Buena Vista Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2022 | Completed final sign-off Feb 2024 | 361 08th St | relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof &Details
relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof & | $190,000 |
| Jul 20, 2022 | Completed final sign-off Feb 2023 | 361 08th St | structural roof strngthening & demo of interior nonstructural partitions, ref complaint bid-insp #202184064Details
structural roof strngthening & demo of interior nonstructural partitions, ref complaint bid-insp #202184064 | $17,500 |
| Sep 9, 2021 | Completed final sign-off Feb 2022 | 449 14th St | to comply with plannning ref. case no. 2018-002165enf. remove covered shower and appurtances at east sideyard. removewood picket gates at front and replace with metal fence/gates set back. 2/f: legalize reception bar and non structural, partial height partition wall. document as-built conditionsDetails
to comply with plannning ref. case no. 2018-002165enf. remove covered shower and appurtances at east sideyard. removewood picket gates at front and replace with metal fence/gates set back. 2/f: legalize reception bar and non structural, partial height partition wall. document as-built conditions | $30,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 668 Oak St | revision to 201704194329. structural as built revisions. arch revisions include level 2 1/2 bath layout change, add doors, level 4 stair entry door change, mezz bath reconfiguredDetails
revision to 201704194329. structural as built revisions. arch revisions include level 2 1/2 bath layout change, add doors, level 4 stair entry door change, mezz bath reconfigured | |
| Mar 21, 2019 | Completed final sign-off Sep 2020 | 668 Oak St | structural revision to pa #201704194329, to delete car stacker pit.Details
structural revision to pa #201704194329, to delete car stacker pit. | |
| Nov 14, 2018 | Completed final sign-off Sep 2020 | 660 Oak St | exterior walkway & stair. ref pa 201704194329. maher n/aDetails
exterior walkway & stair. ref pa 201704194329. maher n/a | $15,000 |
| Apr 19, 2017 | Completed final sign-off Sep 2020 | 668 Oak St | erect type 5a four story four unit condo buildingDetails
erect type 5a four story four unit condo building | $1,285,000 |
| Jan 13, 2016 | Completed final sign-off Apr 2016 | 449 14th St | revision to 201503029746. add light fixture and title 24Details
revision to 201503029746. add light fixture and title 24 | $500 |
| Mar 2, 2015 | Completed final sign-off Apr 2016 | 449 14th St | kitchen and bathroom remodel, demolish front entry stair and add accessible ramp in interior, add partition walls.Details
kitchen and bathroom remodel, demolish front entry stair and add accessible ramp in interior, add partition walls. | $35,000 |
| Nov 10, 2014 | Completed final sign-off Jan 2015 | 70 Gold Mine Dr | exterior detail changes to bldg elevation for restoration of historic elements removed dining construction to address planning dept complaint # 13537.Details
exterior detail changes to bldg elevation for restoration of historic elements removed dining construction to address planning dept complaint # 13537. | $15,000 |
| Jun 4, 2014 | Never finaled issued Jun 2014, no final | 735 Fell St | rev. to pa#201308164574 remove "elevator back up generator". n/a ordinance #155-13. this was a requirement on permit #201308164574Details
rev. to pa#201308164574 remove "elevator back up generator". n/a ordinance #155-13. this was a requirement on permit #201308164574 | |
| Apr 25, 2014 | Never finaled issued May 2014, no final | 735 Fell St | t.i. relocate 2 bathrooms to 1 handicap bath plus one toilet room. remodel 1st floor bath and add one ada bathroom. toilet/sink only. relocate equipment closet per 201308164574 and install fist landing in lieu of door actuator per app#201308164574. install ducting for future grease work.; complianceDetails
t.i. relocate 2 bathrooms to 1 handicap bath plus one toilet room. remodel 1st floor bath and add one ada bathroom. toilet/sink only. relocate equipment closet per 201308164574 and install fist landing in lieu of door actuator per app#201308164574. install ducting for future grease work.; compliance | $35,000 |
| Sep 26, 2013 | Completed final sign-off Jan 2015 | 74 Gold Mine Dr | this permit is to make minor alteration to previouis approved p/a#201107261097. that is current under construction. move stair to roof deck, relocate new roof deck. horizontal extension of 3rd flr, dinning room w/(e) lower floor. alteration of windows by staircase.addition of wetbar.Details
this permit is to make minor alteration to previouis approved p/a#201107261097. that is current under construction. move stair to roof deck, relocate new roof deck. horizontal extension of 3rd flr, dinning room w/(e) lower floor. alteration of windows by staircase.addition of wetbar. | |
| Jul 3, 2013 | Completed final sign-off Dec 2014 | 72 Gold Mine Dr | revision to site permit application #201107261096, scope of work includes minor exterior changes to building envelope and room layout. there is a minor increase in square footageDetails
revision to site permit application #201107261096, scope of work includes minor exterior changes to building envelope and room layout. there is a minor increase in square footage | |
| Jul 2, 2013 | Completed final sign-off Jan 2015 | 70 Gold Mine Dr | revision to site pa# 2012/04/03/7423. scope of work includes changing the roof of new addition from pitched roof to a flat roof.Details
revision to site pa# 2012/04/03/7423. scope of work includes changing the roof of new addition from pitched roof to a flat roof. | |
| Jun 24, 2013 | Completed final sign-off Jan 2015 | 70 Gold Mine Dr | revision to pa 201204037423s. addit & alter to existing basement which includes new bathrm, wine cellar, plumbing & lighting/audio, and new media rm. there will be one new window at the basement level.Details
revision to pa 201204037423s. addit & alter to existing basement which includes new bathrm, wine cellar, plumbing & lighting/audio, and new media rm. there will be one new window at the basement level. | $70,000 |
| Dec 12, 2012 | Completed final sign-off Apr 2014 | 668 Oak St | demolish 80 ft x 6 ft high side retaining wall. erect 33 ft long x 7 ft high concrete retaining wall at left side (east) property lineDetails
demolish 80 ft x 6 ft high side retaining wall. erect 33 ft long x 7 ft high concrete retaining wall at left side (east) property line | $20,000 |
| Nov 13, 2012 | Completed final sign-off Jan 2013 | 600 Chestnut St | remove and replace kitchen counters, sink, faucet and garbage disposal withh like kind, repair hardwood floor at kitchen, hall, living room, no lighting comply with co alarms requirement per cbc 2010 section 420.4Details
remove and replace kitchen counters, sink, faucet and garbage disposal withh like kind, repair hardwood floor at kitchen, hall, living room, no lighting comply with co alarms requirement per cbc 2010 section 420.4 | $15,000 |
| Jan 20, 2012 | Completed final sign-off Jul 2012 | 40 Clifford Tr | remodel 1 kitchen & 2 bathrooms in kind. new tiles, counter tops & fixtures. (lighting comply with 150 k). no structural work. bathrooms on second floor. kitchen: min 50% of kitchen lighting watts by h.e fixture . bathroom : h.e of t-24 occupancy sensor.Details
remodel 1 kitchen & 2 bathrooms in kind. new tiles, counter tops & fixtures. (lighting comply with 150 k). no structural work. bathrooms on second floor. kitchen: min 50% of kitchen lighting watts by h.e fixture . bathroom : h.e of t-24 occupancy sensor. | $40,000 |
| Mar 24, 2011 | Completed final sign-off Apr 2012 | 4201 California St | to complete work and obtain final inspection for work approved under pa#200607186923Details
to complete work and obtain final inspection for work approved under pa#200607186923 | $5,000 |
| Mar 11, 2011 | Completed final sign-off Mar 2011 | 1020 Pine St | to obtain final inspection for work approved under pa # 200707035929. all work is complete.Details
to obtain final inspection for work approved under pa # 200707035929. all work is complete. | |
| Mar 11, 2011 | Completed final sign-off Mar 2011 | 1020 Pine St | to obtain final inspection for work approved under pa # 200507127408. all work is complete.Details
to obtain final inspection for work approved under pa # 200507127408. all work is complete. | |
| Mar 11, 2011 | Completed final sign-off Mar 2011 | 1020 Pine St | 200708109494. all work is complete.Details
200708109494. all work is complete. | |
| Jul 18, 2006 | Completed final sign-off Mar 2016 | 270 Ocean Av | to erect 4 story 6 dwelling unitsDetails
to erect 4 story 6 dwelling units | $1,250,000 |