Ggd Inc.
- Based in
- Sausalito
- On San Francisco permits
- Apr 2008 to Aug 2026
- Last 24 months
- 18 permits filed
193 permits since 2000: 134 completed, 17 in progress, 28 never finaled, 14 expired or cancelled.
Of the 28 never-finaled permits, 3 are 3 to 5 years old, 16 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 193.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 30 Presidio Tr | revision to bpa# 202403157975, reconfiguration of existing walls to as built conditionsDetails
revision to bpa# 202403157975, reconfiguration of existing walls to as built conditions | $5,000 |
| Jul 17, 2026 | Completed final sign-off Aug 2026 | 2709 Larkin St | to obtain final inspection for work approved under pa#201010193372. all work is complete.Details
to obtain final inspection for work approved under pa#201010193372. all work is complete. | |
| Apr 30, 2026 | In progress issued May 2026 | 19 25th North Av | powder room toilet vanity lightx fxiture sink and faucet replacement.Details
powder room toilet vanity lightx fxiture sink and faucet replacement. | $15,000 |
| Apr 22, 2026 | In progress issued Jun 2026 | 2736 Bush St | small remodel of 1 residentail unit in a 2 unit building: replace 3 e) vinyl windows, adding a sauna at the front deck, not visible from street, new interior bookcaseDetails
small remodel of 1 residentail unit in a 2 unit building: replace 3 e) vinyl windows, adding a sauna at the front deck, not visible from street, new interior bookcase | $41,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 2765 Vallejo St | revision to pa 202508213594 structural work only . change plywood shear wall to concrete. modify concrete slab to adjust to field conditions. no exterior work . revision requested by building inspectorDetails
revision to pa 202508213594 structural work only . change plywood shear wall to concrete. modify concrete slab to adjust to field conditions. no exterior work . revision requested by building inspector | $4,500 |
| Oct 16, 2025 | In progress issued Dec 2025 | 9 25th Ave North Av | new construction of adu: a 2-story type-v with fire sprinklersDetails
new construction of adu: a 2-story type-v with fire sprinklers | $150,000 |
| Sep 5, 2025 | In progress issued Dec 2025 | 2765 Vallejo St | construction of 1 detached adu: 2 story type v-b ~1000sf.Details
construction of 1 detached adu: 2 story type v-b ~1000sf. | $308,000 |
| Sep 2, 2025 | Completed final sign-off Aug 2026 | 30 Presidio Tr | revision 202403157975- addition (n) exterior concrete stair and entry into basement on east side of unit and (n) exterior concrete stair and entry through (e) window into basement on south side dwelling.Details
revision 202403157975- addition (n) exterior concrete stair and entry into basement on east side of unit and (n) exterior concrete stair and entry through (e) window into basement on south side dwelling. | $20,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 9 25th North Av | replace (e) pool w/(n)_ pool and hardscaping.Details
replace (e) pool w/(n)_ pool and hardscaping. | $45,000 |
| Aug 5, 2025 | In progress issued Oct 2025 | 2765 Vallejo St | construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352Details
construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352 | $32,525 |
| Jul 3, 2025 | In progress issued Jul 2025 | 19 25th North Av | kitchen remodel. non-structural. replace in kind. no exterior work.Details
kitchen remodel. non-structural. replace in kind. no exterior work. | $150,000 |
| Jun 24, 2025 | In progress issued Sep 2025 | 2765 Vallejo St | interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace.Details
interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace. | $68,550 |
| Jun 18, 2025 | In progress issued Jul 2026 | 31 Presidio Tr | interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egressDetails
interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egress | $1,500,000 |
| May 15, 2025 | Completed final sign-off Jun 2026 | 1767 Green St | revision to pa #2024-0806-7997 (n) unconditioned storage at (n) crawl space. (n) retaining wall in rear yard. relocate (n) water heaters and heat pumps within crawl space.Details
revision to pa #2024-0806-7997 (n) unconditioned storage at (n) crawl space. (n) retaining wall in rear yard. relocate (n) water heaters and heat pumps within crawl space. | |
| Mar 25, 2025 | Completed final sign-off Mar 2025 | 31 Orben Pl | to obtain final inspection for work approved under pa# 9813301, 9918355. all work is complete.Details
to obtain final inspection for work approved under pa# 9813301, 9918355. all work is complete. | |
| Feb 7, 2025 | In progress issued Feb 2025 | 30 Presidio Tr | voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly.Details
voluntary replacement in kind of existing dryrotted roof deck guard railing with new structural steel reinforced guard railing with exterior cladding to match existing exactly. | $20,000 |
| Feb 5, 2025 | Completed final sign-off Mar 2025 | 31 Orben Pl | revision to 202202087588: remove scope of work that was not completed- rear yard awning, 3rd fl powder rm, 3rd fl guardrail, 4th fl rear balcony, & decorative entablative at front were removed from the scopeDetails
revision to 202202087588: remove scope of work that was not completed- rear yard awning, 3rd fl powder rm, 3rd fl guardrail, 4th fl rear balcony, & decorative entablative at front were removed from the scope | |
| Jan 2, 2025 | In progress issued Jan 2025 | 9 25th North Av | (n) outdoor shower and (n) fixed fire rated window @ 3rd floor west facadeDetails
(n) outdoor shower and (n) fixed fire rated window @ 3rd floor west facade | $13,000 |
| Aug 6, 2024 | Completed final sign-off Jun 2026 | 1767 Green St | 2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yardDetails
2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yard | $300,000 |
| Apr 8, 2024 | In progress issued Mar 2025 | 30 Presidio Tr | excavate existing crawl spaces withink existing bldg basement garage to match existing garage floor level. new foundation and structural framing as reqiuired. no change to the conditioned spaces or exterior of the residence. mech, elect and plumb under sep permit.Details
excavate existing crawl spaces withink existing bldg basement garage to match existing garage floor level. new foundation and structural framing as reqiuired. no change to the conditioned spaces or exterior of the residence. mech, elect and plumb under sep permit. | $40,000 |
| Mar 22, 2024 | In progress issued Sep 2024 | 9 25th North Av | int. & ext. remodel w/ horizontal additions & infill.englarg wdw & door openings & new finishes throughout. excavation at 1/f laundry & gym areas. new structural,mech,elec systems. (e) front yard swimming pool to be replace with new & hot tub.Details
int. & ext. remodel w/ horizontal additions & infill.englarg wdw & door openings & new finishes throughout. excavation at 1/f laundry & gym areas. new structural,mech,elec systems. (e) front yard swimming pool to be replace with new & hot tub. | $2,800,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2025 | 2765 Vallejo St | removal and replacement of a portion of (e) property line fence along the westernmost portion of the subject property. other work under permit 202009083673Details
removal and replacement of a portion of (e) property line fence along the westernmost portion of the subject property. other work under permit 202009083673 | $4,800 |
| Jul 21, 2023 | In progress issued Feb 2024 | 3525 Washington St | horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count.Details
horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count. | $50,000 |
| Jul 5, 2023 | In progress issued Jan 2024 | 3525 Washington St | exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count.Details
exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count. | $30,000 |
| Apr 6, 2023 | Completed final sign-off Apr 2023 | 230 Seacliff Av | revision permit in reference to permit 202106011367. new in-ground stainless steel hot tub in rear yard scope removed. replacing (e) third floor guardrail only scope performed.Details
revision permit in reference to permit 202106011367. new in-ground stainless steel hot tub in rear yard scope removed. replacing (e) third floor guardrail only scope performed. | |
| Feb 3, 2023 | Completed final sign-off May 2023 | 2636 Union St | front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way.Details
front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way. | $30,000 |
| Dec 23, 2022 | Never finaled issued Dec 2022, no final | 170 Palo Alto Av | recommencement and completion of work approved under bpa#201907317446, 201910073764 & 201910285771Details
recommencement and completion of work approved under bpa#201907317446, 201910073764 & 201910285771 | $97,800 |
| Dec 14, 2022 | Never finaled issued May 2023, no final | 3525 Washington St | interior remodel within (e) building including structural work, new mat slab foundation, light well infill at 1st fl. and 2nd fl. addition under overchange at 1st fl. window relocation on east elevation (n) windows and doors at rearDetails
interior remodel within (e) building including structural work, new mat slab foundation, light well infill at 1st fl. and 2nd fl. addition under overchange at 1st fl. window relocation on east elevation (n) windows and doors at rear | $800,000 |
| Nov 30, 2022 | Completed final sign-off Sep 2024 | 30 Presidio Tr | new exterior rear yard additions of back up electrical generator and vault, future portable spa enclosure, 100 sq ft garden storage shed. no work in e single family dwelling. plumbing and elec as required under sep permitDetails
new exterior rear yard additions of back up electrical generator and vault, future portable spa enclosure, 100 sq ft garden storage shed. no work in e single family dwelling. plumbing and elec as required under sep permit | $40,000 |
| Nov 9, 2022 | Never finaled issued Nov 2022, no final | 3525 Washington St | regulated asbestos containing material per report #b338145. domo existing interior finishes-sheetrock and flooring. no electrical and plumbing work. finishes to be replaced in-kind.Details
regulated asbestos containing material per report #b338145. domo existing interior finishes-sheetrock and flooring. no electrical and plumbing work. finishes to be replaced in-kind. | $2,500 |
| Aug 25, 2022 | Completed final sign-off Sep 2022 | 3696 Clay St | updated structural drawings based on as-is conditions for permit bpa#201912109111.Details
updated structural drawings based on as-is conditions for permit bpa#201912109111. | |
| Jun 21, 2022 | Completed final sign-off Feb 2025 | 2765 Vallejo St | addition of bay window @ west sideyard third floor laundry room. other work under permit 202009083673.Details
addition of bay window @ west sideyard third floor laundry room. other work under permit 202009083673. | $15,000 |
| Jun 3, 2022 | Completed final sign-off May 2026 | 2640 Jackson St | interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit.Details
interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit. | $1,200,000 |
| Feb 8, 2022 | Completed final sign-off Mar 2025 | 31 Orben Pl | interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry"Details
interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry" | $320,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2025 | 2765 Vallejo St | partial infill of east lightwell on 2/3 floor only. (no extension past existing envelope) other work under permit no. 2020 0908 3673Details
partial infill of east lightwell on 2/3 floor only. (no extension past existing envelope) other work under permit no. 2020 0908 3673 | $45,000 |
| Jan 18, 2022 | Completed final sign-off Sep 2026 | 30 Presidio Tr | addition of (1) new roof dormer, enlarge(1) e roof dormer, modif. of a ceiling below an e roof dormer, addition of a new roof access from the e attic, renov. of (2) e bathrms, e attic stair & water damaged interior finishes. addition of a new portable spa in rear yard. mech, elec, plumb. as req.Details
addition of (1) new roof dormer, enlarge(1) e roof dormer, modif. of a ceiling below an e roof dormer, addition of a new roof access from the e attic, renov. of (2) e bathrms, e attic stair & water damaged interior finishes. addition of a new portable spa in rear yard. mech, elec, plumb. as req. | $500,000 |
| Sep 14, 2021 | Never finaled issued Oct 2021, no final | 2765 Vallejo St | rev to pa# 2020-0908-3673; update notation on sheet a0.4 pertaing to fire sprinkler systemDetails
rev to pa# 2020-0908-3673; update notation on sheet a0.4 pertaing to fire sprinkler system | |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 3067 Sacramento St | remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural.Details
remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural. | $60,000 |
| Jul 6, 2021 | Never finaled issued Jul 2021, no final | 2775 Vallejo St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $11,000 |
| Jun 1, 2021 | Completed final sign-off Apr 2023 | 230 Seacliff Av | replacing (e)g 3rd floor guardrail & adding (n) in-ground stainless steel hot tub in rear yard.Details
replacing (e)g 3rd floor guardrail & adding (n) in-ground stainless steel hot tub in rear yard. | $115,000 |
| May 24, 2021 | Completed final sign-off Aug 2022 | 170 Palo Alto Av | solid wood plain fence in back yard on property line. fence is not visible from street. fence not to exceed 6 feet in height.Details
solid wood plain fence in back yard on property line. fence is not visible from street. fence not to exceed 6 feet in height. | $5,000 |
| May 19, 2021 | Completed final sign-off Dec 2022 | 2739 Larkin St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Dec 21, 2020 | Never finaled issued Jan 2021, no final | 170 Palo Alto Av | revision to bpa# 201912200188 to include a minor change to the interior floor plan or the existing pool house, minor electrical work. no exterior work required.Details
revision to bpa# 201912200188 to include a minor change to the interior floor plan or the existing pool house, minor electrical work. no exterior work required. | $5,000 |
| Sep 20, 2020 | Expired or cancelled withdrawn Nov 2020 | 170 Palo Alto Av | re-grading site, subsequent retaining walls, landscaping work and stairs.Details
re-grading site, subsequent retaining walls, landscaping work and stairs. | $50,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable.Details
below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable. | $1,600,000 |
| Jun 24, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basementDetails
remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basement | $50,000 |
| Jan 2, 2020 | Completed final sign-off Sep 2022 | 3696 Clay St | all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior workDetails
all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior work | $35,000 |
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 170 Palo Alto Av | new enclosure of existing pool house with open air courtyard, workshop, and associated washroomDetails
new enclosure of existing pool house with open air courtyard, workshop, and associated washroom | $30,000 |
| Dec 10, 2019 | Completed final sign-off Sep 2022 | 3696 Clay St | exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel.Details
exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel. | $500,000 |
| Nov 27, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | addition of dumbwaiter @ all levels. addition of glass & steel atrium @ 1st fl. alterations to rear facade windows. replace (e) roof over hot tub @ rear yard. selective interior remodel @ all levels w/ (n) finishes.Details
addition of dumbwaiter @ all levels. addition of glass & steel atrium @ 1st fl. alterations to rear facade windows. replace (e) roof over hot tub @ rear yard. selective interior remodel @ all levels w/ (n) finishes. | $450,000 |
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 170 Palo Alto Av | interior remodel to include baths, selective structural upgrades, selective new windows, selective interior and exterior doors.Details
interior remodel to include baths, selective structural upgrades, selective new windows, selective interior and exterior doors. | $60,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 3540 Jackson St | insstall gate and fence @ front setback existing single family dwelling, ref pa 2018-0709-4021Details
insstall gate and fence @ front setback existing single family dwelling, ref pa 2018-0709-4021 | $15,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top levelDetails
replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top level | $300,000 |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 170 Palo Alto Av | remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan)Details
remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan) | $25,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2024 | 30 Presidio Tr | soldier pile and 3x pt plank retaining wall at south property line e partial at sw of west property lineDetails
soldier pile and 3x pt plank retaining wall at south property line e partial at sw of west property line | $150,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 2945 Scott St | remodel (2) bathrooms (90 sq. ft./50 sq. ft.), remove decorative woodwork ceiling @ bedroom (100 sq. ft.), remove nonfunctioning fireplace @ bedroom, not visible from outside, replace oak front door in-kind (w/sidelights, match (e) sticking, rails/stiles & profiles).Details
remodel (2) bathrooms (90 sq. ft./50 sq. ft.), remove decorative woodwork ceiling @ bedroom (100 sq. ft.), remove nonfunctioning fireplace @ bedroom, not visible from outside, replace oak front door in-kind (w/sidelights, match (e) sticking, rails/stiles & profiles). | $25,000 |
| Jan 3, 2019 | Completed final sign-off Jun 2019 | 3060 Pacific Av | new fence at rear yard maher naDetails
new fence at rear yard maher na | $20,000 |
| Dec 14, 2018 | Completed final sign-off Jun 2021 | 2739 Broderick St | interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacementDetails
interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacement | $800,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 3540 Jackson St | renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher naDetails
renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher na | $900,000 |
| Apr 12, 2018 | Never finaled issued May 2018, no final | 2611 Divisadero St | existing partial crawl space to be excaveted per approved pa# 201706078655, this application just adds the approved variance area to the projectDetails
existing partial crawl space to be excaveted per approved pa# 201706078655, this application just adds the approved variance area to the project | $100,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 3540 Jackson St | renovation of 3 story sfd - alter stairs, remove bedroom create garage maher naDetails
renovation of 3 story sfd - alter stairs, remove bedroom create garage maher na | $100,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 27 Presidio Tr | alteration & horizontal expansion to (e) single family home. expand (e) garage 93 sf & expand deck 95 sf. remove hip roof off master bdrm. remove master bdrm deck.Details
alteration & horizontal expansion to (e) single family home. expand (e) garage 93 sf & expand deck 95 sf. remove hip roof off master bdrm. remove master bdrm deck. | $65,000 |
| Feb 2, 2018 | Completed final sign-off Jun 2021 | 3060 Pacific Av | addition at sub-grade basement and 1st flr at rear(north) facade. a balcony will be placed above the addition that will also have an exterior stair to the 3rd flr for life safety compliance. **maher n/a**Details
addition at sub-grade basement and 1st flr at rear(north) facade. a balcony will be placed above the addition that will also have an exterior stair to the 3rd flr for life safety compliance. **maher n/a** | $250,000 |
| Sep 26, 2017 | Completed final sign-off Jan 2018 | 2644 Filbert St | replacement of elevated deck railing, scope of work will not include replacement of (e) deckDetails
replacement of elevated deck railing, scope of work will not include replacement of (e) deck | $10,000 |
| Aug 24, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher naDetails
remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher na | $950,000 |
| Jul 26, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | add vestibule between garage and 1/f bedroom, move bathroom location and add gas fireplace. n/a ordinance #155-13Details
add vestibule between garage and 1/f bedroom, move bathroom location and add gas fireplace. n/a ordinance #155-13 | $3,500 |
| Jul 12, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | replace (e) wood windows with (n) metal windows throughout. no change at the facade. n/a ordinance #155-13Details
replace (e) wood windows with (n) metal windows throughout. no change at the facade. n/a ordinance #155-13 | $98,000 |
| Jun 7, 2017 | Never finaled issued Sep 2017, no final | 2611 Divisadero St | excavation of (e) partial crawl space @ basement level for construction of new full basement level including full bathroom. replacement of (e) windows @ front facade with in kind windows. ** maher: exempted: approval from dph attached **Details
excavation of (e) partial crawl space @ basement level for construction of new full basement level including full bathroom. replacement of (e) windows @ front facade with in kind windows. ** maher: exempted: approval from dph attached ** | $287,600 |
| Jun 6, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms.Details
remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms. | $50,000 |
| May 30, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade.Details
horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade. | $500,000 |
| May 23, 2017 | Never finaled issued Jul 2018, no final | 2945 Scott St | remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight.Details
remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight. | $150,000 |
| May 10, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | foundation replacement and lower floor slab and replace bath at lower level, add new bath as wellDetails
foundation replacement and lower floor slab and replace bath at lower level, add new bath as well | $65,000 |
| May 1, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system.Details
remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system. | $30,000 |
| Mar 3, 2017 | Expired or cancelled cancelled Jan 2026 | 2945 Scott St | remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement levelDetails
remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement level | $390,000 |
| Jan 19, 2017 | Never finaled issued Jan 2017, no final | 2656 Filbert St | street spaceDetails
street space | |
| Jan 19, 2017 | Never finaled issued Jan 2017, no final | 238 Presidio Av | street spaceDetails
street space | |
| Oct 11, 2016 | Completed final sign-off May 2022 | 2865 Vallejo St | vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a**Details
vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a** | $135,000 |
| Aug 31, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | revision to 201608054286 structural changes to walls, added steel, rework of winder at stairs, relocate powder roomDetails
revision to 201608054286 structural changes to walls, added steel, rework of winder at stairs, relocate powder room | $50,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | remove/replace finishes @ kitchen, reconfigure & install new cabinets, reinstall plumbing fixtures, countertops, paint, refinish floor. no changes to walls, doors or openings.Details
remove/replace finishes @ kitchen, reconfigure & install new cabinets, reinstall plumbing fixtures, countertops, paint, refinish floor. no changes to walls, doors or openings. | $50,000 |
| Jun 28, 2016 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13.Details
rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13. | $131,800 |
| Apr 21, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | remove and replace finishes & fixtures in 3 bathrooms, paint interior, refinish hw floors, exisitng footing discovery. exploratory demo, confirm structural members, remove base, doors, new master closet cabinets. midspan garage ceiling, basement cellar rear of house. bed & bath ceiling at garage levDetails
remove and replace finishes & fixtures in 3 bathrooms, paint interior, refinish hw floors, exisitng footing discovery. exploratory demo, confirm structural members, remove base, doors, new master closet cabinets. midspan garage ceiling, basement cellar rear of house. bed & bath ceiling at garage lev | $50,000 |
| Apr 21, 2016 | Completed final sign-off Apr 2017 | 3230 Jackson St | to obtain final inspection for work approved under pa# 200806023413 and 200808058421. all work is complete.Details
to obtain final inspection for work approved under pa# 200806023413 and 200808058421. all work is complete. | |
| Mar 16, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | excavation of basement and rear yard. interior renovation of ground floor and basement. reconfigure service stair, new play room, and exterior sports court.Details
excavation of basement and rear yard. interior renovation of ground floor and basement. reconfigure service stair, new play room, and exterior sports court. | $300,000 |
| Mar 9, 2016 | Completed final sign-off Mar 2016 | 615 Buena Vista West Av | to obtain final inspection for work approved under app200608119253. all work is complete.Details
to obtain final inspection for work approved under app200608119253. all work is complete. | |
| Mar 7, 2016 | Completed final sign-off May 2016 | 2434 Broadway | 1)convert extg unoccupied lower roof area to occupied roof deck allowed under 2013 cole. 2) document stair #6 to as built config. (opposite from permitted) n/a for maherDetails
1)convert extg unoccupied lower roof area to occupied roof deck allowed under 2013 cole. 2) document stair #6 to as built config. (opposite from permitted) n/a for maher | |
| Feb 19, 2016 | Expired or cancelled cancelled Mar 2016 | 615 Buena Vista West Av | to obtain a final inspection for work approved under pa# 200608119253 & 201003027402, all work is complete.Details
to obtain a final inspection for work approved under pa# 200608119253 & 201003027402, all work is complete. | |
| Nov 6, 2015 | Completed final sign-off Feb 2016 | 238 Presidio Av | exploratory demo, confirm structural members, remove carpet hwf, base, doors. n/a ordinance #155-13Details
exploratory demo, confirm structural members, remove carpet hwf, base, doors. n/a ordinance #155-13 | $5,000 |
| Nov 2, 2015 | Completed final sign-off Aug 2016 | 2570 Jackson St | revision to permit 2014-0228-9556, remove pool from scope, spa onlyDetails
revision to permit 2014-0228-9556, remove pool from scope, spa only | |
| Aug 7, 2015 | Completed final sign-off Oct 2015 | 2570 Jackson St | new fence at rear yard 8'-0" max; maher n/aDetails
new fence at rear yard 8'-0" max; maher n/a | $5,000 |
| Jan 28, 2015 | Completed final sign-off Dec 2015 | 2434 Broadway | revision to 201402078070 at roof. change 42" metal maintenance rail to 1 hr prapet/guard at east. change 42" h metal maintenance rail to tempered glass in glass shoeDetails
revision to 201402078070 at roof. change 42" metal maintenance rail to 1 hr prapet/guard at east. change 42" h metal maintenance rail to tempered glass in glass shoe | $5,700 |
| Dec 18, 2014 | Completed final sign-off Mar 2016 | 615 Buena Vista West Av | revision appl. 2013.1114.1926. revised structural details per field conditions. simplied rear yard hardsacpe, add planter at north side, add a small window on west facade.Details
revision appl. 2013.1114.1926. revised structural details per field conditions. simplied rear yard hardsacpe, add planter at north side, add a small window on west facade. | |
| Dec 11, 2014 | Completed final sign-off Mar 2016 | 2666 Broadway | the project is an extg 2 story wood framed residential bldg seismic strengthening will be preformed at the garage level and replacement of a header for a garage will be preformed.Details
the project is an extg 2 story wood framed residential bldg seismic strengthening will be preformed at the garage level and replacement of a header for a garage will be preformed. | $10,000 |
| Aug 19, 2014 | Completed final sign-off Oct 2014 | 300 Seacliff Av | revision to pa #2011.0727.1159 - placement of new play structures @ side. n/a maher ordinanceDetails
revision to pa #2011.0727.1159 - placement of new play structures @ side. n/a maher ordinance | $12,500 |
| Jun 25, 2014 | Completed final sign-off Dec 2015 | 2775 Vallejo St | rear yard landscaping including 1) replace (e) brick retaining walls with (n) 36"h conc ret walls in (n) locations. 2) (n) conc retaining walls at east property line w/ (n) conc stair on grade. 3) (n) expanded lawn area.n/a for the maher ordinance#155-13Details
rear yard landscaping including 1) replace (e) brick retaining walls with (n) 36"h conc ret walls in (n) locations. 2) (n) conc retaining walls at east property line w/ (n) conc stair on grade. 3) (n) expanded lawn area.n/a for the maher ordinance#155-13 | $31,000 |
| Jun 5, 2014 | Expired or cancelled cancelled Mar 2020 | 2342 Broadway | remove built in cabinets, replace kitchen cabinets, re-finish wood floor, install new cabinets, paint, remove stone flooring and replace with wood flooring interior finishes only.Details
remove built in cabinets, replace kitchen cabinets, re-finish wood floor, install new cabinets, paint, remove stone flooring and replace with wood flooring interior finishes only. | $50,000 |
| May 9, 2014 | Completed final sign-off Dec 2015 | 2775 Vallejo St | scope reduction to (e) issued pa#2012.0712.4701 including basement: floor area reduction & conc. foundation revisions. 1/f: floor area reduction & structure revisions, 2,3,4/f: window reconfiguration @ rear, structure revisions. n/a ordinance #155-13Details
scope reduction to (e) issued pa#2012.0712.4701 including basement: floor area reduction & conc. foundation revisions. 1/f: floor area reduction & structure revisions, 2,3,4/f: window reconfiguration @ rear, structure revisions. n/a ordinance #155-13 | |
| Apr 30, 2014 | Completed final sign-off Dec 2015 | 2775 Vallejo St | temporary shoring (excavation & property line support). n/a for the maher ordinance #155-13Details
temporary shoring (excavation & property line support). n/a for the maher ordinance #155-13 | $25,000 |
| Apr 24, 2014 | Completed final sign-off Mar 2017 | 238 Presidio Av | remodel existing single family residence. reconfigure interior walls at all levels. add 4th floor, 1 & 2 story rear yard addition. no work to front facade. ** maher: compliance with ordinance no# 155-13 not required **Details
remodel existing single family residence. reconfigure interior walls at all levels. add 4th floor, 1 & 2 story rear yard addition. no work to front facade. ** maher: compliance with ordinance no# 155-13 not required ** | $800,000 |
| Apr 8, 2014 | Completed final sign-off Aug 2016 | 2570 Jackson St | replace (e) windscreen @ south roof deck. replace (e) windscreen @ north west patio. add new balcony & spiral stair to rear yard. ** maher: compliance with ordinance no# 155-13 not required **Details
replace (e) windscreen @ south roof deck. replace (e) windscreen @ north west patio. add new balcony & spiral stair to rear yard. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| Apr 1, 2014 | Completed final sign-off Oct 2014 | 300 Seacliff Av | modification to app#201107271159 to alter side yard fences. n/a for the interim ordinance #428-13 and maher ordinance #155-13Details
modification to app#201107271159 to alter side yard fences. n/a for the interim ordinance #428-13 and maher ordinance #155-13 | $35,000 |