John Ware
- Listed as
- engineer, pmt consultant/expediter
- Firm
- Endres Ware
- Based in
- Berkeley
- On San Francisco permits
- Feb 2010 to May 2022
5 permits since 2000 (engineer on 4 permits, pmt consultant/expediter on 1 permit): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2022 | Never finaled filed May 2022, never issued | 2814 Laguna St | landscape improvements in backyard. 695 sqft - new plantings artificial turf, retaining walls (3' max) landscape lighting, and hardscape. replace/ modify existing deck & steps. replace existing fence.Details
landscape improvements in backyard. 695 sqft - new plantings artificial turf, retaining walls (3' max) landscape lighting, and hardscape. replace/ modify existing deck & steps. replace existing fence. | $40,000 | |
| Oct 19, 2018 | Completed final sign-off Dec 2020 | 670 Brunswick St | demolition of existing children's play area & installation of new play equipment, planting & irrigation & seating. replacement of fencing & pathways to make them accessible. interior improvements to restroom to make them ada compliant. new safety lighting.Details
demolition of existing children's play area & installation of new play equipment, planting & irrigation & seating. replacement of fencing & pathways to make them accessible. interior improvements to restroom to make them ada compliant. new safety lighting. | $960,000 | |
| Apr 26, 2018 | Never finaled filed Apr 2018, never issued | 164 Townsend St | this project proposes the replacement of the built-up roofing atop 164 townsend st. an addition of a rooftop deck and conditioned space above an existing dwelling unit is concurrently proposed.Details
this project proposes the replacement of the built-up roofing atop 164 townsend st. an addition of a rooftop deck and conditioned space above an existing dwelling unit is concurrently proposed. | $550,000 | |
| Jun 9, 2011 | Completed final sign-off Nov 2012 | 1189 Stanyan St | Seddon Construction Co | replace (e) deck and (e) storage below with (n) enlarged deck and (n) enlarged storage. total of 100 sf. replace (e) outdoor patio & stair w/ (n) patio & (n) stair, hot tub. replace (e) retaining walls & stair with (n) retaining wall & stair.Details
replace (e) deck and (e) storage below with (n) enlarged deck and (n) enlarged storage. total of 100 sf. replace (e) outdoor patio & stair w/ (n) patio & (n) stair, hot tub. replace (e) retaining walls & stair with (n) retaining wall & stair. | $20,000 |
| Feb 4, 2010 | Completed final sign-off Feb 2012 | 1840 Washington St | revisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittalDetails
revisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittal |