Aaron Lobas
- License
- C82285
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C82285 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Osborn Enginnering
- Based in
- Cleveland
- On San Francisco permits
- May 2019 to Dec 2019
3 permits since 2000 (engineer on 3 permits): 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Wadleigh Group, Inc. (3)
- Engineers
- Kirk A Fry (3), Sean Johnson
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterationsDetails
alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterations | $500,000 |
| Aug 15, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterationsDetails
alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations | $750,000 |
| May 21, 2019 | Never finaled issued Aug 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split systemDetails
alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split system | $550,000 |