Ryan Knock
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Knock Arch & Design
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Oct 2026
307 permits since 2000 (architect on 292 permits, designer on 7 permits, authorized agent-others on 5 permits, engineer on 5 permits): 158 completed, 64 in progress, 35 never finaled, 50 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 307.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174Details
exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174 | $8,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 655 Noe St | front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths.Details
front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths. | $500,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 655 Noe St | rear building: full remodel - new siding, windows, doors, roofing, skylight. remodel and reconfigure interior including kitchen, bathroom, living space, bedroom. lower floor for increased ceiling height.Details
rear building: full remodel - new siding, windows, doors, roofing, skylight. remodel and reconfigure interior including kitchen, bathroom, living space, bedroom. lower floor for increased ceiling height. | $25,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 845 Vermont St | revision to pa# 2022-0308-9445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind).Details
revision to pa# 2022-0308-9445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind). | $15,000 | |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 360 Day St | exterior renovations: new skylights, windows, siding, not in-kind or (e) opening. new vertical and horizontal addition of 1785sf. new adu and interior rmeodel under seperate permit.Details
exterior renovations: new skylights, windows, siding, not in-kind or (e) opening. new vertical and horizontal addition of 1785sf. new adu and interior rmeodel under seperate permit. | $650,000 | |
| Sep 8, 2026 | In progress issued Sep 2026 | 1066 Filbert St | revision to pa 202511149623 propose 7'6 height of mech room and hallway stepped down to 8'-8" living space. reconfigure front matslab. update/extend capped uphill west retaining wall. replace downhill east foundation due to brickDetails
revision to pa 202511149623 propose 7'6 height of mech room and hallway stepped down to 8'-8" living space. reconfigure front matslab. update/extend capped uphill west retaining wall. replace downhill east foundation due to brick | ||
| Aug 28, 2026 | In progress issued Aug 2026 | 1066 Filbert St | revision to pa 202511149623 revise roof deck extend deck to west and next to adjacent lightwellDetails
revision to pa 202511149623 revise roof deck extend deck to west and next to adjacent lightwell | ||
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 142 Arguello Bl | exterior work only: remove previous extensions into rear yard. create new rear yard facing sliders on 1/f. infill portions of side facing lightwells on 1/f & basement, each no more than 1 story above grade. new accessory entrance. new hatch to unoccupied roof/condensers. no work visible from public.Details
exterior work only: remove previous extensions into rear yard. create new rear yard facing sliders on 1/f. infill portions of side facing lightwells on 1/f & basement, each no more than 1 story above grade. new accessory entrance. new hatch to unoccupied roof/condensers. no work visible from public. | $65,000 | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 142 Arguello Bl | interior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance.Details
interior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance. | $415,000 | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 845 Vermont St | Pristine Builders Group | revision to pa# 202203089445. remove fire escape both units. comply w/ (e) access requirment found in eg-03. infill below overhang @ facade. create (n) sliding glass door & french balcony. layout change to primary closet/bath kids bedroom & bath, & (n) built-ins @ entry.Details
revision to pa# 202203089445. remove fire escape both units. comply w/ (e) access requirment found in eg-03. infill below overhang @ facade. create (n) sliding glass door & french balcony. layout change to primary closet/bath kids bedroom & bath, & (n) built-ins @ entry. | |
| Aug 6, 2026 | In progress issued Sep 2026 | 4068 Cesar Chavez St | Distinctive Designs Californias Remodeli | revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof.Details
revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof. | |
| Jul 6, 2026 | In progress issued Jul 2026 | 474 Valley St | Zm Builders Inc | revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281Details
revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281 | $2,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 363 Texas St | new state adu: provide new studio adu with one bathroom, ktichen, living area on (e) 2/f. ext'r work / expansion and interior work to (e) units under sep permit.Details
new state adu: provide new studio adu with one bathroom, ktichen, living area on (e) 2/f. ext'r work / expansion and interior work to (e) units under sep permit. | $250,000 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 360 Day St | interior remodel: reconfigure all spaces including kitchen, bathroom, new connecting stairs to levels above and below. adu & exterior work under separate permits.Details
interior remodel: reconfigure all spaces including kitchen, bathroom, new connecting stairs to levels above and below. adu & exterior work under separate permits. | $850,000 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 360 Day St | new local studio adu on g/f. 1430sf with newkitchen, full bathroom, laundry, office, storage.Details
new local studio adu on g/f. 1430sf with newkitchen, full bathroom, laundry, office, storage. | $450,000 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 363 Texas St | new verticle and horizontal expansion. new siding & windows. new roof deck. adu and interior work to (e) units under sepaate permit.Details
new verticle and horizontal expansion. new siding & windows. new roof deck. adu and interior work to (e) units under sepaate permit. | $750,000 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 363 Texas St | new interior rmeodel to both units. full remodel, relocated kitchens, bathrooms, unit entries and access. adu and ext'r work under sep permit.Details
new interior rmeodel to both units. full remodel, relocated kitchens, bathrooms, unit entries and access. adu and ext'r work under sep permit. | $825,000 | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 624 Parnassus Av | create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2Details
create new adu within existing legal habitable space on existing first floor of existing single family home. adu per state program 207.2 | $58,000 | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 224 29th St | Yefa Construction Inc | rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls.Details
rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls. | |
| May 12, 2026 | In progress issued Sep 2026 | 427 Precita Av | Cbs Construction Inc. | Details
| $105,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 2219 Steiner St | Bernal Hill Builders Inc | revision to pa 202501158337 change layout on 3rd floor and 2nd floor - change to bathroom and kitchen areasDetails
revision to pa 202501158337 change layout on 3rd floor and 2nd floor - change to bathroom and kitchen areas | |
| Apr 6, 2026 | In progress filed Apr 2026, not yet issued | 748 San Bruno Av | demolish 2-story, type 5b, single family residential building.Details
demolish 2-story, type 5b, single family residential building. | $5,000 | |
| Apr 6, 2026 | In progress filed Apr 2026, not yet issued | 748 San Bruno Av | erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.Details
erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423. | $1,500,000 | |
| Apr 1, 2026 | Completed final sign-off Apr 2026 | 1827 33rd Av | Bc United Construction Inc | revision 202409090311. change stair configuration of rear stair to grade. remove fire rated windows at dining, change skylight configure at roof above 2nd floor. change rear facing railing material, siding material.Details
revision 202409090311. change stair configuration of rear stair to grade. remove fire rated windows at dining, change skylight configure at roof above 2nd floor. change rear facing railing material, siding material. | |
| Mar 26, 2026 | In progress issued Apr 2026 | 45 Glenbrook Av | Gama Construction Inc | ref bpa: 2025.1210.1445 (sharing plans) - exterior work only. replace windows and doors (not in kind) modify railings. to reduce planning fees.Details
ref bpa: 2025.1210.1445 (sharing plans) - exterior work only. replace windows and doors (not in kind) modify railings. to reduce planning fees. | $30,000 |
| Mar 19, 2026 | Completed final sign-off Apr 2026 | 1747 Chestnut St | remove rear stairsDetails
remove rear stairs | $500 | |
| Mar 17, 2026 | In progress issued Mar 2026 | 1642 Church St | Yefa Construction Inc | revise 2026-0113-3732 to reconfigure doors on ground floor to provide access to open space in common area at rear yard as requested by dcp. visible from street.Details
revise 2026-0113-3732 to reconfigure doors on ground floor to provide access to open space in common area at rear yard as requested by dcp. visible from street. | $1,200 |
| Feb 13, 2026 | In progress issued Sep 2026 | 766 Hayes St | 1/f:new bedrms and living spaces. 766: new bedroom space accessible from west facing light crt with new wetbar,full bath. 768: new living space,wet bard, bedroom space,(n) 1-1/2 bath and new internal stairs. new common hall,storage,mech spaces. 2/f: renovate (e) space,(n) stair connection to lwr fl.Details
1/f:new bedrms and living spaces. 766: new bedroom space accessible from west facing light crt with new wetbar,full bath. 768: new living space,wet bard, bedroom space,(n) 1-1/2 bath and new internal stairs. new common hall,storage,mech spaces. 2/f: renovate (e) space,(n) stair connection to lwr fl. | $120,000 | |
| Feb 11, 2026 | In progress issued Apr 2026 | 4068 Cesar Chavez St | Christopher Gate Construction Inc | remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof.Details
remodel (e) single family home. rear expansion to 3rd floor. create new roof deck and hatch to roof. | $120,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 208 Valley St | Yefa Construction Inc | remove landing access existing stair. stair removed under seperate permit. infill door at kitchen not visible from street.Details
remove landing access existing stair. stair removed under seperate permit. infill door at kitchen not visible from street. | $8,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 1642 Church St | Yefa Construction Inc | remove existing rear yard facing access stair. provide new guards at rear facing doors.Details
remove existing rear yard facing access stair. provide new guards at rear facing doors. | $18,000 |
| Dec 10, 2025 | In progress issued Jan 2026 | 427 Precita Av | Cbs Construction Inc. | exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house.Details
exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house. | $435,000 |
| Dec 10, 2025 | In progress issued Apr 2026 | 45 Glenbrook Av | Gama Construction Inc | 1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338.Details
1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338. | $250,000 |
| Dec 4, 2025 | Completed final sign-off Sep 2026 | 2555 Green St | Doran Construction & Design | create new 1/2 bath at existing storage room at landing between first and 2nd floor. 2nd floor: remove wardrobe at bedroom #3. remove closets bedroom #2. add built in cabinets and wetbar at bedroom #2. replace interior doors in kind at 2nd floor. no exterior work, no structural work.Details
create new 1/2 bath at existing storage room at landing between first and 2nd floor. 2nd floor: remove wardrobe at bedroom #3. remove closets bedroom #2. add built in cabinets and wetbar at bedroom #2. replace interior doors in kind at 2nd floor. no exterior work, no structural work. | $53,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 59 Cumberland St | remove existing access stair @ rear yardDetails
remove existing access stair @ rear yard | $1,500 | |
| Dec 1, 2025 | In progress issued Aug 2026 | 1066 Filbert St | rev to bpa 201904016779 to add state adu unit 1066a and remodel units 1066,1068,1070 as follows: relocate and update gathroomsand kitchens.improve common areas including new garbage area, utility and meter upgrades gas,electrical,upgrade entrance to lower two units1066-1066a to code.infill existingDetails
rev to bpa 201904016779 to add state adu unit 1066a and remodel units 1066,1068,1070 as follows: relocate and update gathroomsand kitchens.improve common areas including new garbage area, utility and meter upgrades gas,electrical,upgrade entrance to lower two units1066-1066a to code.infill existing | $70,000 | |
| Nov 7, 2025 | In progress issued Nov 2025 | 2219 Steiner St | Bernal Hill Builders Inc | revision to pa 202501158337 change siding material to stucco @ facade and rear elevations. remove windows @ south side bay windows; replace (e) garage door in-kind. work will not encroach in public right of wayDetails
revision to pa 202501158337 change siding material to stucco @ facade and rear elevations. remove windows @ south side bay windows; replace (e) garage door in-kind. work will not encroach in public right of way | $22,500 |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 6 Skyview Wy | Yefa Construction Inc | revision to bpa#202405172376. revision to space conditioning system: heating to be hydronic first floor off (e) water heater. heating & cooling to be ductless mini splits 2nd floor(ceiling casettes 4 zones), no exterior work.Details
revision to bpa#202405172376. revision to space conditioning system: heating to be hydronic first floor off (e) water heater. heating & cooling to be ductless mini splits 2nd floor(ceiling casettes 4 zones), no exterior work. | |
| Sep 5, 2025 | In progress issued Dec 2025 | 2765 Vallejo St | Ggd Inc. | construction of 1 detached adu: 2 story type v-b ~1000sf.Details
construction of 1 detached adu: 2 story type v-b ~1000sf. | $308,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 46 Homestead St | Pio Mcgarr Inc | revision to permit 201710171386. change layout including stairs and retaining walls and guards at rear yard, adjacent to rear of proposed addition.Details
revision to permit 201710171386. change layout including stairs and retaining walls and guards at rear yard, adjacent to rear of proposed addition. | $9,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 2368 Vallejo St | Essa's Remodeling | split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior workDetails
split e) one bathroom to 2 bathrooms @ 2nd fl. existing: 1 jacuzzi, shower, 1 toilet, 1 bidet, 2 sinks. proposed: 2 showers, 2 toilet, no bidet, no jacuzzi. no exterior work | $17,000 |
| Aug 5, 2025 | In progress issued Oct 2025 | 2765 Vallejo St | Ggd Inc. | construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352Details
construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352 | $32,525 |
| Aug 1, 2025 | Expired or cancelled cancelled Aug 2025 | 2765 Vallejo St | construction of a detached adu: type-va, 2 story building - 1000sfDetails
construction of a detached adu: type-va, 2 story building - 1000sf | $308,000 | |
| Jun 24, 2025 | In progress issued Sep 2025 | 2765 Vallejo St | Ggd Inc. | interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace.Details
interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace. | $68,550 |
| Jun 6, 2025 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | admin permit to revisie 202301200449- per fieldinspector request remove furnace shown in garage to match t-24 report. remove water heater and electric panel installed in mech area/crawl space from garageDetails
admin permit to revisie 202301200449- per fieldinspector request remove furnace shown in garage to match t-24 report. remove water heater and electric panel installed in mech area/crawl space from garage | $2,500 |
| May 15, 2025 | In progress filed May 2025, not yet issued | 4000 21st St | create new exterior fire wall at existing residence. new fences 10' above existing grade at rear yard. new access and maintenance walkway at rear yard. this is a seperate permit from pa #202406053765 and pa #202202192659Details
create new exterior fire wall at existing residence. new fences 10' above existing grade at rear yard. new access and maintenance walkway at rear yard. this is a seperate permit from pa #202406053765 and pa #202202192659 | $5,000 | |
| May 1, 2025 | In progress issued May 2026 | 1057 Pacific Av | O Donoghue Construction Inc. | vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit.Details
vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit. | $915,000 |
| Apr 24, 2025 | In progress issued Apr 2025 | 666 03rd Av | Bc United Construction Inc | revision 202501299330. replace (e) windows at front facade in kind double hung wood. install insulation in all walls and ceilings install gypboard and paint. at front facade and along 2nd floor north proerpty line wallDetails
revision 202501299330. replace (e) windows at front facade in kind double hung wood. install insulation in all walls and ceilings install gypboard and paint. at front facade and along 2nd floor north proerpty line wall | $9,500 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 2821 Franklin St | Vega Construction Company | revision to 201909303123 glass guard 2nd fl rear balcony frameless glass.Details
revision to 201909303123 glass guard 2nd fl rear balcony frameless glass. | $11,000 |
| Apr 2, 2025 | Completed final sign-off Feb 2026 | 660 Carolina St | Yefa Construction Inc | exterior work only create (n) walkway at rear 36 in max above (e) grade to connect 3rd floor bedroom to rear deck previously approved under 202102043970. no work visible from street or in public right wayDetails
exterior work only create (n) walkway at rear 36 in max above (e) grade to connect 3rd floor bedroom to rear deck previously approved under 202102043970. no work visible from street or in public right way | $10,000 |
| Mar 19, 2025 | In progress issued Jul 2025 | 224 29th St | Yefa Construction Inc | renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking.Details
renovation/expansion & dwelling unit addition to (e) single family. create 3-story residence via horizontal & vertical addition for 2 apartments & attached garage for 2 car parking. | $1,425,000 |
| Mar 10, 2025 | In progress issued Oct 2025 | 2219 Steiner St | Bernal Hill Builders Inc | proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor.Details
proposed horizontal and vertical additional to (e) 2-unit building. reconfigure units layouts, new facade new exterior materials, windows and doors. expand (e) roof deck, add 4th floor. | $430,000 |
| Jan 29, 2025 | In progress issued Apr 2025 | 666 03rd Av | Bc United Construction Inc | voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level.Details
voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level. | $172,000 |
| Jan 8, 2025 | In progress issued Apr 2025 | 474 Valley St | Spectrums General Engineering, Zm Builders Inc | revision to pa# 202001313281, reconfigure both units. add horizontal extension to previously approved footprint. excavate less than 50 cu yard on 1st flr. revise story count. fire protection under separate permit.Details
revision to pa# 202001313281, reconfigure both units. add horizontal extension to previously approved footprint. excavate less than 50 cu yard on 1st flr. revise story count. fire protection under separate permit. | |
| Dec 31, 2024 | In progress issued Jun 2026 | 242 Liberty St | altered site permit: to pa # 202008252579: reduce excavation amount, extend horizontal addition to 30% rear yard line.Details
altered site permit: to pa # 202008252579: reduce excavation amount, extend horizontal addition to 30% rear yard line. | ||
| Oct 31, 2024 | Completed final sign-off Apr 2026 | 1827 33rd Av | Bc United Construction Inc | renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to groundDetails
renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to ground | $730,000 |
| Sep 27, 2024 | Completed final sign-off Sep 2025 | 71 Bradford St | Doran Construction & Design | modify roof framing to create 2 new dormers (no higher than (e) roof ridge and no greater than 20% roof area) within unconditioned attic above new storage area, strengthen existing ceiling framing and related supporting elements in orde to support new storage loads.Details
modify roof framing to create 2 new dormers (no higher than (e) roof ridge and no greater than 20% roof area) within unconditioned attic above new storage area, strengthen existing ceiling framing and related supporting elements in orde to support new storage loads. | $18,750 |
| Sep 20, 2024 | Completed final sign-off Nov 2024 | 745 10th Av | revision to pa# 202312212941, new location of space conditioning system to be heat pump zone hydronic system.Details
revision to pa# 202312212941, new location of space conditioning system to be heat pump zone hydronic system. | ||
| Sep 14, 2024 | In progress issued Sep 2025 | 4000 21st St | 1-adu per state adu per government code section 65852.2; main residence under separate pa# 202209192659.Details
1-adu per state adu per government code section 65852.2; main residence under separate pa# 202209192659. | $102,000 | |
| Sep 9, 2024 | Expired or cancelled withdrawn Jul 2025 | 328 27th St | Force Development Company Inc | alter site to site pa# 202211287259, change sspa tier review from 2 to 1.Details
alter site to site pa# 202211287259, change sspa tier review from 2 to 1. | |
| Aug 22, 2024 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | reduce sq footage of roof deck to be 410 sq ft completed under pa 201806141935. deck material to be wood compliant with fs-01. revision to pa 202301200449 dimension of door & window at ground level of facade to comply with nov #202418140Details
reduce sq footage of roof deck to be 410 sq ft completed under pa 201806141935. deck material to be wood compliant with fs-01. revision to pa 202301200449 dimension of door & window at ground level of facade to comply with nov #202418140 | |
| Jun 27, 2024 | In progress issued Apr 2025 | 40 Encanto Av | D3 Construction | new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deckDetails
new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deck | $13,750 |
| May 1, 2024 | Completed final sign-off Sep 2025 | 71 Bradford St | Doran Construction & Design | revision to pa 202401294833. partial foundation upgrade.Details
revision to pa 202401294833. partial foundation upgrade. | $32,725 |
| Feb 28, 2024 | Expired or cancelled cancelled Aug 2024 | 2219 Steiner St | proposed horizaton & verticl addition. reconfigureunit layouts, new facade, exterior materials, windows and doors. expand (e) roof deck.Details
proposed horizaton & verticl addition. reconfigureunit layouts, new facade, exterior materials, windows and doors. expand (e) roof deck. | $310,000 | |
| Dec 21, 2023 | Completed final sign-off Nov 2024 | 745 10th Av | Jdesignbuild | revision to pa 201209212895 (n) heat pump system; (n) exterior condensors in rear yard; add (n) skylights and (n) parapets; adjust rear and side facing windows & doors; adjust layout @ kitchen, dining and bedroom on top floorDetails
revision to pa 201209212895 (n) heat pump system; (n) exterior condensors in rear yard; add (n) skylights and (n) parapets; adjust rear and side facing windows & doors; adjust layout @ kitchen, dining and bedroom on top floor | $8,500 |
| Dec 13, 2023 | In progress filed Dec 2023, not yet issued | 51 Wool St | Bernal Hill Builders Inc | horizontal and vertical addition to existing single family residence.Details
horizontal and vertical addition to existing single family residence. | $275,000 |
| Oct 25, 2023 | In progress issued Mar 2024 | 326 27th St | Force Development Company Inc | renovation to (e) single family home. new windows, siding, roof, interior remodel, remodel kitchen, bath. living room, bedroom. replace foundation.Details
renovation to (e) single family home. new windows, siding, roof, interior remodel, remodel kitchen, bath. living room, bedroom. replace foundation. | $130,000 |
| Oct 25, 2023 | Completed final sign-off Jan 2025 | 564 29th Av | Doran Construction & Design | revision to bpa#201907115588, shift bathroom location g/f, create (n) attic access, (n) windows/skylights/rooftop dormers, replace entry stair, widen garage door, remove/replace site/landscaping walls @ front yard.Details
revision to bpa#201907115588, shift bathroom location g/f, create (n) attic access, (n) windows/skylights/rooftop dormers, replace entry stair, widen garage door, remove/replace site/landscaping walls @ front yard. | $16,000 |
| Sep 22, 2023 | Expired or cancelled withdrawn Jan 2025 | 474 Arkansas St | work to 1st fl: new window openings. refinish entry steps. new entry door and siding. create new interior stair to 2nd level. reinforce/reframe (e) 2nd fl. replace (e) fencing along sidewalk, provide new sliding vehicular gate.Details
work to 1st fl: new window openings. refinish entry steps. new entry door and siding. create new interior stair to 2nd level. reinforce/reframe (e) 2nd fl. replace (e) fencing along sidewalk, provide new sliding vehicular gate. | $10,000 | |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 53 Walter St | Kilrea Construction Inc. | revision to pa# 201805229818. 1st fl only. add wetbar and half bath. no structural work.Details
revision to pa# 201805229818. 1st fl only. add wetbar and half bath. no structural work. | $12,000 |
| Aug 9, 2023 | Completed final sign-off Nov 2024 | 489 30th St | reinforce the (e)joists for that hold the (e) ceiling hvac units on the 2 bedrooms in the second flr. and minor stucco repair work with approx. 6 sf area.Details
reinforce the (e)joists for that hold the (e) ceiling hvac units on the 2 bedrooms in the second flr. and minor stucco repair work with approx. 6 sf area. | $5,000 | |
| Jul 3, 2023 | Completed final sign-off Jun 2025 | 3104 Buchanan St | Bernal Hill Builders Inc | 3104 buchanan - reconfigure (e) unit. create (n) internal stair access to (n) roof deck; (n) bay window @ 3rd fl; create (n) front & rear facades; (n) landscaping @ rear. repair or replace stucco as necessary; 3106 buchanan - replace (e) kitchenette w(n) kitchenette; replace (e) tub w(n) showerDetails
3104 buchanan - reconfigure (e) unit. create (n) internal stair access to (n) roof deck; (n) bay window @ 3rd fl; create (n) front & rear facades; (n) landscaping @ rear. repair or replace stucco as necessary; 3106 buchanan - replace (e) kitchenette w(n) kitchenette; replace (e) tub w(n) shower | $275,000 |
| Jun 26, 2023 | Never finaled issued Sep 2023, no final | 40 Encanto Av | D3 Construction | revision to pa#: 202207269320. revise interior layout. add new skylights. excavate and lower portion of ground floor less than 2ftDetails
revision to pa#: 202207269320. revise interior layout. add new skylights. excavate and lower portion of ground floor less than 2ft | $32,500 |
| May 23, 2023 | Completed final sign-off May 2023 | 25 Hidalgo Tr | revision to pa# 202010076129, change location of 1/2 bath on 1st flr. no change to plumbing fixture count, no structural work.Details
revision to pa# 202010076129, change location of 1/2 bath on 1st flr. no change to plumbing fixture count, no structural work. | $1,500 | |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 140 Taraval St | Alder Construction | rev to pa# 2022-0629-7349: add fire walls on east and west side of deckDetails
rev to pa# 2022-0629-7349: add fire walls on east and west side of deck | $2,000 |
| Mar 15, 2023 | Never finaled issued Jun 2023, no final | 40 Encanto Av | D3 Construction | remodel (e) facade. replace garage door, gate, front landscape. replace windows at top floor. create new architectural projection and balcony at front. no lightwell infill under this permitDetails
remodel (e) facade. replace garage door, gate, front landscape. replace windows at top floor. create new architectural projection and balcony at front. no lightwell infill under this permit | $35,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 2242 19th St | J C Builders | revision to bpa#202212077814, provide foundation @ (e) bedroom due to (e) site conditionsDetails
revision to bpa#202212077814, provide foundation @ (e) bedroom due to (e) site conditions | $5,000 |
| Jan 24, 2023 | Completed final sign-off Oct 2025 | 2821 Franklin St | Vega Construction Company | revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slabDetails
revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slab | $32,000 |
| Jan 20, 2023 | Completed final sign-off Jun 2025 | 1072 Filbert St | Gil Construction & Assoc Inc. | comply w/2020-003087enf: restore flat, relocate garage door, create garage space into habitable space. living room work on 2nd fl. facade onlyDetails
comply w/2020-003087enf: restore flat, relocate garage door, create garage space into habitable space. living room work on 2nd fl. facade only | $46,000 |
| Jan 17, 2023 | Completed final sign-off Oct 2024 | 421 Walnut St | revision to 201908023659: change window in main bedroom to sliding dr, remain same opening. change window in the hall to door on 2nd fl. changes request for roof maintaning.Details
revision to 201908023659: change window in main bedroom to sliding dr, remain same opening. change window in the hall to door on 2nd fl. changes request for roof maintaning. | $200 | |
| Jan 10, 2023 | Expired or cancelled withdrawn Feb 2023 | 59 Cumberland St | Deep Elm Construction Llc | revision to permit 202204111963. change replacement stair layout. replace sliding door in (e) opening at 3/f deck. create 3' deep landing at deck at grade. change window openings at interior stair. replace windows in (e) windows at 2/f den. no work visible from street or public row.Details
revision to permit 202204111963. change replacement stair layout. replace sliding door in (e) opening at 3/f deck. create 3' deep landing at deck at grade. change window openings at interior stair. replace windows in (e) windows at 2/f den. no work visible from street or public row. | $9,750 |
| Dec 23, 2022 | Expired or cancelled cancelled Jan 2026 | 2242 19th St | J C Builders | revision to approved permit #202212077814. scope of work under this permit is to relocate driveway with (n) dpw street improvement permit (seperate permit).Details
revision to approved permit #202212077814. scope of work under this permit is to relocate driveway with (n) dpw street improvement permit (seperate permit). | |
| Dec 23, 2022 | In progress issued Nov 2025 | 248 Valley St | A V Construction Services Inc | renovation & vertical & horizontal expansion to (e) single family residence. demolish 1 story detached garage at rear yard. fully sprinkler building under separate permit. excavation must not commence without a shoring permit, as earth shoring is deferred under a separate permit.Details
renovation & vertical & horizontal expansion to (e) single family residence. demolish 1 story detached garage at rear yard. fully sprinkler building under separate permit. excavation must not commence without a shoring permit, as earth shoring is deferred under a separate permit. | $660,000 |
| Dec 21, 2022 | In progress issued Feb 2024 | 45 Sharon St | new one story vertical expansion to existing residence to add (3) bedrooms.1 bathroom & rear yard facing deck.interior remodel to existing 2nd floor & 1st floors. relocate stairs to (e) deck. legalize cottage under separate permit.Details
new one story vertical expansion to existing residence to add (3) bedrooms.1 bathroom & rear yard facing deck.interior remodel to existing 2nd floor & 1st floors. relocate stairs to (e) deck. legalize cottage under separate permit. | $358,145 | |
| Dec 7, 2022 | Never finaled filed Dec 2022, never issued | 2242 19th St | J C Builders | infill existing access opening between 1st & 2nd flrs. create new access to the existing space on 1st flr vis new hallway, via existing stairs. relocate laundry. renovate bathroom. new windows and ext doors, relocate e garage door, n planters in front setback.Details
infill existing access opening between 1st & 2nd flrs. create new access to the existing space on 1st flr vis new hallway, via existing stairs. relocate laundry. renovate bathroom. new windows and ext doors, relocate e garage door, n planters in front setback. | $165,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 617 Elizabeth St | create new adu on ground floor as outlined on pa# 201911056461. adu per ordinance 95-17.Details
create new adu on ground floor as outlined on pa# 201911056461. adu per ordinance 95-17. | $77,000 | |
| Nov 28, 2022 | Expired or cancelled withdrawn Jun 2023 | 326 27th St | Force Development Company Inc | demolition of 1-story, type v-b, residential bldg.Details
demolition of 1-story, type v-b, residential bldg. | |
| Nov 28, 2022 | In progress issued May 2024 | 328 27th St | Force Development Company Inc | erect new 3-story over 1 basement, typbe v-b, residential bldg with 1 unit.Details
erect new 3-story over 1 basement, typbe v-b, residential bldg with 1 unit. | $1,116,843 |
| Nov 23, 2022 | Completed final sign-off Dec 2023 | 1035 Ashbury St | Perfect Homes Construction | revision to approved pa#: 202205023375 (n) work this permit is to clarify(e) structural conditions, revise proposed structural framing and details. revise roof deck footprint and ordinance, revise windows and door schedule. relocate furnance.Details
revision to approved pa#: 202205023375 (n) work this permit is to clarify(e) structural conditions, revise proposed structural framing and details. revise roof deck footprint and ordinance, revise windows and door schedule. relocate furnance. | |
| Nov 17, 2022 | In progress issued Mar 2024 | 4000 21st St | Mosvaler Construction Inc | rear yard: create new decks and walkways less than 3' above (e) grade, with new stair connections between (e) residence , walkways and (e) yard/grade. replacement fence and access gate from public way to yard. replacement retaining wall in rear yard. relocate door facing yard. excavat 21.1 cubic ydsDetails
rear yard: create new decks and walkways less than 3' above (e) grade, with new stair connections between (e) residence , walkways and (e) yard/grade. replacement fence and access gate from public way to yard. replacement retaining wall in rear yard. relocate door facing yard. excavat 21.1 cubic yds | $30,000 |
| Nov 15, 2022 | Completed final sign-off Aug 2023 | 140 Taraval St | Alder Construction | revision to 202206297349. work includes replacing upper retaining wall at rear, new footings and posts for approved catwalk between house and rear upper terrace, and modification to cat walk to add steps with landingDetails
revision to 202206297349. work includes replacing upper retaining wall at rear, new footings and posts for approved catwalk between house and rear upper terrace, and modification to cat walk to add steps with landing | $13,375 |
| Nov 4, 2022 | In progress issued Apr 2024 | 38 Mars St | Eastwood Development Incorporated | vertical addition. renovate facade. create (n) entry on ground floor, with (n) stair connection to all 3 levels. create 4 bedrooms, 2 bathrooms, & laundry on 2nd fl. create (n) living room, dining room, powder room & kitchen on 3rd fl. (n) decks over living spaces below. (n) terracing at rear yard.Details
vertical addition. renovate facade. create (n) entry on ground floor, with (n) stair connection to all 3 levels. create 4 bedrooms, 2 bathrooms, & laundry on 2nd fl. create (n) living room, dining room, powder room & kitchen on 3rd fl. (n) decks over living spaces below. (n) terracing at rear yard. | $620,253 |
| Oct 27, 2022 | Never finaled issued Oct 2022, no final | 1967 22nd Av | change sprinkler standard from nfpa13r to nfpa13d. ref bpa#201902132882.(nfpa 13r system & sprinkler monitoring already installed in bldg; per bldg approval of only nfpa 13d system requirement, installed system is therefore non-required/voluntary & remote monitor/supervising station is not required)Details
change sprinkler standard from nfpa13r to nfpa13d. ref bpa#201902132882.(nfpa 13r system & sprinkler monitoring already installed in bldg; per bldg approval of only nfpa 13d system requirement, installed system is therefore non-required/voluntary & remote monitor/supervising station is not required) | ||
| Oct 5, 2022 | Completed final sign-off May 2023 | 25 Hidalgo Tr | to abate planning code violation 2022-004334enf. replace facade windows. change front door slab to another aluminium slab with glazing windows. add panel to garage door. add/restore spanish rope & corbel at facade.Details
to abate planning code violation 2022-004334enf. replace facade windows. change front door slab to another aluminium slab with glazing windows. add panel to garage door. add/restore spanish rope & corbel at facade. | $15,000 | |
| Sep 29, 2022 | Completed final sign-off Nov 2023 | 631 Kansas St | Fg Force Construction Inc | revisio to 202008202200. omit roof deck, add skylights, change space conditioniong to heat pumpsDetails
revisio to 202008202200. omit roof deck, add skylights, change space conditioniong to heat pumps | |
| Sep 21, 2022 | Completed final sign-off Nov 2024 | 745 10th Av | Jdesignbuild | legalize ground floor unit, create new adu. structural work under pa# 202209212895.Details
legalize ground floor unit, create new adu. structural work under pa# 202209212895. | $195,000 |
| Sep 21, 2022 | Completed final sign-off Nov 2024 | 745 10th Av | Jdesignbuild | new horizontal addition to (e) single family home. raise lowered roof at rear extension at home. infill lightwell on top floor. renovate kitchen and baths. adu under pa# 202209212897.Details
new horizontal addition to (e) single family home. raise lowered roof at rear extension at home. infill lightwell on top floor. renovate kitchen and baths. adu under pa# 202209212897. | $145,000 |
| Sep 19, 2022 | In progress issued Aug 2025 | 4000 21st St | vertical addition to (e) single family home. convert (e) storage space at 1st fl to living space. renovate (e) street facing and rear facing facades.Details
vertical addition to (e) single family home. convert (e) storage space at 1st fl to living space. renovate (e) street facing and rear facing facades. | $495,000 | |
| Aug 1, 2022 | Completed final sign-off Jan 2023 | 125 Lundys Ln | Cma Development Inc | install new fence along north and south sides of property. fence to be 6ft above top of (e) retaining walls.Details
install new fence along north and south sides of property. fence to be 6ft above top of (e) retaining walls. | $18,000 |
| Aug 1, 2022 | Completed final sign-off Oct 2024 | 421 Walnut St | Dliu Construction | rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions.Details
rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions. | $2,800 |