Sean Johnson
- Listed as
- engineer
- Firm
- Osborn Engineering
- Based in
- Cleveland
- On San Francisco permits
- Aug 2019 to Aug 2019
1 permit since 2000 (engineer on 1 permit): 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterationsDetails
alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations | $750,000 |