Block 0946, lot 008
2636 Union St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 5,773 sq ft
- Lot
- 5,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2023 | Completed final sign-off May 2023 | 2636 Union St | Ggd Inc. | front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way.Details
front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way. | $30,000 |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 2636 Union St | street space | ||
| Nov 27, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | Ggd Inc. | addition of dumbwaiter @ all levels. addition of glass & steel atrium @ 1st fl. alterations to rear facade windows. replace (e) roof over hot tub @ rear yard. selective interior remodel @ all levels w/ (n) finishes.Details
addition of dumbwaiter @ all levels. addition of glass & steel atrium @ 1st fl. alterations to rear facade windows. replace (e) roof over hot tub @ rear yard. selective interior remodel @ all levels w/ (n) finishes. | $450,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | Ggd Inc. | replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top levelDetails
replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top level | $300,000 |
| Apr 26, 2010 | Completed final sign-off Mar 2011 | 2636 Union St | Emerald Plbg & Fire Protection | installation of new fire sprinkler system for new home & 20ft. undderground piping.Details
installation of new fire sprinkler system for new home & 20ft. undderground piping. | $15,000 |
| Nov 12, 2009 | Completed final sign-off Nov 2010 | 2636 Union St | remove interiorDetails
remove interior | $15,000 | |
| Jun 30, 2009 | Completed final sign-off Aug 2010 | 2636 Union St | foundation replacement or strengthening of brick foundation to existing building.Details
foundation replacement or strengthening of brick foundation to existing building. | $90,000 | |
| Mar 13, 2009 | Completed final sign-off Feb 2011 | 2636 Union St | seismic upgrade, foundation replacement (under separate permit) and vertical and horizontal additionDetails
seismic upgrade, foundation replacement (under separate permit) and vertical and horizontal addition | $500,000 | |
| Jun 2, 2008 | Never finaled issued Jun 2008, no final | 2636 Union St | street space and sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ggd Inc. (3), Emerald Plbg & Fire Protection
- Architects
- Dave Sturm (2), Federico Engel
- Engineers
- David Strandberg, Jack Barcewski
- Authorized agents
- Kevin Dill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.