Back to kitchen remodel contractors
Ggd Inc.
- Based in
- Sausalito
- On San Francisco permits
- Apr 2008 to Aug 2026
- Last 24 months
- 18 permits filed
193 permits since 2000: 134 completed, 17 in progress, 28 never finaled, 14 expired or cancelled.
Of the 28 never-finaled permits, 3 are 3 to 5 years old, 16 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 22 completed, 3 in progress, 4 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 578 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2025 | In progress issued Jul 2025 | 19 25th North Av | kitchen remodel. non-structural. replace in kind. no exterior work.Details
kitchen remodel. non-structural. replace in kind. no exterior work. | $150,000 |
| Jun 24, 2025 | In progress issued Sep 2025 | 2765 Vallejo St | interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace.Details
interior remodel, no ext work. basement, create (n) conditioned storage area. 1/f: create (n) home theater, wetbar, (n) casework in bedroom. 2/f remodel kitchen, create (n) opening & (n) direct vent fireplace. 3/f install (n) built-ins & flue for fireplace. | $68,550 |
| Jun 18, 2025 | In progress issued Jul 2026 | 31 Presidio Tr | interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egressDetails
interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egress | $1,500,000 |
| Jun 3, 2022 | Completed final sign-off May 2026 | 2640 Jackson St | interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit.Details
interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit. | $1,200,000 |
| Feb 8, 2022 | Completed final sign-off Mar 2025 | 31 Orben Pl | interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry"Details
interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry" | $320,000 |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 3067 Sacramento St | remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural.Details
remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural. | $60,000 |
| Jul 6, 2021 | Never finaled issued Jul 2021, no final | 2775 Vallejo St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $11,000 |
| May 19, 2021 | Completed final sign-off Dec 2022 | 2739 Larkin St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Jun 24, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basementDetails
remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basement | $50,000 |
| Jan 2, 2020 | Completed final sign-off Sep 2022 | 3696 Clay St | all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior workDetails
all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior work | $35,000 |
| Dec 10, 2019 | Completed final sign-off Sep 2022 | 3696 Clay St | exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel.Details
exterior: new asphalt shingle roof, skylights and ext front entry lighting. interior: remove extg elevator, install nw elevator in alternate location, new powder rooms, extg kitchen remodel, extg bedroom remodel, extg attic lounge remodel. | $500,000 |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 170 Palo Alto Av | remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan)Details
remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan) | $25,000 |
| Dec 14, 2018 | Completed final sign-off Jun 2021 | 2739 Broderick St | interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacementDetails
interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacement | $800,000 |
| Aug 24, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher naDetails
remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher na | $950,000 |
| Jun 6, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms.Details
remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms. | $50,000 |
| May 30, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade.Details
horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade. | $500,000 |
| May 23, 2017 | Never finaled issued Jul 2018, no final | 2945 Scott St | remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight.Details
remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight. | $150,000 |
| May 1, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system.Details
remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system. | $30,000 |
| Mar 3, 2017 | Expired or cancelled cancelled Jan 2026 | 2945 Scott St | remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement levelDetails
remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement level | $390,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | remove/replace finishes @ kitchen, reconfigure & install new cabinets, reinstall plumbing fixtures, countertops, paint, refinish floor. no changes to walls, doors or openings.Details
remove/replace finishes @ kitchen, reconfigure & install new cabinets, reinstall plumbing fixtures, countertops, paint, refinish floor. no changes to walls, doors or openings. | $50,000 |
| Jun 28, 2016 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13.Details
rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13. | $131,800 |
| Jun 5, 2014 | Expired or cancelled cancelled Mar 2020 | 2342 Broadway | remove built in cabinets, replace kitchen cabinets, re-finish wood floor, install new cabinets, paint, remove stone flooring and replace with wood flooring interior finishes only.Details
remove built in cabinets, replace kitchen cabinets, re-finish wood floor, install new cabinets, paint, remove stone flooring and replace with wood flooring interior finishes only. | $50,000 |
| Dec 21, 2012 | Completed final sign-off Apr 2015 | 181 Buena Vista East Av | removal of garage bump out & extend front porch over garage. new balcony @ rear 2nd flr & stair to rear yard. rear horizontal addition @ 1st level. infill (e) rear balcony @ kitchen. 115 sq. ft. horizontal addition @ 3rd level. master bath, new dormer @ roof @ rear facade. new windows @ rear facade.Details
removal of garage bump out & extend front porch over garage. new balcony @ rear 2nd flr & stair to rear yard. rear horizontal addition @ 1st level. infill (e) rear balcony @ kitchen. 115 sq. ft. horizontal addition @ 3rd level. master bath, new dormer @ roof @ rear facade. new windows @ rear facade. | $175,000 |
| Oct 3, 2012 | Completed final sign-off Apr 2015 | 181 Buena Vista East Av | int remodel@all levels.incl reconf main stair,partitions on grd/fl to incl(n) wine cellar.remodel kitchen on 2/fl-recof bedrms on 3/fl& reconf rooms on 4/fl.full seismic struc upgrade. new fire sprinkler sys under seperate permit. no exterior work.Details
int remodel@all levels.incl reconf main stair,partitions on grd/fl to incl(n) wine cellar.remodel kitchen on 2/fl-recof bedrms on 3/fl& reconf rooms on 4/fl.full seismic struc upgrade. new fire sprinkler sys under seperate permit. no exterior work. | $400,000 |
| Feb 6, 2012 | Completed final sign-off Sep 2012 | 2127 Broadway | interior finish remodel. remove & replace finishes in kind including hardwood floors, kitchen cabinets & fixtures, bathroom fixtures, paint. no change on walls and opening.Details
interior finish remodel. remove & replace finishes in kind including hardwood floors, kitchen cabinets & fixtures, bathroom fixtures, paint. no change on walls and opening. | $75,000 |
| Jan 26, 2012 | Completed final sign-off Oct 2012 | 2666 Broadway | no exterior work-interior remodel only, all bathrooms to have new finishes. kitchen to have new finishes, new power room on 3rd floor. relocate stair location at basement to 2nd floor level. revision appl. 201112050089.Details
no exterior work-interior remodel only, all bathrooms to have new finishes. kitchen to have new finishes, new power room on 3rd floor. relocate stair location at basement to 2nd floor level. revision appl. 201112050089. | $350,000 |
| Dec 5, 2011 | Completed final sign-off Oct 2012 | 2666 Broadway | interior finish remodel remove and repl finishes in kind including hardwood flr, kitchen cabinets and fixtures, powder rm fixtures andpaint, kitchen lighting per cec 150(k)8 bathrm lighting per cec150(k)10Details
interior finish remodel remove and repl finishes in kind including hardwood flr, kitchen cabinets and fixtures, powder rm fixtures andpaint, kitchen lighting per cec 150(k)8 bathrm lighting per cec150(k)10 | $65,000 |
| Sep 10, 2010 | Completed final sign-off Mar 2012 | 2841 Divisadero St | interior remodel of bathrooms & kitchen, (n) curved stair @ study & dining on 2nd floor, reconfiguration of media rm on ground level into family room, replacement of (e) wood windows with new wood windows, new skylight on 3rd floor, removal of (e) non conforming second stair at 2nd & 3rd floor.Details
interior remodel of bathrooms & kitchen, (n) curved stair @ study & dining on 2nd floor, reconfiguration of media rm on ground level into family room, replacement of (e) wood windows with new wood windows, new skylight on 3rd floor, removal of (e) non conforming second stair at 2nd & 3rd floor. | $225,000 |
| Apr 21, 2010 | Completed final sign-off Nov 2011 | 3323 Washington St | interior remodel includes some demo in assoc. with moving closets, add elevator, moving kitchen & bath, replace some windows on side. remove skylights, relocate (e) 1 st floor deck & stairs. adjust location of water heater & furnace. no change to front.Details
interior remodel includes some demo in assoc. with moving closets, add elevator, moving kitchen & bath, replace some windows on side. remove skylights, relocate (e) 1 st floor deck & stairs. adjust location of water heater & furnace. no change to front. | $380,000 |
| Mar 17, 2010 | Completed final sign-off Oct 2010 | 2430 Broadway | minor alterations to master bathroom:remove/replace extg cabinets and plumbing fixtures with new. kitchen: remove and replace cabinets and fixtures with new. no changes to building envelope of structure. no new lighting. no walls relocation. no structural work.Details
minor alterations to master bathroom:remove/replace extg cabinets and plumbing fixtures with new. kitchen: remove and replace cabinets and fixtures with new. no changes to building envelope of structure. no new lighting. no walls relocation. no structural work. | $50,000 |
| Jan 23, 2009 | Expired or cancelled expired Jul 2010 | 2820 Vallejo St | relocate (e) powder room,new partitions for laundry,mech & storage @ basement; new powder rm,in-kind replace kitchen,extend (e)deck @ 1st floor; remodel 2 (e) baths, add 1 skylight,remove closet in m. bed @ 2nd floor; new int finishes,in-kind replace wood windows; replcae (e)stair w/new deck @ basmtDetails
relocate (e) powder room,new partitions for laundry,mech & storage @ basement; new powder rm,in-kind replace kitchen,extend (e)deck @ 1st floor; remodel 2 (e) baths, add 1 skylight,remove closet in m. bed @ 2nd floor; new int finishes,in-kind replace wood windows; replcae (e)stair w/new deck @ basmt | $200,000 |
| Apr 15, 2008 | Completed final sign-off Dec 2008 | 3240 Pacific Av | interior finishes, rewiring, plumbing alteration, cabinetry, window replacement in kind. opening of landing/ceiling @ top floor, reconfiguration of kitchen cabinetry/appliances, reconfigure 2 baths (level 1 and 2), reconfigure powder room, additon of 2 clerestory windowsDetails
interior finishes, rewiring, plumbing alteration, cabinetry, window replacement in kind. opening of landing/ceiling @ top floor, reconfiguration of kitchen cabinetry/appliances, reconfigure 2 baths (level 1 and 2), reconfigure powder room, additon of 2 clerestory windows | $250,000 |