permits): 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterationsDetails
alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterations | $500,000 |
| Aug 15, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterationsDetails
alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations | $750,000 |
| May 21, 2019 | Never finaled issued Aug 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split systemDetails
alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split system | $550,000 |