Block 0226, lot 007
605 Kearny St
- City’s use
- Commercial Retail
- Built
- 1908
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 688 sq ft
- Lot
- 689 sq ft
- Zoning
- CCB
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2013 | Completed final sign-off Nov 2013 | 605 Kearny St | Royal Allied Incorporated | revision to app#201308154492. d.a. checklist path of travel, restroom not accessible by wheel chair.Details
revision to app#201308154492. d.a. checklist path of travel, restroom not accessible by wheel chair. | $2,000 |
| Aug 15, 2013 | Completed final sign-off Nov 2013 | 605 Kearny St | Royal Allied Incorporated | change use from retail to limited restaurant. add new sink and counter at 1st fl. coffee machine at 1st flDetails
change use from retail to limited restaurant. add new sink and counter at 1st fl. coffee machine at 1st fl | $2,000 |
| Apr 8, 2013 | Completed final sign-off Jun 2013 | 605 Kearny St | refer to pa# 2012-0710-4487-accessibile entrance upgrade-installation of power door push padDetails
refer to pa# 2012-0710-4487-accessibile entrance upgrade-installation of power door push pad | $1,500 | |
| Mar 15, 2013 | Completed final sign-off Mar 2013 | 605 Kearny St | to obtain final inspection for work approved unde rpa # 201006033810. all work is complete.Details
to obtain final inspection for work approved unde rpa # 201006033810. all work is complete. | ||
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 605 Kearny St | Crime Watch Security Sys Llc | fire alarm, installation of a manual & automatic sprinkler monitoring fire alarm system including: fire alarm control panel, smoke detector, manual pull station, remote, anunciator, notification devices, & monitor modules ref#2012-0710-4487.Details
fire alarm, installation of a manual & automatic sprinkler monitoring fire alarm system including: fire alarm control panel, smoke detector, manual pull station, remote, anunciator, notification devices, & monitor modules ref#2012-0710-4487. | $6,500 |
| Dec 27, 2012 | Never finaled issued Dec 2012, no final | 605 Kearny St | street space and mta parkingDetails
street space and mta parking | ||
| Oct 18, 2012 | Never finaled issued Oct 2012, no final | 605 Kearny St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Aug 7, 2012 | Never finaled issued Aug 2012, no final | 607 Kearny St | per pa #200202118951. add address at commercial space as 605, 607 kearny st on g/f & 2nd fl. add address at two residential as 609, 611 kearny st. on 3rd & 4th fl.Details
per pa #200202118951. add address at commercial space as 605, 607 kearny st on g/f & 2nd fl. add address at two residential as 609, 611 kearny st. on 3rd & 4th fl. | ||
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 605 Kearny St | street spaceDetails
street space | ||
| Aug 1, 2012 | Never finaled issued Aug 2012, no final | 605 Kearny St | Project Contractor Inc | sprinkler revision . as built of 201105105752 r-1. adding 2 heads and relocating piping-Details
sprinkler revision . as built of 201105105752 r-1. adding 2 heads and relocating piping- | $400 |
| Jul 10, 2012 | Never finaled issued Aug 2012, no final | 605 Kearny St | change of use from r3 (1 unit) to r3 (2 units). (ref. 07/02/2012 email from planning dept.) proposed kitchen at third floor. no exterior work to be done. revision to pa# 2002/02/11/8951.Details
change of use from r3 (1 unit) to r3 (2 units). (ref. 07/02/2012 email from planning dept.) proposed kitchen at third floor. no exterior work to be done. revision to pa# 2002/02/11/8951. | $11,000 | |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 605 Kearny St | street spaceDetails
street space | ||
| Jun 7, 2012 | Completed final sign-off Jun 2013 | 605 Kearny St | revision to appl #2002.0211.8951 - floor slab extension at mezzanine level. to change mezz into a storyDetails
revision to appl #2002.0211.8951 - floor slab extension at mezzanine level. to change mezz into a story | $6,000 | |
| Jun 4, 2012 | Never finaled issued Jun 2012, no final | 605 Kearny St | street space, sidewalk & mta parking meterDetails
street space, sidewalk & mta parking meter | ||
| Apr 19, 2012 | Completed final sign-off Apr 2013 | 605 Kearny St | document existing gas meter location in sidewalkDetails
document existing gas meter location in sidewalk | ||
| Jan 30, 2012 | Never finaled issued Jan 2012, no final | 605 Kearny St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Nov 18, 2011 | Completed final sign-off Jun 2013 | 605 Kearny St | Housing Construction Inc. | revision to pa# 2011/02/11/8951. construction of bathroom @ mezzanine. bar sink @ 2nd floor & 3rd floor.Details
revision to pa# 2011/02/11/8951. construction of bathroom @ mezzanine. bar sink @ 2nd floor & 3rd floor. | $8,000 |
| Jul 6, 2011 | Never finaled issued Jul 2011, no final | 605 Kearny St | street space & mta parking meterDetails
street space & mta parking meter | ||
| May 10, 2011 | Completed final sign-off Jan 2017 | 605 Kearny St | Project Contractor Inc | installation of fire sprinkler system per nfpa 13Details
installation of fire sprinkler system per nfpa 13 | $13,000 |
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 605 Kearny St | street space and mta parkingDetails
street space and mta parking | ||
| Jan 7, 2011 | Never finaled issued Jan 2011, no final | 605 Kearny St | mtaDetails
mta | ||
| Nov 10, 2010 | Completed final sign-off Jun 2013 | 605 Kearny St | Housing Construction Inc. | this is a revision per pa# 2002/02/11/8951. to use concret constructed walls to replace the cmu walls that was in the original design.Details
this is a revision per pa# 2002/02/11/8951. to use concret constructed walls to replace the cmu walls that was in the original design. | $11,500 |
| Nov 4, 2010 | Never finaled issued Nov 2010, no final | 605 Kearny St | street spaceDetails
street space | ||
| Jun 3, 2010 | Expired or cancelled expired Mar 2013 | 605 Kearny St | Housing Construction Inc. | in response to complaint id# 10534 for violating conditions of approval contained in motion# 1649 (case# 2001.0249 ekcv) as a result of the violations, a stop work order for work performed under pa# 2002/02/11/8951 was issued on 12/31/09 by acting zoning administrator kelley amdur. project plannerDetails
in response to complaint id# 10534 for violating conditions of approval contained in motion# 1649 (case# 2001.0249 ekcv) as a result of the violations, a stop work order for work performed under pa# 2002/02/11/8951 was issued on 12/31/09 by acting zoning administrator kelley amdur. project planner | |
| Apr 23, 2010 | Never finaled issued Apr 2010, no final | 605 Kearny St | street space and mtaDetails
street space and mta | ||
| Mar 12, 2010 | Never finaled issued Mar 2010, no final | 605 Kearny St | streetspaceDetails
streetspace | ||
| Sep 25, 2009 | Completed final sign-off Jun 2013 | 605 Kearny St | Housing Construction Inc. | the existing footing for the building was discovered to be different than of the approved drawings. a revision of new footing detail is to be submitted and approved prior to the pouring of the concrete. revision to permit #2002/0211/8951.Details
the existing footing for the building was discovered to be different than of the approved drawings. a revision of new footing detail is to be submitted and approved prior to the pouring of the concrete. revision to permit #2002/0211/8951. | $11,500 |
| Aug 10, 2009 | Never finaled issued Aug 2009, no final | 605 Kearny St | street space permit only.Details
street space permit only. | ||
| Feb 11, 2002 | Completed final sign-off Jun 2013 | 605 Kearny St | umb - seismic mitigation of a hazard umb/ada 20% hardship, converted to reinf. masonry and conc. building. vertical addiotion with 1 residential unit added. 2007 sfbc is used.Details
umb - seismic mitigation of a hazard umb/ada 20% hardship, converted to reinf. masonry and conc. building. vertical addiotion with 1 residential unit added. 2007 sfbc is used. | $27,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Housing Construction Inc. (4), Project Contractor Inc (2), Royal Allied Incorporated (2), Crime Watch Security Sys Llc
- Architects
- Lawson Willard (2), Arnold Lee Lerner
- Engineers
- Ben Au
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.