Block 1037, lot 025
84 Commonwealth Ave
- City’s use
- Single Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 5,370 sq ft
- Lot
- 6,621 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage.Details
revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage. | $1,000 |
| Nov 22, 2022 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | voluntary structural strengthening of detached garage w/new skylights & garage revisions. repair (e) garage structural less than 50%Details
voluntary structural strengthening of detached garage w/new skylights & garage revisions. repair (e) garage structural less than 50% | $48,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | interior renovation on all levels, facade aleration at rear wall, installation of elevator.Details
interior renovation on all levels, facade aleration at rear wall, installation of elevator. | $195,000 |
| Dec 23, 2021 | Completed final sign-off Apr 2024 | 84 Commonwealth Av | Colindres & Associates | renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation.Details
renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation. | $240,000 |
| Dec 15, 2021 | Completed final sign-off Feb 2022 | 84 Commonwealth Av | Colindres & Associates | abatement of asbestos & lead paint per protech report dated 9.8.2021.surveying hazardous materials. work includes removal of hazardous materials per report recommendations & replacement of sheetrock where contaminants are present.Details
abatement of asbestos & lead paint per protech report dated 9.8.2021.surveying hazardous materials. work includes removal of hazardous materials per report recommendations & replacement of sheetrock where contaminants are present. | $12,000 |
| Nov 22, 2021 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | horizontal expansion of 2'5" @ rear 1st fl within buildable area. interior t.i. under separate permit. this permit scope is only for horizontal expansion.Details
horizontal expansion of 2'5" @ rear 1st fl within buildable area. interior t.i. under separate permit. this permit scope is only for horizontal expansion. | $80,000 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 84 Commonwealth Av | street space permitDetails
street space permit | ||
| Jan 14, 2014 | Completed final sign-off Mar 2014 | 84 Commonwealth Av | Benfield Works | replace damaged redwood deck timbers with new wood, same to steps leading to deck, add wooden handrails repair leaning fence (north side) repairs are less than 50%Details
replace damaged redwood deck timbers with new wood, same to steps leading to deck, add wooden handrails repair leaning fence (north side) repairs are less than 50% | $5,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Colindres & Associates (6), Benfield Works
- Architects
- David Armour (4)
- Engineers
- Randy Collins (3), Paul Curren
- Authorized agent-otherss
- Mateo Fabbri
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.