C. Lawson Willard
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Lawson Willard Architect
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Jul 2026
105 permits since 2000 (architect on 101 permits, engineer on 3 permits, authorized agent-others on 1 permit): 64 completed, 9 in progress, 14 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Aug 2026 | 104 11th Av | revision to pa#: 202507301951. add (n)bath, bar/storage, and (n) multi purpose rooms at the garage level. new radiant heat system.Details
revision to pa#: 202507301951. add (n)bath, bar/storage, and (n) multi purpose rooms at the garage level. new radiant heat system. | $25,000 | |
| Jul 1, 2026 | In progress issued Jul 2026 | 632 El Camino Del Mar | Fma Builders | revision to bpa 202511250401. selective demo of existing exhaust vent pipe at vertical section in the chimney chase to replace vent pipe. new 4" ceramic insulation.Details
revision to bpa 202511250401. selective demo of existing exhaust vent pipe at vertical section in the chimney chase to replace vent pipe. new 4" ceramic insulation. | $1,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 104 11th Av | revision to pa# 202507301951. new concrete patio on grade at rear yard. revise deck stair design per new concrete patio.Details
revision to pa# 202507301951. new concrete patio on grade at rear yard. revise deck stair design per new concrete patio. | ||
| Nov 25, 2025 | In progress issued Dec 2025 | 632 El Camino Del Mar | Fma Builders | demo and replace exhaust pipe insulation.Details
demo and replace exhaust pipe insulation. | $12,000 |
| Aug 14, 2025 | In progress issued Nov 2025 | 104 11th Av | horizontal addition on all three floors. build a new foundation throughout and lower garage level 1'-0" replace all exterior doors and windows. interior remodel throughout. new 150 sqft rear deck.Details
horizontal addition on all three floors. build a new foundation throughout and lower garage level 1'-0" replace all exterior doors and windows. interior remodel throughout. new 150 sqft rear deck. | $190,000 | |
| Jul 11, 2025 | In progress issued Jul 2025 | 190 Ripley St | Peter Etges Gc | revision to pa # 2024-0517-2333 reduction in scope. remove cove ceiling on 2nd fl living room from scopeDetails
revision to pa # 2024-0517-2333 reduction in scope. remove cove ceiling on 2nd fl living room from scope | |
| Oct 21, 2024 | In progress filed Oct 2024, not yet issued | 815 Powell St | revision to pa# 202311090505: awning repair (new fabric).Details
revision to pa# 202311090505: awning repair (new fabric). | $800 | |
| May 16, 2024 | Expired or cancelled withdrawn Sep 2026 | 815 Powell St | revision to pa# 202311090505: remove mechanical (deffered) from scope onlyDetails
revision to pa# 202311090505: remove mechanical (deffered) from scope only | ||
| Feb 13, 2024 | Completed final sign-off Nov 2024 | 3527 Webster St | Keightley Builders Inc | new roof deck and skyligiht access hatch. for exclusive use on top unit. 3527 webster. partial removal of kitchen dining rm wall and removal of door.Details
new roof deck and skyligiht access hatch. for exclusive use on top unit. 3527 webster. partial removal of kitchen dining rm wall and removal of door. | $106,000 |
| Nov 9, 2023 | In progress issued Dec 2023 | 815 Powell St | Bach Construction, Inc., Buildrite Construction Corp | t.i. cua convert vacant cafe space to car rental retail space. powell entrance replaced in-kind w/ auto openers, 10 (e) garage stalls: 1 (e) car wash station to be used by sixtDetails
t.i. cua convert vacant cafe space to car rental retail space. powell entrance replaced in-kind w/ auto openers, 10 (e) garage stalls: 1 (e) car wash station to be used by sixt | $275,000 |
| Jul 6, 2023 | Never finaled filed Jul 2023, never issued | 2935 Fillmore St | response to complaint# 2022-0693enf.existing 4th fl unit to be legalized under rh-3 dwelling density allowances.roof deck/52 sf)to be added to 4th fl unit.permit application split under 2022-012509prjDetails
response to complaint# 2022-0693enf.existing 4th fl unit to be legalized under rh-3 dwelling density allowances.roof deck/52 sf)to be added to 4th fl unit.permit application split under 2022-012509prj | $150,000 | |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 1 Mission St | Terra Nova Industries | revision to pa#202201206308. remove from proposed scope (1) hand sink.Details
revision to pa#202201206308. remove from proposed scope (1) hand sink. | |
| May 31, 2023 | Completed final sign-off Sep 2023 | 1650 Owens St | Bach Construction, Inc. | 2/f: t.i., remove (e) open office(229) & furniture, replace (e) carpet w/vct to match adj finish, add new lab(229) install new lay-in ceiling, mobile lab tables, vacuum, lab air, electrical dropsDetails
2/f: t.i., remove (e) open office(229) & furniture, replace (e) carpet w/vct to match adj finish, add new lab(229) install new lay-in ceiling, mobile lab tables, vacuum, lab air, electrical drops | $225,000 |
| Dec 13, 2022 | In progress issued Nov 2023 | 2320 Broadway | Bryan Michelsen Construction | interior remodel on third floor.Details
interior remodel on third floor. | $75,000 |
| Dec 9, 2022 | Completed final sign-off Sep 2026 | 2322 Broadway | Bryan Michelsen Construction | infill & interior alteration on 4th & 3rd floor impacting upper unit.Details
infill & interior alteration on 4th & 3rd floor impacting upper unit. | $175,000 |
| Dec 9, 2022 | Completed final sign-off Mar 2023 | 1650 Owens St | Bach Construction, Inc. | 2nd flr t.i conversion of 2 offices to (b) lab.Details
2nd flr t.i conversion of 2 offices to (b) lab. | $125,000 |
| Sep 21, 2022 | Never finaled issued Sep 2022, no final | 1 Mission St | Terra Nova Industries | revision to pa 2022-0120-6308 keep (e) basement vanities in restrooms; add signage to direct patrons to ada accessible entrance; add sets of power door openers t0 (e) ada accessible entranceDetails
revision to pa 2022-0120-6308 keep (e) basement vanities in restrooms; add signage to direct patrons to ada accessible entrance; add sets of power door openers t0 (e) ada accessible entrance | |
| Jul 5, 2022 | Completed final sign-off Aug 2022 | 564 Bush St | Bach Construction, Inc. | revision to 201912119213/r1: modifiy location of accessible counter top at new bar. add sink and counter behind bar.Details
revision to 201912119213/r1: modifiy location of accessible counter top at new bar. add sink and counter behind bar. | $5,000 |
| Jun 22, 2022 | Expired or cancelled cancelled Jan 2026 | 141 Industrial St | High Ground Construction | upgrade 2 (e) ground floor entrances to be ada compliant. demo (e) walkway & replace with (n) ramp & stairs. add an acc parking space. install (n) auto door opener & door. add (n) acc parking & van parking at east entrance. add acc door at (e) entrance. (n) fence.Details
upgrade 2 (e) ground floor entrances to be ada compliant. demo (e) walkway & replace with (n) ramp & stairs. add an acc parking space. install (n) auto door opener & door. add (n) acc parking & van parking at east entrance. add acc door at (e) entrance. (n) fence. | $50,000 |
| Mar 24, 2022 | Never finaled issued Mar 2022, no final | 566 Bush St | Bach Construction, Inc. | revision to 2020 0819 2089. for gate revision. omit center strike post at rectory gate to maintain clearance for pall bearers carrying caskets into the church. add can bolt on one leaf of rectory gate cane bolt replaces post.Details
revision to 2020 0819 2089. for gate revision. omit center strike post at rectory gate to maintain clearance for pall bearers carrying caskets into the church. add can bolt on one leaf of rectory gate cane bolt replaces post. | $800 |
| Sep 27, 2021 | Expired or cancelled withdrawn Apr 2022 | 325 Mason St | Bach Construction, Inc. | renovate (e) commercial space: new flooring, wall finishes, drop ceiling and lighting. install new service desks and install new partition to create employee breakroom.Details
renovate (e) commercial space: new flooring, wall finishes, drop ceiling and lighting. install new service desks and install new partition to create employee breakroom. | $50,000 |
| May 27, 2021 | Completed final sign-off Mar 2022 | 2501 Ocean Av | Bach Construction, Inc., Diviney Construction Inc | t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred.Details
t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred. | $868,803 |
| May 12, 2021 | Expired or cancelled withdrawn May 2021 | 1973 Broadway | construct new 4-story, single-family building with 1 basementDetails
construct new 4-story, single-family building with 1 basement | $45,000 | |
| Apr 14, 2021 | Expired or cancelled expired Apr 2025 | 55 Teresita Bl | Lindquist Custom Construction Inc | convert existing office to guest bedroom. add new bathroom at existing office.Details
convert existing office to guest bedroom. add new bathroom at existing office. | $20,000 |
| Mar 22, 2021 | Never finaled issued Jun 2021, no final | 2381 Bush St | new garage door and curb cut. existing street tree to remain.Details
new garage door and curb cut. existing street tree to remain. | $10,000 | |
| Mar 4, 2021 | Completed final sign-off Jun 2022 | 141 Industrial St | High Ground Construction | add a new limited use, limited application elevator at building interior. no exterior work. electrical and mechanical under seperate permit.Details
add a new limited use, limited application elevator at building interior. no exterior work. electrical and mechanical under seperate permit. | $140,000 |
| Nov 5, 2020 | Completed final sign-off Mar 2021 | 1650 Owens St | Bach Construction, Inc. | interior renovation includes new partition dividing existing room and existing hall. combine (e) rooms #506 & #507. demolish partition separating (e) rooms #508 & #509a. no structural and no exterior workDetails
interior renovation includes new partition dividing existing room and existing hall. combine (e) rooms #506 & #507. demolish partition separating (e) rooms #508 & #509a. no structural and no exterior work | $35,000 |
| Aug 19, 2020 | Completed final sign-off Jun 2022 | 566 Bush St | Bach Construction, Inc. | install metal security gate on the south property line, adjacent to the sidewalk.Details
install metal security gate on the south property line, adjacent to the sidewalk. | $50,000 |
| Nov 5, 2019 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792Details
revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792 | $1,000 |
| Jul 3, 2019 | Completed final sign-off Mar 2020 | 473 Eucalyptus Dr | Build Group Inc. | altered site permit to appl #201901301663. enlargement of existing school facility. addition inludes mulipurpose room. storage and accessible restrooms.Details
altered site permit to appl #201901301663. enlargement of existing school facility. addition inludes mulipurpose room. storage and accessible restrooms. | $100,000 |
| Jun 26, 2019 | Completed final sign-off Jul 2020 | 3553 20th St | High Ground Construction | to legalize rear addittion adjacent to rear stairs; replace foundation at east wall at added laundry room. to conform to cc-7914 to supplement pa201903044274.Details
to legalize rear addittion adjacent to rear stairs; replace foundation at east wall at added laundry room. to conform to cc-7914 to supplement pa201903044274. | $5,000 |
| Apr 11, 2019 | Completed final sign-off Aug 2021 | 151 24th Av | Rwr Construction Inc, J Bradford Construction | elevator connecting garage & 1st floors onlyDetails
elevator connecting garage & 1st floors only | $70,000 |
| Feb 11, 2019 | Completed final sign-off Aug 2021 | 151 24th Av | J Bradford Construction | revision to 201401236946/201803284788 interior redesign of kitchen, family room and master suite. new bath on 2nd fl relocate power roo. replacement of windows in kind (aluminum-clad wood) interiorDetails
revision to 201401236946/201803284788 interior redesign of kitchen, family room and master suite. new bath on 2nd fl relocate power roo. replacement of windows in kind (aluminum-clad wood) interior | $10,000 |
| Jan 30, 2019 | Completed final sign-off Mar 2020 | 473 Eucalyptus Dr | Build Group Inc. | horizontal addition. 1/f for new preschool on (e) school campus. it will extend the (e) facility. addition will include a multi-purpose room, restrooms for students. storage area accessible restrooms to be provided.Details
horizontal addition. 1/f for new preschool on (e) school campus. it will extend the (e) facility. addition will include a multi-purpose room, restrooms for students. storage area accessible restrooms to be provided. | $125,000 |
| Dec 21, 2018 | Completed final sign-off Jun 2022 | 632 El Camino Del Mar | Fma Builders | replace extg wood windows in kind, nw exterior stucco to match extg, extend extg hallway at basement. remove extg window on e elevation at basement, add single door & pair of door at basement, replace garage door & remove garage wndw. remove e gas appliances @ family room, 3 nw windows @ w elevationDetails
replace extg wood windows in kind, nw exterior stucco to match extg, extend extg hallway at basement. remove extg window on e elevation at basement, add single door & pair of door at basement, replace garage door & remove garage wndw. remove e gas appliances @ family room, 3 nw windows @ w elevation | $250,000 |
| Jun 6, 2018 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floorDetails
demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floor | $30,000 |
| Mar 19, 2018 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions.Details
revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions. | $5,000 |
| Mar 1, 2018 | Completed final sign-off Feb 2023 | 1973 Broadway | Eastwood Development Incorporated | add vert. wood siding to approved 4th flr north elev; new front entry door; new guardrail for (e) deck above garage; replace garage door; add stucco to garage walls; recess 2nd and 3rd flr windows at front facade, no change to location or size; remove window on 3rd flr, east elev.struct work @garageDetails
add vert. wood siding to approved 4th flr north elev; new front entry door; new guardrail for (e) deck above garage; replace garage door; add stucco to garage walls; recess 2nd and 3rd flr windows at front facade, no change to location or size; remove window on 3rd flr, east elev.struct work @garage | $2,000 |
| Feb 6, 2018 | Never finaled issued Jun 2020, no final | 1973 Broadway | Eastwood Development Incorporated | infill sw & nw corners on 4th floor. infill east lightwell on 3rd & 4th floors.Details
infill sw & nw corners on 4th floor. infill east lightwell on 3rd & 4th floors. | $30,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 27 Presidio Tr | Ggd Inc. | alteration & horizontal expansion to (e) single family home. expand (e) garage 93 sf & expand deck 95 sf. remove hip roof off master bdrm. remove master bdrm deck.Details
alteration & horizontal expansion to (e) single family home. expand (e) garage 93 sf & expand deck 95 sf. remove hip roof off master bdrm. remove master bdrm deck. | $65,000 |
| Oct 18, 2017 | Expired or cancelled expired Apr 2026 | 35 Belgrave Av | comply with nov #201766103, 133(a)(1) legalize wall in east side yard setback. the east wall on the upper level was demolished in excess of the approved permit #201312275170Details
comply with nov #201766103, 133(a)(1) legalize wall in east side yard setback. the east wall on the upper level was demolished in excess of the approved permit #201312275170 | ||
| Oct 13, 2017 | Completed final sign-off Feb 2018 | 2831 Baker St | Achill Beg Construction Inc | extg 3 bedrooms, convert extg library on 2nd floor to a bedroom for total of 4 bedrooms. do not build closet. work only at 2nd floor - room designation changeDetails
extg 3 bedrooms, convert extg library on 2nd floor to a bedroom for total of 4 bedrooms. do not build closet. work only at 2nd floor - room designation change | $1,000 |
| May 30, 2017 | Completed final sign-off Aug 2019 | 27 Presidio Tr | Ggd Inc. | horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade.Details
horizontal expansion, including new dormers, reconfiguration of floor plans. new fixtures, finishes kitchen, bathroom, garage, porch, stucco. remove 2 story structure in rear yard, excavation of basement for new habitable space, new light well & window in front facade. | $500,000 |
| Oct 14, 2016 | Expired or cancelled withdrawn Mar 2017 | 35 Belgrave Av | revision to 201312275170 scope to add concrete slab and walls at garage levelDetails
revision to 201312275170 scope to add concrete slab and walls at garage level | $10,000 | |
| Jul 28, 2016 | Completed final sign-off Apr 2018 | 138 16th Av | Jeff King And Company Inc | second & third floor lightwell infill @ south property lineDetails
second & third floor lightwell infill @ south property line | $10,000 |
| May 11, 2016 | Completed final sign-off Mar 2017 | 145 Mallorca Wy | Cook Construction | demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maherDetails
demolition and re-configuration of interior walls @ all three floors. new bathroom, kitchen fixtures & finishes to replace extg. new structural work at 1st and 2nd floors(shear), new doors and windows at rear. n/a for maher | $100,000 |
| Feb 19, 2016 | Never finaled issued Oct 2016, no final | 145 Mallorca Wy | Cook Construction | replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155Details
replace (e) third floor rear exterior deck w/ (n) horizontal extension/construction of third flr bathroom & closet. (n) skyline @ roof above proposed bathroom. interior scope of work under permit app # 2016-0511-7155 | $30,000 |
| Jan 21, 2016 | Completed final sign-off May 2016 | 500 Masonic Av | High Ground Construction | installation of 1 hr rated glass block at south propetry line wall. n/a ordinance #155-13Details
installation of 1 hr rated glass block at south propetry line wall. n/a ordinance #155-13 | $10,000 |
| Aug 5, 2015 | Expired or cancelled cancelled Feb 2020 | 60 27th Av | Pegasus Builders | excavation of (e) driveway @ rear (east) property to easement level. construction of new garage extension toward rear of property. construction of new deck above proposed garage, new patio. new bathroom @ basement. new exercise room to replace (e) garage.Details
excavation of (e) driveway @ rear (east) property to easement level. construction of new garage extension toward rear of property. construction of new deck above proposed garage, new patio. new bathroom @ basement. new exercise room to replace (e) garage. | $125,000 |
| Apr 15, 2015 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovationDetails
vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovation | $500,000 |
| Nov 20, 2014 | Completed final sign-off Mar 2015 | 4000 24th St | High Ground Construction | accessible upgrade to front entrance. accessible seating at bar, accessible frestroom finishes, fixtures. replacement of e lighting fixtures with new energy efficient lightingDetails
accessible upgrade to front entrance. accessible seating at bar, accessible frestroom finishes, fixtures. replacement of e lighting fixtures with new energy efficient lighting | $60,000 |
| Oct 1, 2014 | Completed final sign-off Mar 2016 | 2240 Broderick St | Cook Construction | structural work at 1st floor . new slab at garage and 1st floor habitable space. foundation bracing.(structural upgrade)Details
structural work at 1st floor . new slab at garage and 1st floor habitable space. foundation bracing.(structural upgrade) | $20,000 |
| Sep 27, 2012 | Completed final sign-off Mar 2015 | 60 27th Av | Pegasus Building/Castle Construction | comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement levelDetails
comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement level | $120,000 |
| Sep 11, 2012 | Completed final sign-off Apr 2013 | 60 27th Av | Pegasus Building/Castle Construction | demo e roof for construction of new dormer, new rail at attic dormer. structural upgrade at living rm opening and new momemt frame at rear under master bedDetails
demo e roof for construction of new dormer, new rail at attic dormer. structural upgrade at living rm opening and new momemt frame at rear under master bed | $30,000 |
| Jul 19, 2012 | Never finaled issued May 2013, no final | 2472 California St | Kor Builders | demolition of exterior walls @ northeast portion of building. new construction of exterior walls & horizontal infill. new construction of roof deck & stair penthouse. addition of fire rated windows @ east property line.Details
demolition of exterior walls @ northeast portion of building. new construction of exterior walls & horizontal infill. new construction of roof deck & stair penthouse. addition of fire rated windows @ east property line. | $80,000 |
| Jul 19, 2012 | Completed final sign-off Mar 2015 | 62 Vicksburg St | re-configuration of interior walls @ 2nd floor. new construction of bedroom. removal of (e) roof & replacement of new roof & skylights. installation of new windows @ 2nd floor south.Details
re-configuration of interior walls @ 2nd floor. new construction of bedroom. removal of (e) roof & replacement of new roof & skylights. installation of new windows @ 2nd floor south. | $30,000 | |
| Jul 10, 2012 | Never finaled issued Aug 2012, no final | 605 Kearny St | change of use from r3 (1 unit) to r3 (2 units). (ref. 07/02/2012 email from planning dept.) proposed kitchen at third floor. no exterior work to be done. revision to pa# 2002/02/11/8951.Details
change of use from r3 (1 unit) to r3 (2 units). (ref. 07/02/2012 email from planning dept.) proposed kitchen at third floor. no exterior work to be done. revision to pa# 2002/02/11/8951. | $11,000 | |
| Feb 23, 2012 | Expired or cancelled expired Jul 2018 | 238 Eureka St | interior demolition & reconfiguration of walls. rear extension @ garage (subgrade) for 2 car parking, 1st floor & 2nd floor. vertical expension @ new 3rd floor. construction of rear exterior decks @ 2nd & 3rd floor. new front deck @ 3rd floor.Details
interior demolition & reconfiguration of walls. rear extension @ garage (subgrade) for 2 car parking, 1st floor & 2nd floor. vertical expension @ new 3rd floor. construction of rear exterior decks @ 2nd & 3rd floor. new front deck @ 3rd floor. | $300,100 | |
| Nov 18, 2011 | Completed final sign-off Jun 2013 | 605 Kearny St | Housing Construction Inc. | revision to pa# 2011/02/11/8951. construction of bathroom @ mezzanine. bar sink @ 2nd floor & 3rd floor.Details
revision to pa# 2011/02/11/8951. construction of bathroom @ mezzanine. bar sink @ 2nd floor & 3rd floor. | $8,000 |
| Oct 18, 2011 | Never finaled issued Nov 2011, no final | 3355 Pacific Av | 10/18/2011: boa#11-029 date 08/30/2011 ref: appl#2010/06/28/5457-s.Details
10/18/2011: boa#11-029 date 08/30/2011 ref: appl#2010/06/28/5457-s. | ||
| Sep 16, 2011 | Never finaled issued May 2012, no final | 2530 Sacramento St | renovate & expand existing structure, expand horizontally, add ground floor level, and do a unit substitution from 1st floor to basement.Details
renovate & expand existing structure, expand horizontally, add ground floor level, and do a unit substitution from 1st floor to basement. | $600,000 | |
| Mar 15, 2011 | Completed final sign-off Jun 2011 | 1994 Jackson St | Ashbury Gen Constructing & Eng | to comply with nov# 201072576 , dated 10/19/10 to remove roof deck. no other work.Details
to comply with nov# 201072576 , dated 10/19/10 to remove roof deck. no other work. | $3,000 |
| Jun 16, 2010 | Completed final sign-off Feb 2012 | 387 Tehama St | William Gregory Clause | reconfigure 3rd fl walls as tenant improvement. residential unit alteration. construction of mezzine @ rear of live/work space. life safety under separate permit.Details
reconfigure 3rd fl walls as tenant improvement. residential unit alteration. construction of mezzine @ rear of live/work space. life safety under separate permit. | $200,000 |
| May 13, 2010 | Never finaled issued Jul 2010, no final | 3355 Pacific Av | Fma Builders | partial light well infill along east property line and enclose existing roof deck at 3rd fl.Details
partial light well infill along east property line and enclose existing roof deck at 3rd fl. | $73,500 |
| Mar 18, 2010 | Never finaled issued Mar 2010, no final | 3355 Pacific Av | Fma Builders | all work in exterior rear yard only, demo (e) retaining walls & construct (n) 3 tiered yard. gazebo & lighting under separate permit.Details
all work in exterior rear yard only, demo (e) retaining walls & construct (n) 3 tiered yard. gazebo & lighting under separate permit. | $60,000 |
| Oct 30, 2009 | Completed final sign-off Nov 2010 | 3223 Gough St | Jim Hughes Construction Co, J L N Construction | extend 3rd floor existing deck, enclose larger area by installing new sunroom (pre-fab) add structural bracing to existing stair towerDetails
extend 3rd floor existing deck, enclose larger area by installing new sunroom (pre-fab) add structural bracing to existing stair tower | $50,000 |
| Sep 25, 2009 | Never finaled issued Nov 2009, no final | 3355 Pacific Av | Fma Builders | renovation of single family home including voluntary structural upgrade demo & (n) construction on all (3) flrs.; removal of rear fire escape, (n) lowered slab & (n) lever patio on first flr. rear. no change to fron or side facades, (n) windows at rear. no expansion to bldg. envelope.Details
renovation of single family home including voluntary structural upgrade demo & (n) construction on all (3) flrs.; removal of rear fire escape, (n) lowered slab & (n) lever patio on first flr. rear. no change to fron or side facades, (n) windows at rear. no expansion to bldg. envelope. | $1,500,000 |
| Jun 22, 2009 | Expired or cancelled expired Nov 2013 | 605 Market St | 14 & 15 fls - tenant improvement: demo of walls for new constructio of wall system, demo o int lighting system, new lighting, necessary egress lighting, new millwork, floor and wall finishes, new layout and fixtures of e 14th wc to be ada compliant and add grab bars to e 15th floor wcDetails
14 & 15 fls - tenant improvement: demo of walls for new constructio of wall system, demo o int lighting system, new lighting, necessary egress lighting, new millwork, floor and wall finishes, new layout and fixtures of e 14th wc to be ada compliant and add grab bars to e 15th floor wc | $70,000 | |
| Jan 29, 2009 | Completed final sign-off Feb 2009 | 3153 Pacific Av | renew pa# 2007/04/04/8019 to obtain final inspection. all work has been completed.Details
renew pa# 2007/04/04/8019 to obtain final inspection. all work has been completed. | ||
| Jan 27, 2009 | Completed final sign-off May 2009 | 3153 Pacific Av | structural revision to appli. 200804018529. (n) construction of retaining wall & (n) concrete foundation to support wall @ property line in rear yard.Details
structural revision to appli. 200804018529. (n) construction of retaining wall & (n) concrete foundation to support wall @ property line in rear yard. | $5,000 | |
| Dec 22, 2008 | Completed final sign-off Oct 2010 | 2949 Pacific Av | demolition of interior walls on 1st fl. structural work to be performed on 1st fl. new construction of interior walls @ 1/f, structural work @ foundation (lower level) for shear wall upgrade. life safety under seperate permit.Details
demolition of interior walls on 1st fl. structural work to be performed on 1st fl. new construction of interior walls @ 1/f, structural work @ foundation (lower level) for shear wall upgrade. life safety under seperate permit. | $80,000 | |
| Sep 12, 2008 | Completed final sign-off Apr 2009 | 1994 Jackson St | kitchen & bathroom remodel-enlarging of (e) opening for new sliding/pocket door. interior work onlyDetails
kitchen & bathroom remodel-enlarging of (e) opening for new sliding/pocket door. interior work only | $30,000 | |
| Jun 19, 2008 | Completed final sign-off Oct 2008 | 2813 Buchanan St | voluntary structural upgrade of e columns and walls at foundation, new insulation and gypsum at walls and ceiling, new insulation at wine cellar, (demo e walls for new walls). voluntary str. upgrade of rear deck walls.Details
voluntary structural upgrade of e columns and walls at foundation, new insulation and gypsum at walls and ceiling, new insulation at wine cellar, (demo e walls for new walls). voluntary str. upgrade of rear deck walls. | $25,000 | |
| May 22, 2008 | Completed final sign-off Sep 2008 | 2155 Turk Bl | (n) construction of deck & stairs to grade level from basement to replace (e) deck in kind. (n) construction of stairs from 1st floor to grade level to replace (e) stairs in kind. all resulting from exploratory demo.Details
(n) construction of deck & stairs to grade level from basement to replace (e) deck in kind. (n) construction of stairs from 1st floor to grade level to replace (e) stairs in kind. all resulting from exploratory demo. | $20,000 | |
| Apr 7, 2008 | Never finaled issued Jun 2009, no final | 2538 Sacramento St | Alex Builder Inc | interior alterations, relocate unit to basement level. new garage. horiz additon at 1st and 2nd floors. bsment: studio, cellar, 2 car garage, storage. 1st fl: kitchen,lvg rm, din rm, patio. 2nd fl: 4 bedrooms, 3 baths, deck, office. roof and roof deckDetails
interior alterations, relocate unit to basement level. new garage. horiz additon at 1st and 2nd floors. bsment: studio, cellar, 2 car garage, storage. 1st fl: kitchen,lvg rm, din rm, patio. 2nd fl: 4 bedrooms, 3 baths, deck, office. roof and roof deck | $230,000 |
| Apr 4, 2008 | Completed final sign-off Sep 2008 | 2155 Turk Bl | exploratory demolition of rear exterior window flashing stucco to assess water damage to (e) windows flashing and to establish scope of work for building permit.Details
exploratory demolition of rear exterior window flashing stucco to assess water damage to (e) windows flashing and to establish scope of work for building permit. | $3,000 | |
| Feb 8, 2008 | Completed final sign-off May 2008 | 2326 California St | modification of (e) fire escape (rear) on second & third floors, horizontal addition of second floor deck - exterior, (n) construction of wood stair from deck to (e) rear yard grade level.Details
modification of (e) fire escape (rear) on second & third floors, horizontal addition of second floor deck - exterior, (n) construction of wood stair from deck to (e) rear yard grade level. | $10,000 | |
| Jan 10, 2008 | Completed final sign-off Mar 2009 | 58 Rossi Av | (n) tiles & fixtures in 1st. floor bath, expand master bedroom & closets. horizontal expansion of 2nd fl. with 2 (n) bedrooms and 1 (n) bathroom. rear deck addition on 2nd floor.Details
(n) tiles & fixtures in 1st. floor bath, expand master bedroom & closets. horizontal expansion of 2nd fl. with 2 (n) bedrooms and 1 (n) bathroom. rear deck addition on 2nd floor. | $130,000 | |
| Dec 3, 2007 | Completed final sign-off Feb 2009 | 3037 Octavia St | demolition of third floor exteriors walls & roof. demolition of (e) deck and exterior deck walls. (n) construction of exterior walls and roof for bedroom (n) construction of deck and roofing above 2nd floor.Details
demolition of third floor exteriors walls & roof. demolition of (e) deck and exterior deck walls. (n) construction of exterior walls and roof for bedroom (n) construction of deck and roofing above 2nd floor. | $25,000 | |
| Oct 4, 2007 | Completed final sign-off Oct 2010 | 2165 Hayes St | S F Garage Company Inc. | install new garage as per plans; interior remodel as shown on plans- sprinkler garage per nfpa 13, separte permitDetails
install new garage as per plans; interior remodel as shown on plans- sprinkler garage per nfpa 13, separte permit | $200,000 |
| Mar 8, 2007 | Expired or cancelled expired May 2008 | 1820 Filbert St | boa #06-197 dated 2/28/2007 for appl#200505263570Details
boa #06-197 dated 2/28/2007 for appl#200505263570 | ||
| Mar 2, 2007 | Expired or cancelled expired Jan 2010 | 3153 Pacific Av | horizontal addition of kitchen at 1st floor and horizontal additon on 2nd and 3rd floor over carpark area.Details
horizontal addition of kitchen at 1st floor and horizontal additon on 2nd and 3rd floor over carpark area. | $145,000 | |
| Feb 20, 2007 | Completed final sign-off Jul 2007 | 2320 Broadway | Aidan Collins & Sons Inc | remodel (e) bathroom, electrical, plumbing, dry wall repair, tile work, shower pan. remodel of non load bearing walls. re-face (e) 2 fireplaces with new stone. replace mantels, pointing of fire brick.Details
remodel (e) bathroom, electrical, plumbing, dry wall repair, tile work, shower pan. remodel of non load bearing walls. re-face (e) 2 fireplaces with new stone. replace mantels, pointing of fire brick. | $93,000 |
| Oct 4, 2006 | Completed final sign-off Mar 2007 | 2955 Webster St | interior demo of (e) wall between kitchen & washrooms. exterior repair of stair / to be replace with new concrete stair in rear yard. interior millwork of new cabinets. new counters & built-in appliances.Details
interior demo of (e) wall between kitchen & washrooms. exterior repair of stair / to be replace with new concrete stair in rear yard. interior millwork of new cabinets. new counters & built-in appliances. | $18,000 | |
| Aug 30, 2006 | Completed final sign-off Dec 2006 | 1705 Buchanan St | new ownersip, removeal of interior nonstructural wall, new grab bar @ men's restroom & 2 new hcs sink faycet, ubteruir akteratuib abd renivak if bib structural wall, removal of raised floor. revision of approved building permit 200607126371Details
new ownersip, removeal of interior nonstructural wall, new grab bar @ men's restroom & 2 new hcs sink faycet, ubteruir akteratuib abd renivak if bib structural wall, removal of raised floor. revision of approved building permit 200607126371 | $3,500 | |
| Jun 21, 2006 | Expired or cancelled cancelled Apr 2007 | 3037 Octavia St | deck renovation on 3rd floor. infill(e) lightwell.Details
deck renovation on 3rd floor. infill(e) lightwell. | $7,500 | |
| Jun 19, 2006 | Completed final sign-off Feb 2008 | 3153 Pacific Av | interior kitchen and dining remodel revision to app #200605302703/in fill kitchen under extg room under bay window/new powder room under extg roomDetails
interior kitchen and dining remodel revision to app #200605302703/in fill kitchen under extg room under bay window/new powder room under extg room | $15,000 | |
| Feb 28, 2006 | Expired or cancelled expired May 2022 | 173 Jordan Av | bathroom, office & guest room renovation removing non-bearing walls, flourescent lightingDetails
bathroom, office & guest room renovation removing non-bearing walls, flourescent lighting | $12,000 | |
| Nov 22, 2005 | Expired or cancelled expired May 2008 | 1822 Filbert St | voluntary structural upgradeDetails
voluntary structural upgrade | $87,000 | |
| Oct 17, 2005 | Expired or cancelled expired Oct 2006 | 246 01st St | addendum to applicatio 200502225916 add framing plan for existing mezzanine levelfor voluntary upgradeDetails
addendum to applicatio 200502225916 add framing plan for existing mezzanine levelfor voluntary upgrade | $8,000 | |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 1520 Fillmore St | adding 7 tables & 27 seats to serve cold food. adding a wood screen wall. comply nov 200450008-bid-insp.Details
adding 7 tables & 27 seats to serve cold food. adding a wood screen wall. comply nov 200450008-bid-insp. | $2,000 | |
| May 5, 2005 | Completed final sign-off Feb 2006 | 1701 20th Av | interior kitchen, bath, bedroom remodel, convert (e) garage space into bedroom, office, bath & launDetails
interior kitchen, bath, bedroom remodel, convert (e) garage space into bedroom, office, bath & laun | $180,000 | |
| Apr 18, 2005 | Completed final sign-off May 2005 | 600 Texas St | violation correction on ext. deck/stair to comply w/nov 200454669 permit for (n)stair in rear yardDetails
violation correction on ext. deck/stair to comply w/nov 200454669 permit for (n)stair in rear yard | $3,500 | |
| Apr 7, 2005 | Completed final sign-off Apr 2005 | 1705 Buchanan St | revision to app #200502165595 to remove requirements for life safty fire alarm permit by terry smithDetails
revision to app #200502165595 to remove requirements for life safty fire alarm permit by terry smith | ||
| Mar 29, 2005 | Expired or cancelled expired Oct 2006 | 246 01st St | oti-1 1st/fl-el,me, ls,sp.Details
oti-1 1st/fl-el,me, ls,sp. | $100,000 | |
| Mar 22, 2005 | Completed final sign-off Apr 2005 | 1705 Buchanan St | change (e) boots to office & storage use on "mezz: floor of (e)restaurant. revision to pa#Details
change (e) boots to office & storage use on "mezz: floor of (e)restaurant. revision to pa# | ||
| Mar 15, 2005 | Completed final sign-off May 2006 | 4052 25th St | expand (e) garage, convert (e) storage into habitable space. construct new stairs to connectDetails
expand (e) garage, convert (e) storage into habitable space. construct new stairs to connect | $100,000 | |
| Feb 22, 2005 | Expired or cancelled expired Oct 2006 | 246 01st St | oti-1, 1st floor, el, me, ls, sp.Details
oti-1, 1st floor, el, me, ls, sp. | $76,800 | |
| Feb 16, 2005 | Completed final sign-off Apr 2005 | 1705 Buchanan St | tenant improvement add two v.i.p. booth on 2nd story 20% h.c. upgrades m.e.p. under separate permitDetails
tenant improvement add two v.i.p. booth on 2nd story 20% h.c. upgrades m.e.p. under separate permit | $11,300 | |
| Jan 11, 2005 | Completed final sign-off Sep 2005 | 120 Retiro Wy | interior remodel/kchn/bth/structural framingDetails
interior remodel/kchn/bth/structural framing | $8,540 |