Permit GraphShortlistSan Francisco building permits since 2000

Diep Nguyen

License
10867
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
On San Francisco permits
Nov 2022 to Nov 2022

1 permit since 2000 (engineer on 1 permit): 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
De Silva Gates Construction
Engineers
Christopher Guillard, Julio C. Herdocia, Thomas Morse

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 29, 2022Completed
final sign-off Apr 2023
28 Bruton StDe Silva Gates Constructionfire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.
Details
Permit
202211297332
Permit issued
Mar 17, 2023
Final sign-off
Apr 3, 2023

fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.

Open the permit page