Permit GraphShortlistSan Francisco building permits since 2000

Xiaopei Qi

License
4403
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
Firm
Qi Structural Engineering
On San Francisco permits
Oct 2018 to Sep 2026

13 permits since 2000 (engineer on 13 permits): 7 completed, 4 in progress, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
4-Mac Construction (2), Kmh Construction Company (2), Miracle Building Maintenance (2), T & R Contractors Inc (2), Benjamin Builder, D A Construction, Hong's General Construction Inc, Jesus Henriquez, Occidental Express, Pineda Construction Inc, Van Jones Construction
Architects
Ryan Knock (2), Mark Topetcher, Meng Hsiu Chen
Engineers
Angelito M. Perez, Charles Li

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 21, 2026In progress
filed Sep 2026, not yet issued
2262 30th Avbuild new staircase interior to connect upper and lower levels
Details
Permit
202609218434

build new staircase interior to connect upper and lower levels

Open the permit page

$10,000
Apr 6, 2026In progress
filed Apr 2026, not yet issued
748 San Bruno Averect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.
Details
Permit
202510207726

erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.

Open the permit page

$1,500,000
Apr 6, 2026In progress
filed Apr 2026, not yet issued
748 San Bruno Avdemolish 2-story, type 5b, single family residential building.
Details
Permit
202510207725

demolish 2-story, type 5b, single family residential building.

Open the permit page

$5,000
May 29, 2024In progress
issued Oct 2026
3529 Mission StHong's General Construction Incto comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building.
Details
Permit
202305258662
Permit issued
Oct 8, 2026

to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building.

Open the permit page

$180,000
Feb 16, 2023Completed
final sign-off Feb 2026
1665 Haight StOccidental Expressrevision to pa# 202208029749, complying with complaint 20229992 & 20229994, installing support beam beneath e cracked wood built-up beam. accessibility upgrade of existing front entry
Details
Permit
202302162151
Permit issued
Apr 4, 2023
Final sign-off
Feb 2, 2026

revision to pa# 202208029749, complying with complaint 20229992 & 20229994, installing support beam beneath e cracked wood built-up beam. accessibility upgrade of existing front entry

Open the permit page

$8,500
Nov 29, 2021Completed
final sign-off Aug 2025
1457 Hudson Av4-Mac Construction, T & R Contractors Inc, Miracle Building Maintenancerevision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall.
Details
Permit
202111293198
Permit issued
Jun 30, 2022
Final sign-off
Aug 4, 2025

revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall.

Open the permit page

$75,000
Nov 18, 2021Completed
final sign-off Mar 2025
331 Capitol AvVan Jones Constructionconvert (e) den 1/f to family rm, add approx 72 sq. ft. walk-in closet/storage @ rear of bedrm, convert closet to laundry 1/f, create wall/doorway between new primary/(e) bedroom, add 14 sq ft to (e) bathrm 1/f, expand (e) bath 2/f into (e) closet, remodel kitchen in-kind
Details
Permit
202111182748
Permit issued
Oct 7, 2022
Final sign-off
Mar 25, 2025

convert (e) den 1/f to family rm, add approx 72 sq. ft. walk-in closet/storage @ rear of bedrm, convert closet to laundry 1/f, create wall/doorway between new primary/(e) bedroom, add 14 sq ft to (e) bathrm 1/f, expand (e) bath 2/f into (e) closet, remodel kitchen in-kind

Open the permit page

$104,000
Aug 11, 2021Completed
final sign-off Aug 2025
1457 Hudson Av4-Mac Construction, T & R Contractors Inc, Miracle Building Maintenance, D A Constructioninstallation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)
Details
Permit
202108116264
Permit issued
Sep 9, 2021
Final sign-off
Aug 4, 2025

installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)

Open the permit page

$75,000
May 28, 2021Never finaled
filed May 2021, never issued
1503 Dolores StJesus Henriquez1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration.
Details
Permit
202105281318

1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration.

Open the permit page

$2,500
May 11, 2021Completed
final sign-off Jan 2022
92 Forest View DrKmh Construction Companyrevising design to (1) sliding door instead of (2) sliding doors. reference to pa #201912179813
Details
Permit
202105110130
Permit issued
Jul 9, 2021
Final sign-off
Jan 11, 2022

revising design to (1) sliding door instead of (2) sliding doors. reference to pa #201912179813

Open the permit page

Jul 10, 2020Completed
final sign-off Mar 2021
382 21st AvPineda Construction Inc2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher na
Details
Permit
202007109989
Permit issued
Nov 30, 2020
Final sign-off
Mar 23, 2021

2/f -ti for dance stuio as per cua to establish a service instructional use (dba dance training center/sf) within a 6969sqft 2nd fl & mezz lvl of (e) vacant space to include new partitions walls, 4 dance studios, dressing rooms, office & lounge area. maher na

Open the permit page

$70,000
Dec 17, 2019Completed
final sign-off Jan 2022
92 Forest View DrBenjamin Builder, Kmh Construction Companyadd the playroom and bathroom on 1st fl
Details
Permit
201912179813
Permit issued
Nov 18, 2020
Final sign-off
Jan 11, 2022

add the playroom and bathroom on 1st fl

Open the permit page

$40,000
Oct 31, 2018Never finaled
issued Nov 2018, no final
125 Marview Wyremoval of 1 partition wall and 1 bearing wall at 2nd fl. reinforcement of footings at lower fl and installation of new beam upper fl. patch walls and ceiling , paint to match interior colors
Details
Permit
201810314655
Permit issued
Nov 26, 2018

removal of 1 partition wall and 1 bearing wall at 2nd fl. reinforcement of footings at lower fl and installation of new beam upper fl. patch walls and ceiling , paint to match interior colors

Open the permit page

$12,000