Back to kitchen remodel contractors
Miracle Building Maintenance
- Based in
- Richmond
- On San Francisco permits
- Feb 2008 to Jul 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 448 days from filing to permit and 801 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2021 | Completed final sign-off Aug 2025 | 1457 Hudson Av | installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf)Details
installation of bathroom in the attic bedroom #3. interior remodel: main flr kitchen are to be remodeled. basement unit: kitchen re-design and updated. (e) bathroom remodel and relocated. add laundry room (52sf) | $75,000 |
| Mar 13, 2020 | Completed final sign-off Jan 2023 | 289 Sadowa St | relocate (e) bedroom & kitchen at 1st level. remove one full bathroom & remodel (e) bathroom at 1st level. add washer & dryer at 1st level. repair roofDetails
relocate (e) bedroom & kitchen at 1st level. remove one full bathroom & remodel (e) bathroom at 1st level. add washer & dryer at 1st level. repair roof | $40,000 |