Block 3596, lot 078
262 Lexington St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,262 sq ft
- Lot
- 1,999 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 262 Lexington St | Blue Bend Construction Inc | revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair.Details
revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair. | |
| Oct 10, 2025 | In progress issued Oct 2025 | 262 Lexington St | Blue Bend Construction Inc | revision to pa # 2020-0611-8457. structural revision new foundation inside (e) perimeter since (e) is shared with adjacent. provide excavation sequence & shoring to accommodate foundation installationDetails
revision to pa # 2020-0611-8457. structural revision new foundation inside (e) perimeter since (e) is shared with adjacent. provide excavation sequence & shoring to accommodate foundation installation | $5,000 |
| Mar 12, 2025 | In progress issued Jun 2025 | 262 Lexington St | Blue Bend Construction Inc | alter-site 202006118457 (admininstrative permit) to conform to dbi reqs that (e) 2-unit building to retain r-3 occupancy after the addition of an adu. no change to the design or any other issued site permit documenation other than proposed buiding occupancy and unit count informaton on sheet a.Details
alter-site 202006118457 (admininstrative permit) to conform to dbi reqs that (e) 2-unit building to retain r-3 occupancy after the addition of an adu. no change to the design or any other issued site permit documenation other than proposed buiding occupancy and unit count informaton on sheet a. | |
| Jul 10, 2024 | Completed final sign-off Jan 2025 | 264 Lexington St | Rescue Roofing Co | re-roofing.Details
re-roofing. | $11,800 |
| Jun 11, 2020 | In progress issued Dec 2023 | 262 Lexington St | Blue Bend Construction Inc | add a garage @ existing 1st fl, new deck @ 2nd+3rd fl with rated property line wall. replace existing rear yard stair.existing foundations to be replaced & floor lowered as required. this work is an addition to a separate permit appplication for adding an adu. permit application #202006118457(adu)Details
add a garage @ existing 1st fl, new deck @ 2nd+3rd fl with rated property line wall. replace existing rear yard stair.existing foundations to be replaced & floor lowered as required. this work is an addition to a separate permit appplication for adding an adu. permit application #202006118457(adu) | $75,000 |
| Jun 11, 2020 | In progress issued Dec 2023 | 262 Lexington St | Blue Bend Construction Inc | add adu within the existing 1st fl as per gov. code sect. 65852.2. the unit will containg living- dining, kitchen, bath and bedroom.additional 1st floor area to be storage space.new adu to be sprinkled as per 2016 nfpa 13 include adjacent egress path. v. huang reviewed site p/a, dmj 02/07/2024;Details
add adu within the existing 1st fl as per gov. code sect. 65852.2. the unit will containg living- dining, kitchen, bath and bedroom.additional 1st floor area to be storage space.new adu to be sprinkled as per 2016 nfpa 13 include adjacent egress path. v. huang reviewed site p/a, dmj 02/07/2024; | $75,000 |
| Oct 8, 2015 | Never finaled issued Oct 2015, no final | 262 Lexington St | street space permit - renewal of permit # 201508245058)Details
street space permit - renewal of permit # 201508245058) | ||
| Aug 24, 2015 | Completed final sign-off Nov 2015 | 262 Lexington St | Zerk Construction | upper unit (#262)-demo chase in kitchen, run new gas line, new elect circuits, new venting hood. lower unit (#264)-demo chase in kitchen & all cabinets, new gas line, new elect circuits, new vent hood, new cabinets, shearwal @ back,new back door, move laundry to hall closet,patch & paint @ both unitDetails
upper unit (#262)-demo chase in kitchen, run new gas line, new elect circuits, new venting hood. lower unit (#264)-demo chase in kitchen & all cabinets, new gas line, new elect circuits, new vent hood, new cabinets, shearwal @ back,new back door, move laundry to hall closet,patch & paint @ both unit | $26,500 |
| Feb 5, 2013 | Never finaled issued Feb 2013, no final | 262 Lexington St | reroofingDetails
reroofing | $6,200 | |
| Nov 21, 2012 | Never finaled issued Nov 2012, no final | 264 Lexington St | Schmitt Heating Co Inc | install new residential 13 seer gas/electric roof unit on roof with new r-6 flexible ductwork to attic.Details
install new residential 13 seer gas/electric roof unit on roof with new r-6 flexible ductwork to attic. | $9,975 |
| Apr 9, 2007 | Never finaled issued Apr 2007, no final | 262 Lexington St | sidewalk repairDetails
sidewalk repair | ||
| Jun 16, 2006 | Never finaled issued Jun 2006, no final | 264 Lexington St | street spaceDetails
street space | ||
| Jun 20, 2005 | Completed final sign-off Oct 2005 | 264 Lexington St | demo existing stair, build new stair and landing in rear yard per planDetails
demo existing stair, build new stair and landing in rear yard per plan | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blue Bend Construction Inc (5), Rescue Roofing Co, Schmitt Heating Co Inc, Zerk Construction
- Architects
- Mark Topetcher (4)
- Engineers
- Chen Jefferson Jie, Kevin O'connor Kevin O'connor Inc, Nathan Williams
- Authorized agent-otherss
- Diana Nguyen, Mark Topetcher
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.