Back to bathroom remodel contractors
Ggd Inc.
- Based in
- Sausalito
- On San Francisco permits
- Apr 2008 to Aug 2026
- Last 24 months
- 18 permits filed
193 permits since 2000: 134 completed, 17 in progress, 28 never finaled, 14 expired or cancelled.
Of the 28 never-finaled permits, 3 are 3 to 5 years old, 16 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 28 completed, 1 in progress, 8 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 541 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2025 | In progress issued Jul 2026 | 31 Presidio Tr | interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egressDetails
interior alteration of (e) sfh: selective demo & remodel of living spaces, kitchen & bathrooms throughout the residence. install new elevator, upgrade (e) foundation, exterior work to include: install new site drainage, replace (e) skylight with new. repair (e) roof & gutters, provide new egress | $1,500,000 |
| Aug 6, 2024 | Completed final sign-off Jun 2026 | 1767 Green St | 2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yardDetails
2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yard | $300,000 |
| Jun 3, 2022 | Completed final sign-off May 2026 | 2640 Jackson St | interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit.Details
interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit. | $1,200,000 |
| Jul 7, 2021 | Never finaled issued Jul 2021, no final | 3067 Sacramento St | remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural.Details
remove and replace one kitchen one bath in kind- remodel (no change to floor plan) non structural. | $60,000 |
| May 19, 2021 | Completed final sign-off Dec 2022 | 2739 Larkin St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Jun 24, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basementDetails
remodel (e) kitchen & (3) baths w/ (n) cabinets, plumbing fixtures & electrical to bring to code along w/ fl refinish & removal of asbestos hvac duct wrap. no structural over exterior work (all work inkind) no bathroom work in basement | $50,000 |
| Jan 2, 2020 | Completed final sign-off Sep 2022 | 3696 Clay St | all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior workDetails
all work in kind. remove and replace fixtures and finishes in two bathrooms. replair leak shower drains and plumbing. remove and replace kitchen finishes and fixtures specifically cabinets, plumbing and light fixtures. remove and replace hardwood flooring throughout. no structural/exterior work | $35,000 |
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 170 Palo Alto Av | interior remodel to include baths, selective structural upgrades, selective new windows, selective interior and exterior doors.Details
interior remodel to include baths, selective structural upgrades, selective new windows, selective interior and exterior doors. | $60,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top levelDetails
replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top level | $300,000 |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 170 Palo Alto Av | remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan)Details
remove & replace carpets with tile and hardwood. replace upper cabinets in kitchen. remove & replace tile in (3) bathrooms. change out interior doors. paint interior & ext of bldg. roof repair at 2 flat roofs. (no change of floor plan) | $25,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 2945 Scott St | remodel (2) bathrooms (90 sq. ft./50 sq. ft.), remove decorative woodwork ceiling @ bedroom (100 sq. ft.), remove nonfunctioning fireplace @ bedroom, not visible from outside, replace oak front door in-kind (w/sidelights, match (e) sticking, rails/stiles & profiles).Details
remodel (2) bathrooms (90 sq. ft./50 sq. ft.), remove decorative woodwork ceiling @ bedroom (100 sq. ft.), remove nonfunctioning fireplace @ bedroom, not visible from outside, replace oak front door in-kind (w/sidelights, match (e) sticking, rails/stiles & profiles). | $25,000 |
| Dec 14, 2018 | Completed final sign-off Jun 2021 | 2739 Broderick St | interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacementDetails
interior remodel including: removal of wall @ garage, convert (e) utility space to family room, remodel of (e) plight of stairs, add (n) skylight, heating system replacement, electrial and plumbing improvements, (n) cabinetry @ kitchen & baths, (n) residential elevator. window replacement | $800,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 3540 Jackson St | renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher naDetails
renovate all floors. addition of 1 bathroom, addition of 1 stair up to new roof deck. addition of nfpa13r sprinklers throughout the whole bld under sep permit. fenestration changes at rear and sides. no work visible from street. (n) retractable skylight. maher na | $900,000 |
| Aug 24, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher naDetails
remodel of basement including excavation to enlarge garage. remodel of 1st level kitchen & dning rm, remodel to bedrooms & baths at 2nd & 3rd level. add new elevator, remove old elevator. relocate 3 windows & replace all windows & doors with/ new in kind. maher na | $950,000 |
| Jul 26, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | add vestibule between garage and 1/f bedroom, move bathroom location and add gas fireplace. n/a ordinance #155-13Details
add vestibule between garage and 1/f bedroom, move bathroom location and add gas fireplace. n/a ordinance #155-13 | $3,500 |
| Jun 7, 2017 | Never finaled issued Sep 2017, no final | 2611 Divisadero St | excavation of (e) partial crawl space @ basement level for construction of new full basement level including full bathroom. replacement of (e) windows @ front facade with in kind windows. ** maher: exempted: approval from dph attached **Details
excavation of (e) partial crawl space @ basement level for construction of new full basement level including full bathroom. replacement of (e) windows @ front facade with in kind windows. ** maher: exempted: approval from dph attached ** | $287,600 |
| Jun 6, 2017 | Completed final sign-off Jun 2021 | 3060 Pacific Av | remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms.Details
remove/replace finishes @ basement, 2/f, 3/f; remove/replace kitchen cabinets & appliances at same location; remove finishes at two bathrooms. | $50,000 |
| May 30, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade.Details
horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade. | $500,000 |
| May 23, 2017 | Never finaled issued Jul 2018, no final | 2945 Scott St | remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight.Details
remodel garage floor. add bar, wine rom & replace stair. remodel kitchen at 1/fl. remodel powder rm. add new casework. remodel bedrooms & bath at 2/fl & add bathroom. replace some exterior windows and add skylight. | $150,000 |
| May 10, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | foundation replacement and lower floor slab and replace bath at lower level, add new bath as wellDetails
foundation replacement and lower floor slab and replace bath at lower level, add new bath as well | $65,000 |
| May 1, 2017 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system.Details
remove and replace finishes/cabinets at kitchen, 1st floor bath, garage shelving system. | $30,000 |
| Mar 3, 2017 | Expired or cancelled cancelled Jan 2026 | 2945 Scott St | remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement levelDetails
remodel garage floor, addition of bar & wind room, replace stair to garage floor. remodel kitchen and powder room at 1st floor. new casework throughout 1st floor. remodel and add bedrooms and baths @ 2nd floor. replace some exterior windows. legalize (e) bathroom and bedroom at basement level | $390,000 |
| Oct 11, 2016 | Completed final sign-off May 2022 | 2865 Vallejo St | vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a**Details
vertical & horizontal addition. renovation of existing master bathroom & construct a new penthouse with new rear balcony and new front roof deck. as well as a new bath at penthouse level. **maher n/a** | $135,000 |
| Jun 28, 2016 | Completed final sign-off Dec 2018 | 178 Cervantes Bl | rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13.Details
rear addition w/ deck & spiral stair to rear yard, roof addition w/ balcony, elevator addition, interior remodel including kitchen & bath. n/a for maher ordinance no.155-13. | $131,800 |
| Apr 21, 2016 | Completed final sign-off Aug 2017 | 2656 Filbert St | remove and replace finishes & fixtures in 3 bathrooms, paint interior, refinish hw floors, exisitng footing discovery. exploratory demo, confirm structural members, remove base, doors, new master closet cabinets. midspan garage ceiling, basement cellar rear of house. bed & bath ceiling at garage levDetails
remove and replace finishes & fixtures in 3 bathrooms, paint interior, refinish hw floors, exisitng footing discovery. exploratory demo, confirm structural members, remove base, doors, new master closet cabinets. midspan garage ceiling, basement cellar rear of house. bed & bath ceiling at garage lev | $50,000 |
| Jul 2, 2013 | Completed final sign-off Feb 2014 | 3098 Pacific Av | due to replacement of tile in master bath with stone required lowering the floor framing to accommodate it. opening in shearwall was revised so a new wall added to keep the shear integrityDetails
due to replacement of tile in master bath with stone required lowering the floor framing to accommodate it. opening in shearwall was revised so a new wall added to keep the shear integrity | $5,000 |
| May 24, 2013 | Completed final sign-off Dec 2013 | 3098 Pacific Av | remove and replace in kind bathroom finishes, refinishing of hardwood floors throughout, painting entire interior. no exterior work.Details
remove and replace in kind bathroom finishes, refinishing of hardwood floors throughout, painting entire interior. no exterior work. | $200,000 |
| Dec 21, 2012 | Completed final sign-off Apr 2015 | 181 Buena Vista East Av | removal of garage bump out & extend front porch over garage. new balcony @ rear 2nd flr & stair to rear yard. rear horizontal addition @ 1st level. infill (e) rear balcony @ kitchen. 115 sq. ft. horizontal addition @ 3rd level. master bath, new dormer @ roof @ rear facade. new windows @ rear facade.Details
removal of garage bump out & extend front porch over garage. new balcony @ rear 2nd flr & stair to rear yard. rear horizontal addition @ 1st level. infill (e) rear balcony @ kitchen. 115 sq. ft. horizontal addition @ 3rd level. master bath, new dormer @ roof @ rear facade. new windows @ rear facade. | $175,000 |
| Feb 6, 2012 | Completed final sign-off Sep 2012 | 2127 Broadway | interior finish remodel. remove & replace finishes in kind including hardwood floors, kitchen cabinets & fixtures, bathroom fixtures, paint. no change on walls and opening.Details
interior finish remodel. remove & replace finishes in kind including hardwood floors, kitchen cabinets & fixtures, bathroom fixtures, paint. no change on walls and opening. | $75,000 |
| Jan 26, 2012 | Completed final sign-off Oct 2012 | 2666 Broadway | no exterior work-interior remodel only, all bathrooms to have new finishes. kitchen to have new finishes, new power room on 3rd floor. relocate stair location at basement to 2nd floor level. revision appl. 201112050089.Details
no exterior work-interior remodel only, all bathrooms to have new finishes. kitchen to have new finishes, new power room on 3rd floor. relocate stair location at basement to 2nd floor level. revision appl. 201112050089. | $350,000 |
| Sep 10, 2010 | Completed final sign-off Mar 2012 | 2841 Divisadero St | interior remodel of bathrooms & kitchen, (n) curved stair @ study & dining on 2nd floor, reconfiguration of media rm on ground level into family room, replacement of (e) wood windows with new wood windows, new skylight on 3rd floor, removal of (e) non conforming second stair at 2nd & 3rd floor.Details
interior remodel of bathrooms & kitchen, (n) curved stair @ study & dining on 2nd floor, reconfiguration of media rm on ground level into family room, replacement of (e) wood windows with new wood windows, new skylight on 3rd floor, removal of (e) non conforming second stair at 2nd & 3rd floor. | $225,000 |
| May 20, 2010 | Expired or cancelled expired Apr 2013 | 2430 Broadway | interior bathroom/closet remodel. replace 2 e windows with 1 larger window at rear (additional glass area 22 sf) replacement of 2nd fl interior doors, replacement in kind of cabinets and appliances.Details
interior bathroom/closet remodel. replace 2 e windows with 1 larger window at rear (additional glass area 22 sf) replacement of 2nd fl interior doors, replacement in kind of cabinets and appliances. | $65,000 |
| Apr 21, 2010 | Completed final sign-off Nov 2011 | 3323 Washington St | interior remodel includes some demo in assoc. with moving closets, add elevator, moving kitchen & bath, replace some windows on side. remove skylights, relocate (e) 1 st floor deck & stairs. adjust location of water heater & furnace. no change to front.Details
interior remodel includes some demo in assoc. with moving closets, add elevator, moving kitchen & bath, replace some windows on side. remove skylights, relocate (e) 1 st floor deck & stairs. adjust location of water heater & furnace. no change to front. | $380,000 |
| Mar 17, 2010 | Completed final sign-off Oct 2010 | 2430 Broadway | minor alterations to master bathroom:remove/replace extg cabinets and plumbing fixtures with new. kitchen: remove and replace cabinets and fixtures with new. no changes to building envelope of structure. no new lighting. no walls relocation. no structural work.Details
minor alterations to master bathroom:remove/replace extg cabinets and plumbing fixtures with new. kitchen: remove and replace cabinets and fixtures with new. no changes to building envelope of structure. no new lighting. no walls relocation. no structural work. | $50,000 |
| Dec 17, 2009 | Completed final sign-off Jul 2010 | 2820 Vallejo St | revision to appl #200906059857 - change to (e) door window openings @ main floor incl (2) new bi-parting doros w/side lights, extension of deck to new doors, replacement of bathroom window @ top floor, change to lower deck stairs/railing.Details
revision to appl #200906059857 - change to (e) door window openings @ main floor incl (2) new bi-parting doros w/side lights, extension of deck to new doors, replacement of bathroom window @ top floor, change to lower deck stairs/railing. | $22,500 |
| Jun 5, 2009 | Completed final sign-off Jul 2010 | 2820 Vallejo St | revision to 200901230692. remove (e)interior stair and closing of floor. reconfiguration of non-structural partitions @ the basement for the laundry, bath, mech & storage area. addition of 2 closets @ m. bedrooms and a new door/window unit @ north basement wall. upgrade of structural shear elements.Details
revision to 200901230692. remove (e)interior stair and closing of floor. reconfiguration of non-structural partitions @ the basement for the laundry, bath, mech & storage area. addition of 2 closets @ m. bedrooms and a new door/window unit @ north basement wall. upgrade of structural shear elements. | $20,000 |
| May 1, 2009 | Completed final sign-off Sep 2010 | 2709 Larkin St | interior remodel on all floors. net addion of 1 1/2 baths to (e) 4 1/2 bath, 4 bedroom house. horizontal additon @ side - infill under (e) roofed structure for new interior stair, new stair to (e) garage, new door @ side addition, separate permit for rear addition pa# 2009/03/24/4770's'.Details
interior remodel on all floors. net addion of 1 1/2 baths to (e) 4 1/2 bath, 4 bedroom house. horizontal additon @ side - infill under (e) roofed structure for new interior stair, new stair to (e) garage, new door @ side addition, separate permit for rear addition pa# 2009/03/24/4770's'. | $350,000 |
| Jan 23, 2009 | Expired or cancelled expired Jul 2010 | 2820 Vallejo St | relocate (e) powder room,new partitions for laundry,mech & storage @ basement; new powder rm,in-kind replace kitchen,extend (e)deck @ 1st floor; remodel 2 (e) baths, add 1 skylight,remove closet in m. bed @ 2nd floor; new int finishes,in-kind replace wood windows; replcae (e)stair w/new deck @ basmtDetails
relocate (e) powder room,new partitions for laundry,mech & storage @ basement; new powder rm,in-kind replace kitchen,extend (e)deck @ 1st floor; remodel 2 (e) baths, add 1 skylight,remove closet in m. bed @ 2nd floor; new int finishes,in-kind replace wood windows; replcae (e)stair w/new deck @ basmt | $200,000 |
| Jun 2, 2008 | Never finaled issued Jun 2008, no final | 3230 Jackson St | remodel (e) exercise room & bath @ ground floor. renew interior finish in one room @ 4th floor. associated landscape improvements including new stair and terrace to replace (e) deck. no changes to exterior.Details
remodel (e) exercise room & bath @ ground floor. renew interior finish in one room @ 4th floor. associated landscape improvements including new stair and terrace to replace (e) deck. no changes to exterior. | $190,000 |
| Apr 15, 2008 | Completed final sign-off Dec 2008 | 3240 Pacific Av | interior finishes, rewiring, plumbing alteration, cabinetry, window replacement in kind. opening of landing/ceiling @ top floor, reconfiguration of kitchen cabinetry/appliances, reconfigure 2 baths (level 1 and 2), reconfigure powder room, additon of 2 clerestory windowsDetails
interior finishes, rewiring, plumbing alteration, cabinetry, window replacement in kind. opening of landing/ceiling @ top floor, reconfiguration of kitchen cabinetry/appliances, reconfigure 2 baths (level 1 and 2), reconfigure powder room, additon of 2 clerestory windows | $250,000 |