Mc Grath Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Apr 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 5 completed, 1 in progress, 7 never finaled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2024 | In progress filed Apr 2024, not yet issued | 4545 20th St | revision to pa 201711214504: altering number and size of soldier piles. altering reinforcing steel in permanent concrete structure.Details
revision to pa 201711214504: altering number and size of soldier piles. altering reinforcing steel in permanent concrete structure. | |
| Apr 15, 2022 | Never finaled issued Apr 2022, no final | 2175 Hayes St | excavation shoring. reference to structural addendum pa #201806283235-s1Details
excavation shoring. reference to structural addendum pa #201806283235-s1 | $75,000 |
| Jun 28, 2018 | Never finaled issued Mar 2021, no final | 2175 Hayes St | erect a 5 stories with 4 dwelling unit apartment type 5-aDetails
erect a 5 stories with 4 dwelling unit apartment type 5-a | $1,400,000 |
| Mar 26, 2018 | Never finaled issued Feb 2021, no final | 461 29th St | to erect a type v-a, 3-story plus 1 basement building with two-family dwelling units and one accessory dwelling unit (adu). note that the type of construction was changed during the site permit approval process from type v-a to type iii-a, dmj 10/19/2022;Details
to erect a type v-a, 3-story plus 1 basement building with two-family dwelling units and one accessory dwelling unit (adu). note that the type of construction was changed during the site permit approval process from type v-a to type iii-a, dmj 10/19/2022; | $1,150,000 |
| Dec 19, 2017 | Completed final sign-off Dec 2017 | 461 29th St | to comply with nov 201178914. repair (e) entry stairs, sever wood steps), less than 50%.Details
to comply with nov 201178914. repair (e) entry stairs, sever wood steps), less than 50%. | $1,000 |
| Nov 21, 2017 | Never finaled issued Aug 2019, no final | 4547 20th St | erect a 5-story, type 5a, 2 family dwelling units, residential bldg.Details
erect a 5-story, type 5a, 2 family dwelling units, residential bldg. | $1,050,000 |
| Oct 12, 2017 | Never finaled issued Oct 2017, no final | 4547 20th St | emergency order demolition- order #108897-eDetails
emergency order demolition- order #108897-e | $10,000 |
| Mar 24, 2017 | Never finaled issued Mar 2017, no final | 4547 20th St | interior remove trim and door that is rotted also siding that decayed on same (rear) wall.Details
interior remove trim and door that is rotted also siding that decayed on same (rear) wall. | $980 |
| Sep 19, 2012 | Completed final sign-off May 2016 | 538 28th St | to erect 4 stories with 1 basement, single family dwelling.Details
to erect 4 stories with 1 basement, single family dwelling. | $675,000 |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 538 28th St | demolish 2 stories, type 5, single family dwelling building. (emergency order #104484e.)Details
demolish 2 stories, type 5, single family dwelling building. (emergency order #104484e.) | $9,000 |
| Aug 26, 2011 | Never finaled issued Sep 2011, no final | 746 Carolina St | internal shoring for work under pa 2005-06-07-4411 and pa 2010-05-10-2102 (new construction)Details
internal shoring for work under pa 2005-06-07-4411 and pa 2010-05-10-2102 (new construction) | $80,000 |
| Jun 1, 2011 | Completed final sign-off Jan 2012 | 577 Filbert St | foundation upgrade along rear foundation and west side of rear yard, dry rote repair of framing and stairs in rear yardDetails
foundation upgrade along rear foundation and west side of rear yard, dry rote repair of framing and stairs in rear yard | $9,000 |
| Jan 12, 2011 | Completed final sign-off Feb 2011 | 720 Carolina St | close off (e) door & window @ p.l. remove (e) encroaching, (n) siding to match (e).Details
close off (e) door & window @ p.l. remove (e) encroaching, (n) siding to match (e). | $12,000 |