Steven Hall
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Shc
- Based in
- Novato
- On San Francisco permits
- Dec 2003 to Feb 2026
100 permits since 2000 (architect on 94 permits, engineer on 3 permits, authorized agent-others on 2 permits, designer on 1 permit): 45 completed, 15 in progress, 17 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2026 | In progress issued Mar 2026 | 1140 Folsom St | C T W Mechanical | install 2 electric projecting single faced signs: (chaat diner)Details
install 2 electric projecting single faced signs: (chaat diner) | $2,500 |
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 2165 Polk St | Kdc Construction | to comply with 202424172- after the fact permit to comply with like for like door replacement. only doors replaced . new doors connected back to (e) powered overhead closers which were not altered/replacedDetails
to comply with 202424172- after the fact permit to comply with like for like door replacement. only doors replaced . new doors connected back to (e) powered overhead closers which were not altered/replaced | $12,100 |
| Nov 25, 2025 | In progress filed Nov 2025, not yet issued | 788 17th Av | legalize udu at (e) garage rear via state adu program. no structural work is planned under this scope of work.Details
legalize udu at (e) garage rear via state adu program. no structural work is planned under this scope of work. | $40,000 | |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 1511 Haight St | Roman Hunt | renovation of an existing music venue out of operation for several years. owners proposing barrier remediation with enlarged restroom, new finishes, and lighting throughout public area. new sound baffling to replace existing, reuse existing storerront doors. replace non functional power door operatoDetails
renovation of an existing music venue out of operation for several years. owners proposing barrier remediation with enlarged restroom, new finishes, and lighting throughout public area. new sound baffling to replace existing, reuse existing storerront doors. replace non functional power door operato | $150,000 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 1138 Folsom St | C T W Mechanical | remove a counter and associated seats from approved seating plans to provide limited retail grocery use in (e) restaurant still under construction . overall occupancy will be reduced slighty based on use proposed per attached plansDetails
remove a counter and associated seats from approved seating plans to provide limited retail grocery use in (e) restaurant still under construction . overall occupancy will be reduced slighty based on use proposed per attached plans | |
| Apr 25, 2025 | In progress filed Apr 2025, not yet issued | 60 Clipper Cove Wy | new bar in open existing area in existing historic bldg. work consists of new millwork bar, finishes, bar equipmentDetails
new bar in open existing area in existing historic bldg. work consists of new millwork bar, finishes, bar equipment | $50,000 | |
| Dec 16, 2024 | Expired or cancelled withdrawn Feb 2025 | 788 17th Av | permit (e) in-law dwelling unit at the rear portion of (e) ground flr. no change to (e) from 2nd and 3rd flr residences. no structural work proposed or planned under this permit. to comply w/ nov# 202302370Details
permit (e) in-law dwelling unit at the rear portion of (e) ground flr. no change to (e) from 2nd and 3rd flr residences. no structural work proposed or planned under this permit. to comply w/ nov# 202302370 | $25,000 | |
| Jun 10, 2024 | Completed final sign-off Sep 2024 | 733 Front St | Cornerstone Dba Ag Construction | revision to pa 202402025140 field condition rebuild 2 shower stalls to match previous conditions due to dryrot damage.Details
revision to pa 202402025140 field condition rebuild 2 shower stalls to match previous conditions due to dryrot damage. | |
| Mar 7, 2024 | Completed final sign-off Apr 2024 | 54 Geary St | Alsterlind Construction Inc. | revision to approved bpa# 202309207060: to revise lighting. all lighting scope removed, existing lighting to remain.Details
revision to approved bpa# 202309207060: to revise lighting. all lighting scope removed, existing lighting to remain. | |
| Feb 12, 2024 | In progress issued Feb 2024 | 60 Clipper Cove Wy | Yes General Construction Builder Llc | revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinksDetails
revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinks | |
| Feb 7, 2024 | In progress filed Feb 2024, not yet issued | 5900 Mission St | provide accessible striping area for entry clearance. abe# 202401319362Details
provide accessible striping area for entry clearance. abe# 202401319362 | $1,000 | |
| Jan 23, 2024 | Completed final sign-off Mar 2026 | 1140 Folsom St | C T W Mechanical | new interior buildout of an a occupancy restaurant. no exterior changes. leveling floor to be provided due to sloping (e) conditions. new hood & conditioning systems, new electrical distributions system, new plumbing systems.Details
new interior buildout of an a occupancy restaurant. no exterior changes. leveling floor to be provided due to sloping (e) conditions. new hood & conditioning systems, new electrical distributions system, new plumbing systems. | $450,000 |
| Nov 27, 2023 | In progress filed Nov 2023, not yet issued | 2439 Ocean Av | to comply with accessible business entrance program ord. 51-16. ref abe 202207042307. construction of new sloped approach and new pad at entery to provide equivalent facilitation.Details
to comply with accessible business entrance program ord. 51-16. ref abe 202207042307. construction of new sloped approach and new pad at entery to provide equivalent facilitation. | $15,000 | |
| Nov 22, 2023 | Completed final sign-off Oct 2024 | 3107 Pierce St | Diamond Glass | abe# 20221054893. install new double leaf doors one 36" door and one 22" door. install new isa signage with contact phone# for assistance. request technical infeasibility as shown on cover plans.Details
abe# 20221054893. install new double leaf doors one 36" door and one 22" door. install new isa signage with contact phone# for assistance. request technical infeasibility as shown on cover plans. | $500 |
| Nov 22, 2023 | In progress filed Nov 2023, not yet issued | 963 Harrison St | abe# 201902054912, concrete work only for excessive slope, barrier removed in path of travel from public way to area of customer services.Details
abe# 201902054912, concrete work only for excessive slope, barrier removed in path of travel from public way to area of customer services. | $15,000 | |
| Oct 26, 2023 | In progress filed Oct 2023, not yet issued | 1503 20th St | to comply with abe 201906035844. install isa signage w/ contact phone # for assistance. request technical facilitation as shown on plans.Details
to comply with abe 201906035844. install isa signage w/ contact phone # for assistance. request technical facilitation as shown on plans. | ||
| Oct 13, 2023 | In progress filed Oct 2023, not yet issued | 3633 California St | to comply with abe#: 201912059260; technical infeasiblity as shown on plans. provide isa signage and door buzzerDetails
to comply with abe#: 201912059260; technical infeasiblity as shown on plans. provide isa signage and door buzzer | $3,000 | |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 3319 Sacramento St | to comply w/ abe# 201902115066, barrier remediation as identified on plans per abe checklist compliance form. technical infeasibilty work shown on plans, provide push bottom behind property line & assistance signageDetails
to comply w/ abe# 201902115066, barrier remediation as identified on plans per abe checklist compliance form. technical infeasibilty work shown on plans, provide push bottom behind property line & assistance signage | $3,000 | |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 2269 Market St | to comply w/ abe# 202206241687, technical infeasibility as shown on plans. provide signage and door buzzerDetails
to comply w/ abe# 202206241687, technical infeasibility as shown on plans. provide signage and door buzzer | $3,000 | |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 2267 Market St | barrier remdiation as identified o plans per abe checklist compliance form. equivalent facilitation as shown on plans. existing 9.6% landing with existing power door opender/push buttons (existing equivalent facilitation) abe 201902084972Details
barrier remdiation as identified o plans per abe checklist compliance form. equivalent facilitation as shown on plans. existing 9.6% landing with existing power door opender/push buttons (existing equivalent facilitation) abe 201902084972 | ||
| Sep 27, 2023 | Completed final sign-off Jul 2024 | 862 Folsom St | to comply with abe# 201812132950, barrier remediation as identified on plans per abe checklist compliance form, technical infeasibility request as shown on plans.Details
to comply with abe# 201812132950, barrier remediation as identified on plans per abe checklist compliance form, technical infeasibility request as shown on plans. | $5,000 | |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 3251 20th Av | Gray West Construction Inc | p182: millwork & stainless update - wall/floor finish update - paint/refinish walls - equipment replacement. (e) mechanical hvac to remainDetails
p182: millwork & stainless update - wall/floor finish update - paint/refinish walls - equipment replacement. (e) mechanical hvac to remain | $150,000 |
| Sep 20, 2023 | Completed final sign-off Apr 2024 | 54 Geary St | Alsterlind Construction Inc. | modification to shape of upper mezzanine opening and infill bridge area, millwork. replace bathroom sink, remove non structural walls gr flDetails
modification to shape of upper mezzanine opening and infill bridge area, millwork. replace bathroom sink, remove non structural walls gr fl | $75,000 |
| Sep 14, 2023 | Never finaled filed Sep 2023, never issued | 4105 19th St | barrier remediation as identified on plans per abe checklist compliance form. equvilent facilitation (if any). provide isa signage at exteirio with buzzer for customer assistance. abe#: 202002041681.Details
barrier remediation as identified on plans per abe checklist compliance form. equvilent facilitation (if any). provide isa signage at exteirio with buzzer for customer assistance. abe#: 202002041681. | $1,000 | |
| Sep 14, 2023 | Never finaled filed Sep 2023, never issued | 4107 19th St | barrier remediation as identified on plans per abe checklist compliance form. equivalent faciliation (if any) work as show on plans. provide isa signage at exterior with buzzer for customer assistance. abe# 202002041682Details
barrier remediation as identified on plans per abe checklist compliance form. equivalent faciliation (if any) work as show on plans. provide isa signage at exterior with buzzer for customer assistance. abe# 202002041682 | $1,000 | |
| Sep 14, 2023 | Never finaled filed Sep 2023, never issued | 4147 19th St | to comply with the abe program. barrier remediation as identified on plans per abe checklist compliance form, provide isa signage at exterior with buzzer for customer assistance. abe# 202002041685.Details
to comply with the abe program. barrier remediation as identified on plans per abe checklist compliance form, provide isa signage at exterior with buzzer for customer assistance. abe# 202002041685. | $1,000 | |
| Sep 14, 2023 | In progress issued Nov 2023 | 1201 Noe St | barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work (if nay) as shown on plans. provide assistance buzzer for assistance with steps as well as door operation for 50" opening. abe 202204270590. to comply with abe programDetails
barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work (if nay) as shown on plans. provide assistance buzzer for assistance with steps as well as door operation for 50" opening. abe 202204270590. to comply with abe program | $1,000 | |
| Sep 7, 2023 | Completed final sign-off Jan 2024 | 737 Cortland Av | Real Construction | barrier remediation as identified on plans per abe checklist compliance form. equivalent faciliation (if any) work as show on plans. abe# 201807201696Details
barrier remediation as identified on plans per abe checklist compliance form. equivalent faciliation (if any) work as show on plans. abe# 201807201696 | $2,500 |
| Aug 16, 2023 | Never finaled filed Aug 2023, never issued | 3614 Taraval St | add handicap accessible entrance to comply with abe program. push button door to be added, abe# 202307187895.Details
add handicap accessible entrance to comply with abe program. push button door to be added, abe# 202307187895. | $5,000 | |
| Aug 15, 2023 | In progress issued Feb 2024 | 5840 Geary Bl | Deleon Builders Inc | barrer removal-mitigate 3" ht entry step by sidewalk repouring.Details
barrer removal-mitigate 3" ht entry step by sidewalk repouring. | $3,000 |
| Aug 8, 2023 | Never finaled filed Aug 2023, never issued | 3865 Irving St | to comply with accessible business entrance per ord 51-16. barrier removal only per 11b-202.4 exc 4; modify accessible route from public way to 5% max slope direction of taravel. modify landing to meet minimum requirements. remove door barriers. ref abe 202306067493Details
to comply with accessible business entrance per ord 51-16. barrier removal only per 11b-202.4 exc 4; modify accessible route from public way to 5% max slope direction of taravel. modify landing to meet minimum requirements. remove door barriers. ref abe 202306067493 | $12,000 | |
| Jul 31, 2023 | Completed final sign-off Dec 2023 | 366 West Portal Av | Kerley Construction Inc | barrier remddiation as identified on plans, abe checklist compliance form. equivalent facilitation as shown on plans, abe # 201901104131Details
barrier remddiation as identified on plans, abe checklist compliance form. equivalent facilitation as shown on plans, abe # 201901104131 | $2,500 |
| Jul 31, 2023 | Never finaled filed Jul 2023, never issued | 48 Vicente St | barrier remediation as identified on plans per abe checklist compliance form, technical infeasibility and or equivalent facilitation as shown on plans. abe# 202305187256Details
barrier remediation as identified on plans per abe checklist compliance form, technical infeasibility and or equivalent facilitation as shown on plans. abe# 202305187256 | $5,000 | |
| Jul 31, 2023 | Never finaled filed Jul 2023, never issued | 99 West Portal Av | barrier remddiation as identified on plans, abe checklist compliance form. equipement facilitation if any as shown on plans, abe # 2023051887258Details
barrier remddiation as identified on plans, abe checklist compliance form. equipement facilitation if any as shown on plans, abe # 2023051887258 | $2,500 | |
| Jul 31, 2023 | Completed final sign-off Dec 2023 | 364 West Portal Av | Kerley Construction Inc | barrier remediation as identified on plans per abe checklist compliance form, equivalent facilitation (if any) as shown on plans. abe# 201901104130. to comply with abe ordinance 51-16Details
barrier remediation as identified on plans per abe checklist compliance form, equivalent facilitation (if any) as shown on plans. abe# 201901104130. to comply with abe ordinance 51-16 | $2,500 |
| Jul 19, 2023 | In progress issued Jun 2024 | 2199 Mission St | Umanzor Construction Inc. | barrier removal for (e) restaurant consisting of technical infeasibility paperwork as well as health department requirements to accommodate current code standards. no hood in place or proposed. any accessibility work to be respectful of historic nature of buildingDetails
barrier removal for (e) restaurant consisting of technical infeasibility paperwork as well as health department requirements to accommodate current code standards. no hood in place or proposed. any accessibility work to be respectful of historic nature of building | $30,000 |
| Jul 18, 2023 | Never finaled filed Jul 2023, never issued | 701 Ofarrell St | technically infeasibility for abe ordinance 51-16. barrier removal as identified on plans per abe checklist compliance fomr. equivalent facilitation (if any) work as shown on plans. install door buzzer. abe 202205190893.Details
technically infeasibility for abe ordinance 51-16. barrier removal as identified on plans per abe checklist compliance fomr. equivalent facilitation (if any) work as shown on plans. install door buzzer. abe 202205190893. | $1,000 | |
| Jun 21, 2023 | Expired or cancelled cancelled Jan 2026 | 1851 Powell St | barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. abe # 201911017667Details
barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. abe # 201911017667 | $750 | |
| Jun 12, 2023 | Never finaled issued Oct 2023, no final | 151 Braghetta Ln | Cal C A D E Construction Inc | treasure island bldg #2: new team sports venue location in (e) historic bldg. leveling (e) concrete pad, install prefab courts for pickleball and padelball, install temp accessible restroom/accessible parking/route to area of use for customers and employees. no spectator seating. max 49 occup load.Details
treasure island bldg #2: new team sports venue location in (e) historic bldg. leveling (e) concrete pad, install prefab courts for pickleball and padelball, install temp accessible restroom/accessible parking/route to area of use for customers and employees. no spectator seating. max 49 occup load. | $39,500 |
| May 8, 2023 | Expired or cancelled cancelled Jan 2026 | 4291 24th St | to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190897. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans. provide power door operatorDetails
to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190897. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans. provide power door operator | $2,500 | |
| May 8, 2023 | Expired or cancelled cancelled Jan 2026 | 4299 24th St | to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190896. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans. provide power door operatorDetails
to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190896. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans. provide power door operator | $2,500 | |
| May 1, 2023 | Expired or cancelled cancelled Jan 2026 | 445 Stockton St | barrier remediation as identified on plans per abe checklike compliance form equipment facilitation if any work as shown on plans, abe# 201909236389Details
barrier remediation as identified on plans per abe checklike compliance form equipment facilitation if any work as shown on plans, abe# 201909236389 | $750 | |
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 447 Stockton St | barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. to comply w/abe # 201909236391. provide signage & reverse door swing toward interiorDetails
barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. to comply w/abe # 201909236391. provide signage & reverse door swing toward interior | ||
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 603 Bush St | barrier remediation as identified on plans per abe checklist compliance form. equiv facilitation if any as shown on plans abe 20196386386Details
barrier remediation as identified on plans per abe checklist compliance form. equiv facilitation if any as shown on plans abe 20196386386 | $2,500 | |
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 601 Bush St | barrier remediation as identified on plans per abe checklist compiance form. technical infeasibility request.Details
barrier remediation as identified on plans per abe checklist compiance form. technical infeasibility request. | $750 | |
| Apr 24, 2023 | Completed final sign-off Feb 2024 | 1878 Union St | (barrier removal only per 11b-202.4 exc 4). barrier remediation as indentified on plans per abe checklist compliance form. equivalent facilitation (if any) work as shown on plans. abe#201912099567. exterior work onlyDetails
(barrier removal only per 11b-202.4 exc 4). barrier remediation as indentified on plans per abe checklist compliance form. equivalent facilitation (if any) work as shown on plans. abe#201912099567. exterior work only | $2,500 | |
| Apr 3, 2023 | Completed final sign-off Aug 2025 | 622 Clement St | Deleon Builders Inc | accessible business entrance program per ordinance 51-16. ref abe 202301035929. excemptton for accessibility work as provided under 118-404.1 exception 1 addition of assistance signage per detailsDetails
accessible business entrance program per ordinance 51-16. ref abe 202301035929. excemptton for accessibility work as provided under 118-404.1 exception 1 addition of assistance signage per details | $1,500 |
| Feb 13, 2023 | Expired or cancelled cancelled Jan 2026 | 3267 19th St | new driveway curbcut at existing siewalk, add one car garage to existing storage space, open front elevation for 8' wide garage door.Details
new driveway curbcut at existing siewalk, add one car garage to existing storage space, open front elevation for 8' wide garage door. | $20,000 | |
| Dec 19, 2022 | Expired or cancelled cancelled Jan 2026 | 4297 24th St | to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190895. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans.Details
to comply with abe program/technical infeasibility or unreasonable hardship/ord 51-16, abe#202205190895. barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans. | $750 | |
| Dec 19, 2022 | Completed final sign-off Mar 2025 | 2299 Chestnut St | barrier remediation as identified on plans per abe checklict compliance form, equivalent facilitation work as shown on plans. abe #202206131388Details
barrier remediation as identified on plans per abe checklict compliance form, equivalent facilitation work as shown on plans. abe #202206131388 | $12,000 | |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 3835 Mission St | to comply with accessible entrance program per ordinance 51-16. abe#202212085510. isa signage/assistance buzzer @ ext front door; provide metal transition strip/rework tile to reduce barrier @ entry ramp; replace door knob w/commercial lever; remove/affix loose doormat to slab. unreasonable hardshipDetails
to comply with accessible entrance program per ordinance 51-16. abe#202212085510. isa signage/assistance buzzer @ ext front door; provide metal transition strip/rework tile to reduce barrier @ entry ramp; replace door knob w/commercial lever; remove/affix loose doormat to slab. unreasonable hardship | $500 | |
| Dec 6, 2022 | Completed final sign-off Jul 2024 | 3357 Mission St | barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans to comply with abe# 202206081339. for 3357 mission entrance.Details
barrier remediation as identified on plans per abe checklist compliance form. equivalent facilitation work as shown on plans to comply with abe# 202206081339. for 3357 mission entrance. | $1,000 | |
| Dec 2, 2022 | Completed final sign-off Sep 2023 | 60 Clipper Cove Wy | Yes General Construction Builder Llc | new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment.Details
new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment. | $50,000 |
| Nov 28, 2022 | Completed final sign-off May 2023 | 937 Geary St | Clever Construction Inc | barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012298. isa signage and buzzer @ front gate.Details
barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012298. isa signage and buzzer @ front gate. | $2,000 |
| Nov 28, 2022 | Completed final sign-off Jun 2023 | 941 Geary St | Clever Construction Inc | barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012300. power door operator @ storefront.Details
barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012300. power door operator @ storefront. | $2,000 |
| Nov 28, 2022 | Completed final sign-off Jun 2023 | 939 Geary St | Clever Construction Inc | barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012299. isa signage and buzzer @ front wall.Details
barrier remediation as identified in plans per abe checklist camplaince form. equipment facilitation work as showm in plas, to comply w/ accessible business entrance program #202207012299. isa signage and buzzer @ front wall. | $2,000 |
| Nov 18, 2022 | Expired or cancelled cancelled Jan 2026 | 3492 22nd St | Federico Cusigch | barrier removal project. front entrance ramp and electric door for ada access. restroom conversion for ada access.Details
barrier removal project. front entrance ramp and electric door for ada access. restroom conversion for ada access. | $43,000 |
| Oct 6, 2022 | Completed final sign-off Jul 2023 | 2033 Taraval St | Kerley Construction Inc | barrioer remediation at non-compliance sloped entry to (e) door at street. technical issues with remediation of (e) sloping christy boxes at entry landing at ext. int level is scope proposed is power door opener only. addition of powered door operator per da-04 for access to new entry in lieu of ...Details
barrioer remediation at non-compliance sloped entry to (e) door at street. technical issues with remediation of (e) sloping christy boxes at entry landing at ext. int level is scope proposed is power door opener only. addition of powered door operator per da-04 for access to new entry in lieu of ... | $10,000 |
| Sep 21, 2022 | Expired or cancelled cancelled Jan 2026 | 485 Carolina St | provide (n) accessible restroomDetails
provide (n) accessible restroom | $8,000 | |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 516 Green St | Gene Catania Construction | renovation of e restaurant, new floor sink, grease trap, power door opener to provide compliance. paint existing type 1 hood. (e) kitchen equipment to remainDetails
renovation of e restaurant, new floor sink, grease trap, power door opener to provide compliance. paint existing type 1 hood. (e) kitchen equipment to remain | $25,000 |
| Aug 24, 2022 | Never finaled issued Sep 2023, no final | 3286 Mission St | B & B Construction | barrier remediation at non-compliant sloped entry from street per below addition of power door opening, per da-04 for access on new entry in leiu of door pull clearance due to (e) concrete slope @ slabDetails
barrier remediation at non-compliant sloped entry from street per below addition of power door opening, per da-04 for access on new entry in leiu of door pull clearance due to (e) concrete slope @ slab | $15,000 |
| Aug 22, 2022 | Expired or cancelled cancelled Jan 2026 | 3379 26th St | barrier remediation at non compliant stepped entry from street: scope requires removal of concrete steps and replacement with extension and interior ramp, lowering of e storefront door. additon of powered door opener per da-04 for access on new entry ramp. reconfig non compliant restroom to complyDetails
barrier remediation at non compliant stepped entry from street: scope requires removal of concrete steps and replacement with extension and interior ramp, lowering of e storefront door. additon of powered door opener per da-04 for access on new entry ramp. reconfig non compliant restroom to comply | $20,000 | |
| Aug 22, 2022 | Expired or cancelled cancelled Jan 2026 | 3389 26th St | barrier remediation at non compliant sloped entry from street on the interior: scope requieres removal of concrete and replacment with int sloped access. addition of powered doo opener per da 04 for access on new entry in lieu of door pull clearances due to e concrete sloping at slabDetails
barrier remediation at non compliant sloped entry from street on the interior: scope requieres removal of concrete and replacment with int sloped access. addition of powered doo opener per da 04 for access on new entry in lieu of door pull clearances due to e concrete sloping at slab | $15,000 | |
| Jul 14, 2022 | Completed final sign-off Oct 2022 | 1400 California St | Gene Catania Construction | new kitchen to replace removed euipment from prior operation. finishes (paint and floor repair) to be addressed. restroom and bar rehabilitation work to provide compliant access. abe 201812313607Details
new kitchen to replace removed euipment from prior operation. finishes (paint and floor repair) to be addressed. restroom and bar rehabilitation work to provide compliant access. abe 201812313607 | $10,000 |
| Jun 22, 2022 | Completed final sign-off Feb 2025 | 1002 Naples St | Clever Construction Inc | abe#202206132297 - barrier remediation at non compliant front entry. scope required equivalent faciliation (if any) work as shown on plans.Details
abe#202206132297 - barrier remediation at non compliant front entry. scope required equivalent faciliation (if any) work as shown on plans. | $10,000 |
| May 24, 2022 | Never finaled issued Jun 2022, no final | 3426 Sacramento St | Landmark Construction Inc. | barrier remediation at non-compliant stepped fron entry & elevated landing. addition of powered door opener per da-04 for access at new entry landing reconfiguration of (e) restroom to provide complaint restroom. voluntary seismic upgrade at ground floor.Details
barrier remediation at non-compliant stepped fron entry & elevated landing. addition of powered door opener per da-04 for access at new entry landing reconfiguration of (e) restroom to provide complaint restroom. voluntary seismic upgrade at ground floor. | $75,000 |
| May 10, 2022 | Completed final sign-off May 2023 | 1196 Geneva Av | Clever Construction Inc | barrier removal work to comply with accessible business entrance. ref abe 202207012296. provide new assistance buzzer, request technical infeasibility.Details
barrier removal work to comply with accessible business entrance. ref abe 202207012296. provide new assistance buzzer, request technical infeasibility. | $40,000 |
| May 9, 2022 | Completed final sign-off Feb 2023 | 5196 Mission St | Rinaldi Construction | barrier removal work.Details
barrier removal work. | $25,000 |
| Apr 20, 2022 | Completed final sign-off Sep 2023 | 1601 Mariposa St | Hasz Construction Inc | new interior built out of 3 restaurant venues with shared common kitchen - air intake louvers - new kitchen, new hood, new electrical , new plumbing - sprinkler (existing) and new fire alarm under seperate permitDetails
new interior built out of 3 restaurant venues with shared common kitchen - air intake louvers - new kitchen, new hood, new electrical , new plumbing - sprinkler (existing) and new fire alarm under seperate permit | $1,000,000 |
| Feb 8, 2022 | Expired or cancelled cancelled Jan 2026 | 2899 Mission St | barrier remediation at non-compliant ramped front entry only. no other work will be performed under this permit. per 51-16 abeDetails
barrier remediation at non-compliant ramped front entry only. no other work will be performed under this permit. per 51-16 abe | $2,000 | |
| Feb 1, 2022 | Expired or cancelled cancelled Jan 2026 | 3001 Mission St | to comply with abe ord 51-16 provice accessible entry solutions in city right of way for existing no compliant building ground floor tenant spacesDetails
to comply with abe ord 51-16 provice accessible entry solutions in city right of way for existing no compliant building ground floor tenant spaces | $35,000 | |
| Jan 13, 2022 | Completed final sign-off Aug 2022 | 3640 Sacramento St | True Line Builders Inc | kitchen equipment replacement.Details
kitchen equipment replacement. | $100,000 |
| Jan 5, 2022 | Completed final sign-off Aug 2022 | 3017 Mission St | barrier removal, handicap bathroomDetails
barrier removal, handicap bathroom | $10,000 | |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 3585 California St | Lewis M Merlo Inc | rework existing parking to provide compliant parking space, see also 202111152427Details
rework existing parking to provide compliant parking space, see also 202111152427 | $12,500 |
| Nov 15, 2021 | Completed final sign-off Mar 2022 | 3595 California St | Lewis M Merlo Inc | rework existing parking and provide compliant parking spaceDetails
rework existing parking and provide compliant parking space | $25,000 |
| Aug 5, 2021 | Expired or cancelled cancelled Jan 2026 | 3419 California St | interior renovation for (e) coffee shop, repair/replacement of (e) millwork, finishes, light fixtures, upgrade accessible restroomDetails
interior renovation for (e) coffee shop, repair/replacement of (e) millwork, finishes, light fixtures, upgrade accessible restroom | $250,000 | |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 1000 Larkin St | Terra Nova Industries | revision to 201512285972, lighting reduction throughout.Details
revision to 201512285972, lighting reduction throughout. | |
| Jun 3, 2016 | Never finaled issued Jun 2016, no final | 1000 Larkin St | Terra Nova Industries | wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13Details
wall clarifications to existing pa#201507080981, lighting revisions with title -24. relocate of ductwork in basementunit. n/a ordinance #155-13 | $4,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 1000 Larkin St | Alsterlind Construction Inc. | demo only non structural while waiting on ti permit commercial demo only, no residential or exterior scope of work only demolition of non structural elements in prepartation for ti permit issuance ref pa 2015-0708-0981. n/a maher ordinanceDetails
demo only non structural while waiting on ti permit commercial demo only, no residential or exterior scope of work only demolition of non structural elements in prepartation for ti permit issuance ref pa 2015-0708-0981. n/a maher ordinance | $8,700 |
| Jun 19, 2013 | Completed final sign-off Oct 2013 | 351 Divisadero St | change of use - tenant improvement (695 sq ft) for barber shop, partition walls, t-bar ceiling flooring, upgrade existing unisex restroom. add new power door opener.Details
change of use - tenant improvement (695 sq ft) for barber shop, partition walls, t-bar ceiling flooring, upgrade existing unisex restroom. add new power door opener. | $21,000 | |
| Mar 27, 2013 | Completed final sign-off Jan 2014 | 3251 20th Av | W G Fritz Construction Inc. | space 172:tenant improvement. 2591 sq ft bakery.Details
space 172:tenant improvement. 2591 sq ft bakery. | $280,000 |
| Jan 3, 2013 | Completed final sign-off Oct 2014 | 201 Spear St | Swinerton Builders | interior ti to (e) office space on floors 8 & 9. work to include new conference rooms, pantry food prep room & communicating stairs connecting the 8th & 9th. includes mechanical and electrical. floors 8-9 becoming one zone for mechanical and fire alarm. sprinlers & fire alarm sep. permit.Details
interior ti to (e) office space on floors 8 & 9. work to include new conference rooms, pantry food prep room & communicating stairs connecting the 8th & 9th. includes mechanical and electrical. floors 8-9 becoming one zone for mechanical and fire alarm. sprinlers & fire alarm sep. permit. | $1,500,000 |
| Dec 7, 2012 | Completed final sign-off Sep 2013 | 601 Montgomery St | Jones Lang La Salle Construction Company | tenant improvement, demo of non structural walls. modificiation of existing, ceiling, lighting, mechanical system. new office room and teller station. no change to use, occupancy.egress, plumbing elect, mechanical life safety fire sprinklerDetails
tenant improvement, demo of non structural walls. modificiation of existing, ceiling, lighting, mechanical system. new office room and teller station. no change to use, occupancy.egress, plumbing elect, mechanical life safety fire sprinkler | $200,000 |
| Oct 24, 2012 | Never finaled issued Nov 2012, no final | 601 Montgomery St | Jones Lang La Salle Construction Company | tenant improvement - demo of non structural walls, 2 new handicap bathroom, break room, offices, plumbing, electrical, mechanical, life safety - fire sprinklers. work on the 15th floor only. single t.i occupancy. remove (e) non load bearing partitions. modifications to (e) ceilings, lighting & mech.Details
tenant improvement - demo of non structural walls, 2 new handicap bathroom, break room, offices, plumbing, electrical, mechanical, life safety - fire sprinklers. work on the 15th floor only. single t.i occupancy. remove (e) non load bearing partitions. modifications to (e) ceilings, lighting & mech. | $700,000 |
| Mar 30, 2012 | Never finaled issued Apr 2012, no final | 371 Fair Oaks St | C & A Builders | 3rd floor only-remove (e) water heater & replace with tankless in attic. remodel kitchen, relocate refrigeratorDetails
3rd floor only-remove (e) water heater & replace with tankless in attic. remodel kitchen, relocate refrigerator | $25,000 |
| Oct 29, 2010 | Never finaled issued Jan 2011, no final | 178 Portola Dr | Southgate Home Design Inc | relocate laundry appliances for (n) media room, to include small bath - 314 sf coversion of (e) garage.Details
relocate laundry appliances for (n) media room, to include small bath - 314 sf coversion of (e) garage. | $39,903 |
| Mar 3, 2009 | Completed final sign-off Apr 2010 | 1485 Bay Shore Bl | Benson & Son Electric | exterior installation of diesel geneator (generac sd250) for emergency back-up power to maintain public communication systems includes concrete pad, bollards, feeders to (e) electric room.Details
exterior installation of diesel geneator (generac sd250) for emergency back-up power to maintain public communication systems includes concrete pad, bollards, feeders to (e) electric room. | $90,000 |
| Aug 20, 2008 | Expired or cancelled expired Jun 2011 | 721 Market St | change of ownership of (e) restaurant-tenant improvement. new kitchen hood, cabinets, finish work, restroom improvements. new counter and equipment hook-up. ref. appl#200807227318 for area of seperation & exit.Details
change of ownership of (e) restaurant-tenant improvement. new kitchen hood, cabinets, finish work, restroom improvements. new counter and equipment hook-up. ref. appl#200807227318 for area of seperation & exit. | $125,000 | |
| Jun 12, 2008 | Completed final sign-off Dec 2008 | 2250 Chestnut St | mechanical only, type 1 ventless hood with type 2 over ventless hoods, title 24 lighting. reference pa# 2007-0809-9290/2 type 2 hood in single riserDetails
mechanical only, type 1 ventless hood with type 2 over ventless hoods, title 24 lighting. reference pa# 2007-0809-9290/2 type 2 hood in single riser | $15,000 | |
| Sep 19, 2007 | Completed final sign-off Jun 2008 | 1700 Owens St | new coffee retail establihment ( starbucks) in commercial retail space. one handicap bathroom, new counter, new non-structural walls, ceiling, electrical, plumbing, equipment, floor tiles, new heat and ventilation.Details
new coffee retail establihment ( starbucks) in commercial retail space. one handicap bathroom, new counter, new non-structural walls, ceiling, electrical, plumbing, equipment, floor tiles, new heat and ventilation. | $150,000 | |
| Aug 29, 2007 | Completed final sign-off Feb 2008 | 5455 Geary Bl | J. M. Maita Construction Inc. | renovation of existing starbucks coffee- replace cabinets, equipment, demolition of soffit and replace with new lighting, relocate casework & misc. items.Details
renovation of existing starbucks coffee- replace cabinets, equipment, demolition of soffit and replace with new lighting, relocate casework & misc. items. | $60,000 |
| Oct 3, 2006 | Expired or cancelled expired May 2008 | 595 Market St | erect painted wall signDetails
erect painted wall sign | ||
| Apr 25, 2006 | Expired or cancelled expired Feb 2008 | 675 Townsend St | new coffee company starbucks, new bathrooms, non load barrier wall, counter casework, shelfs & display area. m.e.p. under seperate permit.Details
new coffee company starbucks, new bathrooms, non load barrier wall, counter casework, shelfs & display area. m.e.p. under seperate permit. | $150,000 | |
| Apr 6, 2006 | Expired or cancelled expired Jan 2008 | 865 Market St | interior remodeling of existing retail, convert to coffee shop, new partition walls, no load bearing, handicap bathroom, cabinets, shelves, countertop,sinks, mechanical work, new equipment, casework, lighting.Details
interior remodeling of existing retail, convert to coffee shop, new partition walls, no load bearing, handicap bathroom, cabinets, shelves, countertop,sinks, mechanical work, new equipment, casework, lighting. | $150,000 | |
| Aug 3, 2005 | Completed final sign-off Dec 2005 | 259 California St | commercial tenant imporvement. soft demo, replace cabinet & counter.Details
commercial tenant imporvement. soft demo, replace cabinet & counter. | $80,000 | |
| May 11, 2005 | Expired or cancelled cancelled Dec 2006 | 1600 Webster St | tenant improvement. elec, mech pl- walls equipment.Details
tenant improvement. elec, mech pl- walls equipment. | $80,000 | |
| Mar 9, 2005 | Completed final sign-off Aug 2005 | 425 Battery St | interior improvement for coffee sales - counters finishes, elec, mech, plumbing, restroom, equipmentDetails
interior improvement for coffee sales - counters finishes, elec, mech, plumbing, restroom, equipment | $80,000 | |
| Feb 3, 2005 | Completed final sign-off May 2005 | 211 Valencia St | plumbing work for kitchen eq.,hood,rebuild bar w/ hc.seating on grd fl rest.fire suppression........Details
plumbing work for kitchen eq.,hood,rebuild bar w/ hc.seating on grd fl rest.fire suppression........ | $50,000 | |
| Nov 29, 2004 | Completed final sign-off Mar 2005 | 2031 Chestnut St | new equipment add to existing equipment for restaurant, existing restroom, new counter,squeeze guardDetails
new equipment add to existing equipment for restaurant, existing restroom, new counter,squeeze guard | $35,000 | |
| Dec 15, 2003 | Completed final sign-off Nov 2005 | 2123 Fillmore St | kitchen&retail remodel modified storefront to conform to disabled access.fire alarm&sprinkler on sepDetails
kitchen&retail remodel modified storefront to conform to disabled access.fire alarm&sprinkler on sep | $50,000 |