David Kane
- Listed as
- engineer
- Firm
- Harrell Kane Struct Enginee
- Based in
- San Francisco
- On San Francisco permits
- Mar 2014 to Jul 2025
25 permits since 2000 (engineer on 25 permits): 12 completed, 5 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Jan 2026 | 2518 Buchanan St | K 2 Builders Inc | to comply with nov 202538518 repair in kind (e) fence @ (e) roof deck.Details
to comply with nov 202538518 repair in kind (e) fence @ (e) roof deck. | $5,000 |
| Jun 12, 2024 | In progress issued Feb 2025 | 2331 Jackson St | Rod Heisler Construction | 122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch.Details
122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch. | $415,000 |
| Oct 25, 2023 | In progress issued Mar 2024 | 326 27th St | Force Development Company Inc | renovation to (e) single family home. new windows, siding, roof, interior remodel, remodel kitchen, bath. living room, bedroom. replace foundation.Details
renovation to (e) single family home. new windows, siding, roof, interior remodel, remodel kitchen, bath. living room, bedroom. replace foundation. | $130,000 |
| Aug 17, 2023 | Expired or cancelled withdrawn Jan 2026 | 1997 14th Av | replace (e) rear deck with reduced size deck.Details
replace (e) rear deck with reduced size deck. | $19,000 | |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 993 Filbert St | Douglas Cleaveland | remodel, relocate (e) kitchen, bathroom, install closets, insulate exterior walls, ceiling & 5/8" typ x gypbd, install hydronic heating, capture portion of (e) garage level for new bedroom, new electrical/lighting. adding bedroom on 1st fl w/in (e) evelope @ garageDetails
remodel, relocate (e) kitchen, bathroom, install closets, insulate exterior walls, ceiling & 5/8" typ x gypbd, install hydronic heating, capture portion of (e) garage level for new bedroom, new electrical/lighting. adding bedroom on 1st fl w/in (e) evelope @ garage | $210,000 |
| Aug 3, 2023 | In progress issued May 2025 | 2760 Vallejo St | Clayton Timbrell & Co | site retaining walls, fences in rear yard with pool.Details
site retaining walls, fences in rear yard with pool. | $80,000 |
| Dec 30, 2022 | In progress issued Sep 2025 | 428 15th Av | Patrick J. Corkery Gen. Contr., Bianchi-Tillett Developers Inc | new detached adu 1-story, type-vb, in rear yard (originally part of pa#202204071831)Details
new detached adu 1-story, type-vb, in rear yard (originally part of pa#202204071831) | $75,000 |
| Dec 23, 2022 | Completed final sign-off Nov 2023 | 2651 Octavia St | existing 10' high fence south property line- replace rotting wood, replace with redwood planks, existing 6' high west fence- match height 10' of south fence, replace in-kind redwood planks.Details
existing 10' high fence south property line- replace rotting wood, replace with redwood planks, existing 6' high west fence- match height 10' of south fence, replace in-kind redwood planks. | $1,000 | |
| Nov 28, 2022 | In progress issued May 2024 | 328 27th St | Force Development Company Inc | erect new 3-story over 1 basement, typbe v-b, residential bldg with 1 unit.Details
erect new 3-story over 1 basement, typbe v-b, residential bldg with 1 unit. | $1,116,843 |
| Nov 23, 2022 | Completed final sign-off Jul 2023 | 4040 18th St | replace (e) brick foundations with new concrete foundationsDetails
replace (e) brick foundations with new concrete foundations | $50,000 | |
| Sep 9, 2022 | Completed final sign-off Sep 2025 | 51 Bernard St | comply w/code enforcement case#2022-005109enf.legalized rear ground fl(6ft extension)remove pre-existing rear stairs & enclose area,change in bldg materials from siding to stucco as shown proposed elevations,conversion of planter into deck on 4th floorDetails
comply w/code enforcement case#2022-005109enf.legalized rear ground fl(6ft extension)remove pre-existing rear stairs & enclose area,change in bldg materials from siding to stucco as shown proposed elevations,conversion of planter into deck on 4th floor | $10,000 | |
| Apr 15, 2022 | Never finaled issued Apr 2022, no final | 2175 Hayes St | Mc Grath Construction | excavation shoring. reference to structural addendum pa #201806283235-s1Details
excavation shoring. reference to structural addendum pa #201806283235-s1 | $75,000 |
| Mar 31, 2022 | Completed final sign-off Nov 2022 | 1624 Larkin St | Landmark Construction Inc. | structural roof strengthening.Details
structural roof strengthening. | $38,000 |
| Mar 7, 2022 | Never finaled issued Mar 2022, no final | 285 Seacliff Av | Brian Mac Namara Construction | replace in-kind all existing windows and stucco finish @ exterior wallsDetails
replace in-kind all existing windows and stucco finish @ exterior walls | $55,000 |
| Dec 6, 2021 | Never finaled issued Dec 2021, no final | 285 Seacliff Av | replace foundations and slab-on -grade in order to match floor height at north end of ground story. remove interior non structural finishes throughout house and replace in kind.Details
replace foundations and slab-on -grade in order to match floor height at north end of ground story. remove interior non structural finishes throughout house and replace in kind. | $85,000 | |
| Mar 25, 2021 | Completed final sign-off May 2026 | 141 16th Av | renovation and addition to (e) single family dwelling. rear horizontal addition. create (n) bay window on front facade. create (n) sloped roof and raise ceiling at rear of 4th floor. withdrawn -create (n) adu at ground floor (under separate permit)-withdrawnDetails
renovation and addition to (e) single family dwelling. rear horizontal addition. create (n) bay window on front facade. create (n) sloped roof and raise ceiling at rear of 4th floor. withdrawn -create (n) adu at ground floor (under separate permit)-withdrawn | $471,132 | |
| Mar 17, 2021 | Completed final sign-off Nov 2022 | 709 Lyon St | rear yard retaining wall only.Details
rear yard retaining wall only. | $7,500 | |
| Nov 12, 2020 | Completed final sign-off Feb 2023 | 318 30th Av | permeation grouting at property lines. ref pa# 201512316214 & 202007140120Details
permeation grouting at property lines. ref pa# 201512316214 & 202007140120 | $5,000 | |
| Jul 9, 2020 | Never finaled issued Apr 2022, no final | 1056 Potrero Av | Concannon Construction Inc, Seapoint Construction | alter site: revise unit count and configuration as approved under bpa # 201612165168. create 3 dwelling units and 6 adu's within previously approved building envelope. previous permit had 4 dwelling units and 1 adu. additionally reference bpa #202005047290 (ab-094 for unlimited adu)Details
alter site: revise unit count and configuration as approved under bpa # 201612165168. create 3 dwelling units and 6 adu's within previously approved building envelope. previous permit had 4 dwelling units and 1 adu. additionally reference bpa #202005047290 (ab-094 for unlimited adu) | |
| Aug 29, 2019 | Completed final sign-off Aug 2021 | 629 Bryant St | (n) windows & doors at 1st fl east exterior wall. remodel & replace doors & windows at 2nd fl south exterior wall. (n) guardrail at existing 2nd floor rear deck. maher naDetails
(n) windows & doors at 1st fl east exterior wall. remodel & replace doors & windows at 2nd fl south exterior wall. (n) guardrail at existing 2nd floor rear deck. maher na | $55,000 | |
| Aug 15, 2017 | Expired or cancelled cancelled Jun 2026 | 3230 24th St | to erect 5 stories, no basement, type va over type ia, 17 units residential over commercial building.(r-2,m,b) lot #011a & 015Details
to erect 5 stories, no basement, type va over type ia, 17 units residential over commercial building.(r-2,m,b) lot #011a & 015 | $3,000,000 | |
| Apr 19, 2017 | Completed final sign-off Sep 2020 | 668 Oak St | Buena Vista Builders Inc | erect type 5a four story four unit condo buildingDetails
erect type 5a four story four unit condo building | $1,285,000 |
| Oct 11, 2016 | Completed final sign-off Oct 2017 | 52 Zoe St | Delvin Garcia Construction | upgrade existing mezzanine, upgrade ada bathrooms, new finishes and fixtures throughout and non rated partitions. n/a ordiance #155-13Details
upgrade existing mezzanine, upgrade ada bathrooms, new finishes and fixtures throughout and non rated partitions. n/a ordiance #155-13 | $50,000 |
| Aug 4, 2015 | Completed final sign-off Jun 2019 | 752 Lake St | alteration at garage storage space to parking. add garage doors facing 9th ave. connect all 5 levels w/elevator. convert e storage space to garage/car parking. fill in light well. renovate units, open floor plan. 2/3 level. renovate elevator connection onlyDetails
alteration at garage storage space to parking. add garage doors facing 9th ave. connect all 5 levels w/elevator. convert e storage space to garage/car parking. fill in light well. renovate units, open floor plan. 2/3 level. renovate elevator connection only | $325,000 | |
| Mar 17, 2014 | Expired or cancelled withdrawn Jan 2015 | 449 14th St | change of use from assembly to group housing. install interior partitions to create 10 new bedrooms and 3 ndw bathrooms.Details
change of use from assembly to group housing. install interior partitions to create 10 new bedrooms and 3 ndw bathrooms. | $100,000 |