Block 0781, lot 010
762 Fulton St
- City’s use
- Commercial Misc
- Built
- 1935
- Stories
- 3
- Rooms
- 5 bathrooms
- Lot
- 11,343 sq ft
- Zoning
- RM2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 762 Fulton St | scope: voluntary seismic upgrade & renovation.including mechanical upgrade,new electrical swithgear.ada improvements,barrier-free improvements,envelope repairs,new sidewalk,egress improvements,new glazing and windows.Details
scope: voluntary seismic upgrade & renovation.including mechanical upgrade,new electrical swithgear.ada improvements,barrier-free improvements,envelope repairs,new sidewalk,egress improvements,new glazing and windows. | $12,500 | |
| Aug 25, 2021 | Completed final sign-off Dec 2021 | 762 Fulton St | Martin Sign Co Inc. | fabricate 6 evacuation maps with installation, 1x 1/f, 2x 2/f, 2x 3/f, 1x 4/f.Details
fabricate 6 evacuation maps with installation, 1x 1/f, 2x 2/f, 2x 3/f, 1x 4/f. | $2,000 |
| Jun 11, 2021 | Never finaled issued Aug 2021, no final | 762 Fulton St | Value Fire Protection Inc | relocation of (4) sprinkler heads on the second floor. plug (1) head.Details
relocation of (4) sprinkler heads on the second floor. plug (1) head. | $3,300 |
| Dec 30, 2019 | Never finaled issued Feb 2021, no final | 762 Fulton St | revision to pa #201805017873. to clarify occupancy use details per plan. no construction - no chnage to occupant load. establish occupancy for assembly permit only.Details
revision to pa #201805017873. to clarify occupancy use details per plan. no construction - no chnage to occupant load. establish occupancy for assembly permit only. | ||
| Nov 14, 2018 | Completed final sign-off Oct 2019 | 762 Fulton St | Acco Engineered Systems Inc. Dba Acco En | replace (e) duct heater w/ (n) heaters on roof. 5 new dsd'sDetails
replace (e) duct heater w/ (n) heaters on roof. 5 new dsd's | $10,000 |
| May 1, 2018 | Never finaled issued Jun 2018, no final | 762 Fulton St | Ccsf-Dept. Public Works | no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2.Details
no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2. | |
| Feb 26, 2018 | Never finaled issued Apr 2018, no final | 762 Fulton St | no construction. establish occupancy for assembly permit.Details
no construction. establish occupancy for assembly permit. | ||
| May 4, 2015 | Never finaled issued May 2015, no final | 762 Fulton St | upgrade electric panels down stream of main service. replace 30 kva transformerDetails
upgrade electric panels down stream of main service. replace 30 kva transformer | $75,000 | |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 762 Fulton St | Cosco Fire Protection Inc. | as built submittal for facu replacement. ref 2014-1203-2939.Details
as built submittal for facu replacement. ref 2014-1203-2939. | $5,000 |
| Dec 3, 2014 | Never finaled issued Dec 2014, no final | 762 Fulton St | Cosco Fire Protection Inc. | emergency facu replacement per csfm code interpretation 12-001 and information bulletin dated 9/4/2008Details
emergency facu replacement per csfm code interpretation 12-001 and information bulletin dated 9/4/2008 | $5,000 |
| Mar 22, 2013 | Completed final sign-off Nov 2013 | 762 Fulton St | ada barrier removal work. provide new accessible boys and girls toilets on 2nd fl. provide 1 janitor sink in janitor closet. provide sink and counter area on 3rd floor breakroom. replace egress door at exit stairDetails
ada barrier removal work. provide new accessible boys and girls toilets on 2nd fl. provide 1 janitor sink in janitor closet. provide sink and counter area on 3rd floor breakroom. replace egress door at exit stair | $70,000 | |
| Jan 20, 2011 | Completed final sign-off Apr 2011 | 762 Fulton St | Torres Construction Corp. | replacement of 4 existing furnaces with new gas fired units energy efficient. using ex equip rooms and locationsDetails
replacement of 4 existing furnaces with new gas fired units energy efficient. using ex equip rooms and locations | $82,763 |
| Dec 21, 2010 | Expired or cancelled cancelled Jan 2026 | 762 Fulton St | replace existing building furnaces with newer, smaller and more efficient furnaces. the project's purpose is an energy efficent project.Details
replace existing building furnaces with newer, smaller and more efficient furnaces. the project's purpose is an energy efficent project. | $80,000 | |
| Mar 25, 2009 | Completed final sign-off Nov 2009 | 762 Fulton St | Dreier Fire Protection | relocate 8 sprinkler heads on 1st & 3rd floors.Details
relocate 8 sprinkler heads on 1st & 3rd floors. | $5,000 |
| Jul 22, 2008 | Completed final sign-off Dec 2009 | 762 Fulton St | ground floor, 2nd & 3rd floor - barrier removal project under cb 1134b.2, exception 2j. upgrade toilets on g/f, 2nd fl & 3rd fl, upgrade accessible parking, upgrade lobby lighting & ratip, upgrade some finishes.Details
ground floor, 2nd & 3rd floor - barrier removal project under cb 1134b.2, exception 2j. upgrade toilets on g/f, 2nd fl & 3rd fl, upgrade accessible parking, upgrade lobby lighting & ratip, upgrade some finishes. | $650,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cosco Fire Protection Inc. (2), Acco Engineered Systems Inc. Dba Acco En, Ccsf-Dept. Public Works, Dreier Fire Protection, Martin Sign Co Inc., Torres Construction Corp., Value Fire Protection Inc
- Architects
- Vito Vanoni (3), Marilyn Thompson, Paulett Taggart
- Engineers
- Elizabeth Allen, Jeffrey Blaevoet, Xuong Quach
- Authorized agent-otherss
- Ron Baxter
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.