Buena Vista Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 21 days from filing to permit and 395 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2022 | Completed final sign-off Feb 2024 | 361 08th St | relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof &Details
relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof & | $190,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 668 Oak St | revision to 201704194329. structural as built revisions. arch revisions include level 2 1/2 bath layout change, add doors, level 4 stair entry door change, mezz bath reconfiguredDetails
revision to 201704194329. structural as built revisions. arch revisions include level 2 1/2 bath layout change, add doors, level 4 stair entry door change, mezz bath reconfigured | |
| Nov 14, 2018 | Completed final sign-off Sep 2020 | 660 Oak St | exterior walkway & stair. ref pa 201704194329. maher n/aDetails
exterior walkway & stair. ref pa 201704194329. maher n/a | $15,000 |
| Mar 2, 2015 | Completed final sign-off Apr 2016 | 449 14th St | kitchen and bathroom remodel, demolish front entry stair and add accessible ramp in interior, add partition walls.Details
kitchen and bathroom remodel, demolish front entry stair and add accessible ramp in interior, add partition walls. | $35,000 |
| Sep 26, 2013 | Completed final sign-off Jan 2015 | 74 Gold Mine Dr | this permit is to make minor alteration to previouis approved p/a#201107261097. that is current under construction. move stair to roof deck, relocate new roof deck. horizontal extension of 3rd flr, dinning room w/(e) lower floor. alteration of windows by staircase.addition of wetbar.Details
this permit is to make minor alteration to previouis approved p/a#201107261097. that is current under construction. move stair to roof deck, relocate new roof deck. horizontal extension of 3rd flr, dinning room w/(e) lower floor. alteration of windows by staircase.addition of wetbar. |