Happy Bay Construction Inc.
- Based in
- Oakland
- On San Francisco permits
- Oct 2023 to Sep 2026
- Last 24 months
- 15 permits filed
27 permits since 2000: 24 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 251 28th Av | 2nd flr bathroom remodel like for like, this is a seperate bathroom from permit 202607295740. replace toilet, replace sink, update plumbing and electrical as needed.Details
2nd flr bathroom remodel like for like, this is a seperate bathroom from permit 202607295740. replace toilet, replace sink, update plumbing and electrical as needed. | $20,000 |
| Aug 5, 2026 | Completed final sign-off Aug 2026 | 173 Cerritos Av | install new washer and dryer in the garageDetails
install new washer and dryer in the garage | $5,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 251 28th Av | 2/f: conversion of (e) full bath on 2nd floor to new full bath and new laundry closet. no exterior work. no structural work.Details
2/f: conversion of (e) full bath on 2nd floor to new full bath and new laundry closet. no exterior work. no structural work. | $45,000 |
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 2637 24th St | unit #4: hallway bathroom remodel like for like, - tub to tub - no changes.Details
unit #4: hallway bathroom remodel like for like, - tub to tub - no changes. | $20,000 |
| Jun 9, 2026 | Completed final sign-off Jul 2026 | 30 Clarendon Av | bathroom remodel with tub to shower conversion. new toilet, new vanity, new plumbing and electrical.Details
bathroom remodel with tub to shower conversion. new toilet, new vanity, new plumbing and electrical. | $15,000 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 1546 Dolores St | bathroom remodel like for likeDetails
bathroom remodel like for like | $15,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 539 14th Av | replace 1 window in bathroom. like for like. new will be double glazed energy efficient vinyl (not facing street). run new 240 v line from panel to kitchen & replace gas range with an induction range. replace shower valve & tub surround (existing tub remains).Details
replace 1 window in bathroom. like for like. new will be double glazed energy efficient vinyl (not facing street). run new 240 v line from panel to kitchen & replace gas range with an induction range. replace shower valve & tub surround (existing tub remains). | $10,000 |
| Dec 16, 2025 | Completed final sign-off Apr 2026 | 1435 40th Av | kitchen remodel, like for like, rewire whole house and replace all outlets and switches.Details
kitchen remodel, like for like, rewire whole house and replace all outlets and switches. | $30,000 |
| Jun 20, 2025 | Completed final sign-off Jun 2026 | 80 Santa Rita Av | revision to pa# 2025-0522-7071, to revove a load bearing wall.Details
revision to pa# 2025-0522-7071, to revove a load bearing wall. | |
| May 27, 2025 | Completed final sign-off Dec 2025 | 2122 34th Av | remove decorative balcony and shutters at front facade. replace garage door in (e) opening. replace front door in (e) opening. replace living room windows in existing openingsDetails
remove decorative balcony and shutters at front facade. replace garage door in (e) opening. replace front door in (e) opening. replace living room windows in existing openings | $35,000 |
| May 22, 2025 | Completed final sign-off Jun 2026 | 80 Santa Rita Av | hallway bathroom 56 sqft. master bathroom 45 sqft, kitchen remodel like for like, no walls or layout changes. rewire of entir house. subpanel upgrade to 125 amps (kitchen sqft 198). one shower pan-master bathroom.Details
hallway bathroom 56 sqft. master bathroom 45 sqft, kitchen remodel like for like, no walls or layout changes. rewire of entir house. subpanel upgrade to 125 amps (kitchen sqft 198). one shower pan-master bathroom. | $50,000 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 3367 Market St | changing 7 windows like for like - retrofit. (windows not located in the front)Details
changing 7 windows like for like - retrofit. (windows not located in the front) | $15,000 |
| Jan 30, 2025 | In progress filed Jan 2025, not yet issued | 644 Laguna St | new 244 sqft addition to (e) level 1 balcony. new deck space not to have any cover, open w/ no roof. new deck to have stairs into the backyard space as shown on the proposed fire plan. remove 1 window at the kitchen. addition of a new sliding door to rear (e) leading to new deckDetails
new 244 sqft addition to (e) level 1 balcony. new deck space not to have any cover, open w/ no roof. new deck to have stairs into the backyard space as shown on the proposed fire plan. remove 1 window at the kitchen. addition of a new sliding door to rear (e) leading to new deck | $50,000 |
| Dec 4, 2024 | Completed final sign-off Jul 2025 | 1347 Hayes St | revision to pa #2024082191769 adding 2nd bathroom remodel like for like, no walls or layout changes. replace showerpan.Details
revision to pa #2024082191769 adding 2nd bathroom remodel like for like, no walls or layout changes. replace showerpan. | $20,000 |
| Oct 23, 2024 | Completed final sign-off Dec 2024 | 137 Jules Av | replace siding in kind only on the front of the house 350 sqft. all wood on top of trianglw, same width and style as original siding. no framing changes.Details
replace siding in kind only on the front of the house 350 sqft. all wood on top of trianglw, same width and style as original siding. no framing changes. | $8,000 |
| Sep 16, 2024 | Completed final sign-off Dec 2024 | 1025 De Haro St | 1 hallway bathroom remodel like for like. no walls or layout changes.Details
1 hallway bathroom remodel like for like. no walls or layout changes. | $20,000 |
| Aug 21, 2024 | Completed final sign-off Jul 2025 | 1347 Hayes St | complete 1 kitchen remodel and 1 bathroom remodel like for like, no wall or layout changes, tub to tub.Details
complete 1 kitchen remodel and 1 bathroom remodel like for like, no wall or layout changes, tub to tub. | $50,000 |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 5143 Diamond Heights Bl | hallway bathroom remodel. like for like, tub to walk in shower.Details
hallway bathroom remodel. like for like, tub to walk in shower. | $5,000 |
| May 15, 2024 | Completed final sign-off Sep 2024 | 5155 Diamond Heights Bl | 2 complete bathrooms remodels like for like and one powder room remodel like for like , no walls or layout changes.Details
2 complete bathrooms remodels like for like and one powder room remodel like for like , no walls or layout changes. | $40,000 |
| Apr 17, 2024 | Completed final sign-off Jul 2025 | 644 Laguna Honda Bl | revision to 202401043423, partial lower ceiling framing plan, partial lower footing planDetails
revision to 202401043423, partial lower ceiling framing plan, partial lower footing plan | $30,000 |
| Mar 14, 2024 | Completed final sign-off Sep 2024 | 5155 Diamond Heights Bl | to comply with nov# 202419230. load bearing wall removed @ staircase per bldg pa# 202310128496.Details
to comply with nov# 202419230. load bearing wall removed @ staircase per bldg pa# 202310128496. | $20,000 |
| Jan 22, 2024 | Completed final sign-off Aug 2024 | 1637 Chestnut St | remove walls in windows, new 17 sq ft addition. new water closet w/ skylight, new bathroom, electrical, cabinets, and fixtures. lightwell infill.Details
remove walls in windows, new 17 sq ft addition. new water closet w/ skylight, new bathroom, electrical, cabinets, and fixtures. lightwell infill. | $45,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 104 Eagle St | remove and replace inkind entire front of the house (stucco and siding).Details
remove and replace inkind entire front of the house (stucco and siding). | $10,000 |
| Jan 4, 2024 | Completed final sign-off Jul 2025 | 644 Laguna Honda Bl | complete 1 kitchen remodel including wall removal and creating an open concept 150 sq ft. remove one window at the kitchen.Details
complete 1 kitchen remodel including wall removal and creating an open concept 150 sq ft. remove one window at the kitchen. | $30,000 |
| Nov 20, 2023 | Completed final sign-off Jul 2024 | 60 Belgrave Av | one complete bathroom remoel like for like, no wall or layout change tub to showerDetails
one complete bathroom remoel like for like, no wall or layout change tub to shower | $20,000 |
| Oct 12, 2023 | Completed final sign-off Sep 2024 | 5155 Diamond Heights Bl | interior - railing replacement to code.Details
interior - railing replacement to code. | $5,000 |
| Oct 10, 2023 | Completed final sign-off Dec 2023 | 5155 Diamond Heights Bl | kitchen remodel floor only: relocate sink & gas range, update from old to new fixtures, appliances, countertop, backsplash, cabinetsDetails
kitchen remodel floor only: relocate sink & gas range, update from old to new fixtures, appliances, countertop, backsplash, cabinets | $25,000 |