Block 0991, lot 020
142 Arguello Blvd
- City’s use
- Single Family Residential
- Built
- 1993
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 4,106 sq ft
- Lot
- 3,025 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 142 Arguello Bl | exterior work only: remove previous extensions into rear yard. create new rear yard facing sliders on 1/f. infill portions of side facing lightwells on 1/f & basement, each no more than 1 story above grade. new accessory entrance. new hatch to unoccupied roof/condensers. no work visible from public.Details
exterior work only: remove previous extensions into rear yard. create new rear yard facing sliders on 1/f. infill portions of side facing lightwells on 1/f & basement, each no more than 1 story above grade. new accessory entrance. new hatch to unoccupied roof/condensers. no work visible from public. | $65,000 | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 142 Arguello Bl | interior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance.Details
interior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance. | $415,000 | |
| Jan 2, 2025 | Completed final sign-off Jan 2026 | 142 Arguello Bl | Christopher Wells Construction Inc. | partial south foundation upgrade to accomodate grade clearance at garage space. interior work - side of building.Details
partial south foundation upgrade to accomodate grade clearance at garage space. interior work - side of building. | $15,000 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 142 Arguello Bl | street spaceDetails
street space | ||
| Jun 10, 2016 | Completed final sign-off Nov 2016 | 142 Arguello Bl | Bay Marin Construction | 3rd flr: gut & replace all fixtures & surfaces inmaster bath keeping same layout; add pocket door to master bth entry; in family room add outlets & wiring for new tv location. 2nd (main) flr: in sun rm insulate walls only, add new sheetrock, replace 4 windows with same size dual glazed,low e at rearDetails
3rd flr: gut & replace all fixtures & surfaces inmaster bath keeping same layout; add pocket door to master bth entry; in family room add outlets & wiring for new tv location. 2nd (main) flr: in sun rm insulate walls only, add new sheetrock, replace 4 windows with same size dual glazed,low e at rear | $100,000 |
| Oct 27, 2015 | Completed final sign-off Apr 2016 | 142 Arguello Bl | Bay Marin Construction | remodel 2 bathrooms on top floor. relocate toilets and sinks. remove closet in bath 2.Details
remodel 2 bathrooms on top floor. relocate toilets and sinks. remove closet in bath 2. | $65,000 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 142 Arguello Bl | Phollies Inc | full remodel of (e) 2nd floor bath, new plumbing, electrical, tile, partial remodel of 2nd floor bath, new lighting, sink and faucet. all work to comply wiht all codes and title 24 regulations. no structuralDetails
full remodel of (e) 2nd floor bath, new plumbing, electrical, tile, partial remodel of 2nd floor bath, new lighting, sink and faucet. all work to comply wiht all codes and title 24 regulations. no structural | $30,000 |
| Apr 27, 2006 | Completed final sign-off May 2006 | 142 Arguello Bl | Anderson Roofing & Sheet Metal | reroofingDetails
reroofing | $13,400 |
| May 14, 2002 | Completed final sign-off Oct 2002 | 142 Arguello Bl | remove & replace existing brick in kind. 100 of per 1403 sfbcDetails
remove & replace existing brick in kind. 100 of per 1403 sfbc | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Marin Construction (2), Anderson Roofing & Sheet Metal, Christopher Wells Construction Inc., Phollies Inc
- Architects
- Ryan Knock (2)
- Engineers
- Timothy O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.