Ray Juachon
- License
- E19586
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19586 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Integral Group
- Based in
- Oakland
- On San Francisco permits
- Aug 2017 to May 2024
6 permits since 2000 (engineer on 6 permits): 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (3), Gray West Construction Inc
- Architects
- David Masenten (3), Brennan Cox, Irving Gonzales, Ross A. Hummel, Steven Hall
- Engineers
- Matthew Dehgani (3), John Ward (2), John Ware
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | basement level: new back of house spaces sewing event staff and performers to be installed in the annex space. new spaces include dressing rooms, group viewing rooms, and single occupant shower/restroom. work includes multi-stall public restrooms and upgrades to (e) single user restrooms. (e) lift @Details
basement level: new back of house spaces sewing event staff and performers to be installed in the annex space. new spaces include dressing rooms, group viewing rooms, and single occupant shower/restroom. work includes multi-stall public restrooms and upgrades to (e) single user restrooms. (e) lift @ | $1,529,279 |
| Apr 8, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroomDetails
barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroom | $150,000 |
| Mar 18, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units.Details
improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units. | $1,200,000 |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 3251 20th Av | Gray West Construction Inc | p182: millwork & stainless update - wall/floor finish update - paint/refinish walls - equipment replacement. (e) mechanical hvac to remainDetails
p182: millwork & stainless update - wall/floor finish update - paint/refinish walls - equipment replacement. (e) mechanical hvac to remain | $150,000 |
| Oct 19, 2018 | Completed final sign-off Dec 2020 | 670 Brunswick St | demolition of existing children's play area & installation of new play equipment, planting & irrigation & seating. replacement of fencing & pathways to make them accessible. interior improvements to restroom to make them ada compliant. new safety lighting.Details
demolition of existing children's play area & installation of new play equipment, planting & irrigation & seating. replacement of fencing & pathways to make them accessible. interior improvements to restroom to make them ada compliant. new safety lighting. | $960,000 | |
| Aug 8, 2017 | Expired or cancelled cancelled Jan 2026 | 2945 16th St | project scope: replace utility meters serving commercial panels. upgrade meters from residential grade to commercial grade. n/a maherDetails
project scope: replace utility meters serving commercial panels. upgrade meters from residential grade to commercial grade. n/a maher | $62,400 |