Block 5610A, lot 004
42 Prospect Ave
- City’s use
- Single Family Residential
- Built
- 1898
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,232 sq ft
- Lot
- 1,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 7, 2023 | Completed final sign-off Jun 2024 | 42 Prospect Av | Gil Construction & Assoc Inc. | replace (e) interior spiral stair case with new stairs at level 1, no deck work at this time.Details
replace (e) interior spiral stair case with new stairs at level 1, no deck work at this time. | $60,000 |
| Dec 13, 2013 | Completed final sign-off Feb 2014 | 42 Prospect Av | remove and replace broken/unlevel portion of concrete floor in garage.Details
remove and replace broken/unlevel portion of concrete floor in garage. | $6,500 | |
| Jun 14, 2013 | Never finaled issued Jun 2013, no final | 42 Prospect Av | street spaceDetails
street space | ||
| Jun 14, 2013 | Completed final sign-off Jul 2013 | 42 Prospect Av | Diviney Construction Inc | replace some decking boards & siding at front of property. less than 50%Details
replace some decking boards & siding at front of property. less than 50% | $500 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 42 Prospect Av | fix retaining wall on back side of property.Details
fix retaining wall on back side of property. | $5,000 | |
| Jun 29, 2012 | Completed final sign-off Jul 2012 | 42 Prospect Av | to obtain final inspection for work approved under app#201010213543. all work is completeDetails
to obtain final inspection for work approved under app#201010213543. all work is complete | ||
| Mar 13, 2012 | Completed final sign-off Jun 2012 | 42 Prospect Av | pre existing sink in basement utility room to be added to original scope of work for final sign off. revision to pa#201003188492Details
pre existing sink in basement utility room to be added to original scope of work for final sign off. revision to pa#201003188492 | ||
| Oct 21, 2010 | Completed final sign-off Jan 2013 | 42 Prospect Av | replace aluminum windows on back & side of house with vinyl windows, 3 sliding doors & 14 windows, all the same size, replace siding & replace railing ht. 42" min. on roof deck & decking which is currently redwood to be replaced with composite decking.Details
replace aluminum windows on back & side of house with vinyl windows, 3 sliding doors & 14 windows, all the same size, replace siding & replace railing ht. 42" min. on roof deck & decking which is currently redwood to be replaced with composite decking. | $20,000 | |
| Mar 18, 2010 | Completed final sign-off Jun 2012 | 42 Prospect Av | remodel (e) kitchen & bathroom at first floor, remove (e) spiral stair & repalce w/new wood stair. remove selected interior partitions & reconstruct per plan. remodel (e) bathroom at 2nd floor. repalce alum. window at rear w/new clad unit. no change to house front exterior.Details
remodel (e) kitchen & bathroom at first floor, remove (e) spiral stair & repalce w/new wood stair. remove selected interior partitions & reconstruct per plan. remodel (e) bathroom at 2nd floor. repalce alum. window at rear w/new clad unit. no change to house front exterior. | $50,000 | |
| Feb 3, 2010 | Never finaled issued Feb 2010, no final | 42 Prospect Av | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Diviney Construction Inc, Gil Construction & Assoc Inc.
- Architects
- Eta Architiect, Peter Chuck
- Engineers
- Donald David