Miracle Building Maintenance
- Based in
- Richmond
- On San Francisco permits
- Feb 2008 to Jul 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2022 | Completed final sign-off Aug 2022 | 289 Sadowa St | reroofing associated with permit 202003137098.Details
reroofing associated with permit 202003137098. | $10,000 |
| Nov 29, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall.Details
revision to pa #2021/0811/6264. comply with nov#202183375. dry rot repair @ rear. more than 50% in-kind replacement of front and rear ext stairs. replace windows throughout(same size,same location). new elec furnace, increase rafter size @ attic to acommodate new insulation, replace dry wall. | $75,000 |
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| Mar 13, 2020 | Completed final sign-off Jan 2023 | 289 Sadowa St | relocate (e) bedroom & kitchen at 1st level. remove one full bathroom & remodel (e) bathroom at 1st level. add washer & dryer at 1st level. repair roofDetails
relocate (e) bedroom & kitchen at 1st level. remove one full bathroom & remodel (e) bathroom at 1st level. add washer & dryer at 1st level. repair roof | $40,000 |
| Feb 28, 2008 | Expired or cancelled expired Apr 2010 | 363 Richland Av | revision to application # 200611178079s, replace back window 5 x 4 by patio door, remove window , reduce window size, remove partition wall. all this job is at the back addition. built 1 hour rated wall at property line.Details
revision to application # 200611178079s, replace back window 5 x 4 by patio door, remove window , reduce window size, remove partition wall. all this job is at the back addition. built 1 hour rated wall at property line. | $2,300 |