J L N Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Dec 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2015 | Completed final sign-off Jan 2016 | 36 De Montfort Av | add bathroom to upper floorDetails
add bathroom to upper floor | $5,000 |
| Dec 10, 2010 | Completed final sign-off Jun 2011 | 3867 19th St | remove & replace (e) skylight. install new skylights of approx same size & dimensionsDetails
remove & replace (e) skylight. install new skylights of approx same size & dimensions | $18,000 |
| Aug 12, 2010 | Completed final sign-off Nov 2010 | 77 Ina Ct | remove & replace kitchen cabinetry in kind. install new dishwasher, refrigerator & flooring.Details
remove & replace kitchen cabinetry in kind. install new dishwasher, refrigerator & flooring. | $10,000 |
| Jul 12, 2010 | Completed final sign-off Jul 2010 | 998 Chenery St | demo existing non-structural slab in garage and replace with new 4" slab,Details
demo existing non-structural slab in garage and replace with new 4" slab, | $1,200 |
| Oct 30, 2009 | Completed final sign-off Nov 2010 | 3223 Gough St | extend 3rd floor existing deck, enclose larger area by installing new sunroom (pre-fab) add structural bracing to existing stair towerDetails
extend 3rd floor existing deck, enclose larger area by installing new sunroom (pre-fab) add structural bracing to existing stair tower | $50,000 |