Poh Chuang Yee
- License
- C76024
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C76024 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2019 to Mar 2022
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- First Restaurant Builders, Green Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2022 | Completed final sign-off Aug 2022 | 577 Geary St | Green Construction | change of use from a coffe shop to a beauty salon. build 2 services area 230 sf total. install washer/ dryer. ada restroom. no massage or permanent body art services on site.Details
change of use from a coffe shop to a beauty salon. build 2 services area 230 sf total. install washer/ dryer. ada restroom. no massage or permanent body art services on site. | $30,000 |
| Mar 27, 2019 | Completed final sign-off Jan 2020 | 441 Stockton St | First Restaurant Builders | ti - (e) beauty salon to be upgraded for more convience. includes: build new restroom in lounge area, add washer/drywe in (e) receptor. interior refined with new flooring and tile, etcDetails
ti - (e) beauty salon to be upgraded for more convience. includes: build new restroom in lounge area, add washer/drywe in (e) receptor. interior refined with new flooring and tile, etc | $10,000 |