Block 0285, lot 001
447 Stockton St
- City’s use
- Commercial Office
- Built
- 1923
- Stories
- 3
- Units
- 4
- Rooms
- 8 bathrooms
- Building
- 7,285 sq ft
- Lot
- 2,370 sq ft
- Zoning
- C3R
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2024 | In progress filed Apr 2024, not yet issued | 447 Stockton St | prop h: to replace sign on existing awning with new single face polyester wrap/bungie cord sign "infinity coven"Details
prop h: to replace sign on existing awning with new single face polyester wrap/bungie cord sign "infinity coven" | $50 | |
| May 1, 2023 | Expired or cancelled cancelled Jan 2026 | 445 Stockton St | barrier remediation as identified on plans per abe checklike compliance form equipment facilitation if any work as shown on plans, abe# 201909236389Details
barrier remediation as identified on plans per abe checklike compliance form equipment facilitation if any work as shown on plans, abe# 201909236389 | $750 | |
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 447 Stockton St | barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. to comply w/abe # 201909236391. provide signage & reverse door swing toward interiorDetails
barrier remediation as identified on plans per abe checklist compliance form equivalent facilitation (if any) work as shown on plans. to comply w/abe # 201909236391. provide signage & reverse door swing toward interior | ||
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 603 Bush St | barrier remediation as identified on plans per abe checklist compliance form. equiv facilitation if any as shown on plans abe 20196386386Details
barrier remediation as identified on plans per abe checklist compliance form. equiv facilitation if any as shown on plans abe 20196386386 | $2,500 | |
| Apr 28, 2023 | Expired or cancelled cancelled Jan 2026 | 601 Bush St | barrier remediation as identified on plans per abe checklist compiance form. technical infeasibility request.Details
barrier remediation as identified on plans per abe checklist compiance form. technical infeasibility request. | $750 | |
| Mar 27, 2019 | Completed final sign-off Jan 2020 | 441 Stockton St | First Restaurant Builders | ti - (e) beauty salon to be upgraded for more convience. includes: build new restroom in lounge area, add washer/drywe in (e) receptor. interior refined with new flooring and tile, etcDetails
ti - (e) beauty salon to be upgraded for more convience. includes: build new restroom in lounge area, add washer/drywe in (e) receptor. interior refined with new flooring and tile, etc | $10,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 441 Stockton St | street spaceDetails
street space | ||
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 601 Bush St | Standardconstr/Standardroof | re-roofingDetails
re-roofing | $18,390 |
| Aug 13, 2014 | Completed final sign-off Sep 2014 | 601 Bush St | window repair, windows has been a tag with acid. need to be replaced. in-kind with wood. to comply with notice of violation #201473801 dated 5/20/2014. same size, same location.Details
window repair, windows has been a tag with acid. need to be replaced. in-kind with wood. to comply with notice of violation #201473801 dated 5/20/2014. same size, same location. | $600 | |
| Apr 11, 2013 | Completed final sign-off Apr 2013 | 447 Stockton St | dig trench 24"x40'x18" deep to install drain pipe to collect underground water along side east wall of 447 stockton st, connect drain pipe to sump pump.Details
dig trench 24"x40'x18" deep to install drain pipe to collect underground water along side east wall of 447 stockton st, connect drain pipe to sump pump. | $5,000 | |
| Aug 1, 2012 | Completed final sign-off Mar 2013 | 603 Bush St | to complete work and obtain final inspection for work approved under pa# 200310036527.Details
to complete work and obtain final inspection for work approved under pa# 200310036527. | ||
| Mar 24, 2011 | Completed final sign-off Jul 2011 | 441 Stockton St | K K Electric & Alarm Company | installation of a simple fire alarm system to monitor the fire sprinkler.Details
installation of a simple fire alarm system to monitor the fire sprinkler. | $1,500 |
| Jan 31, 2011 | Completed final sign-off Apr 2011 | 441 Stockton St | Chen's Plumbing Inc | 1st & 2nd floor only - relocate & add fire sprinkler heads on existing system. 1st floor: add (2) new heads, replace (12) existing heads. 2nd floor: add (8) new heads, relocate (6) heads. replace 4" double check valve.Details
1st & 2nd floor only - relocate & add fire sprinkler heads on existing system. 1st floor: add (2) new heads, replace (12) existing heads. 2nd floor: add (8) new heads, relocate (6) heads. replace 4" double check valve. | $8,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 601 Bush St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jul 10, 2006 | Expired or cancelled expired Jul 2011 | 611 Bush St | renew for final only pa# 200510185922.Details
renew for final only pa# 200510185922. | ||
| Apr 18, 2006 | Never finaled issued Apr 2006, no final | 611 Bush St | street space permitDetails
street space permit | ||
| Mar 13, 2006 | Never finaled issued Mar 2006, no final | 611 Bush St | street space permitDetails
street space permit | ||
| Feb 14, 2006 | Never finaled issued Feb 2006, no final | 611 Bush St | street space permit only.Details
street space permit only. | ||
| Jan 9, 2006 | Never finaled issued Jan 2006, no final | 611 Bush St | street spaceDetails
street space | ||
| Dec 12, 2005 | Never finaled issued Dec 2005, no final | 611 Bush St | street space permitDetails
street space permit | ||
| Dec 7, 2005 | Never finaled issued Dec 2005, no final | 611 Bush St | street spaceDetails
street space | ||
| Nov 28, 2005 | Completed final sign-off Jul 2006 | 611 Bush St | new store front frames and glass replace front wndws on bush st and one on burrit stDetails
new store front frames and glass replace front wndws on bush st and one on burrit st | $3,300 | |
| Oct 18, 2005 | Completed final sign-off Jul 2006 | 611 Bush St | repair interior wall @ front bldg. enlarge walk-in beverage cooler.Details
repair interior wall @ front bldg. enlarge walk-in beverage cooler. | $15,000 | |
| Feb 17, 2004 | Expired or cancelled expired Jul 2005 | 603 Bush St | revision to 200310097113:fire suppression system installationDetails
revision to 200310097113:fire suppression system installation | ||
| Oct 9, 2003 | Expired or cancelled expired Jul 2005 | 603 Bush St | San Francisco Fire Protection | install fire suppression systemDetails
install fire suppression system | $1,700 |
| Oct 3, 2003 | Expired or cancelled expired Jul 2005 | 603 Bush St | comply w/nov 200343554; replace existing stairs to mezzanineDetails
comply w/nov 200343554; replace existing stairs to mezzanine | $1,000 | |
| Jun 5, 2000 | Expired or cancelled cancelled Jul 2005 | 607 Bush St | vertical addition of four stories of residential over a ground floor commercial levelDetails
vertical addition of four stories of residential over a ground floor commercial level | $1,200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Chen's Plumbing Inc, First Restaurant Builders, K K Electric & Alarm Company, San Francisco Fire Protection, Standardconstr/Standardroof
- Architects
- Steven Hall (4)
- Engineers
- Poh Chuang Yee
Find contractors for work like this