Barrett Aghazarian
- Listed as
- engineer
- Firm
- Aghazarian Consulting Engin
- Based in
- El Cerrito
- On San Francisco permits
- Feb 2009 to Dec 2021
14 permits since 2000 (engineer on 14 permits): 10 completed, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2021 | Never finaled issued Apr 2022, no final | 14 Winfield St | Westward Builders Llc | building retaining wall.Details
building retaining wall. | $47,626 |
| Sep 23, 2021 | Completed final sign-off Sep 2023 | 328 Cumberland St | Forma Construction | revision to pa 201708013585 and 201811206369 to include structural connections at open interior stairs, revised lightwell layout, revised rear yard layout, revised gas appliance locationsDetails
revision to pa 201708013585 and 201811206369 to include structural connections at open interior stairs, revised lightwell layout, revised rear yard layout, revised gas appliance locations | |
| Sep 1, 2020 | Completed final sign-off Sep 2023 | 328 Cumberland St | Ace Drilling & Excavation, Forma Construction | temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of soldier beams, pressure treated lagging, and internal braces. | $73,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 350 Jersey St | Forma Construction | revision to pa #201704285182. reconfiguration of interior stair. modification of ground fl room layout. add half bath at g/f. addition of slab plan.Details
revision to pa #201704285182. reconfiguration of interior stair. modification of ground fl room layout. add half bath at g/f. addition of slab plan. | |
| Apr 28, 2017 | Completed final sign-off Nov 2019 | 350 Jersey St | Forma Construction | vertical & horizontal addition. renovation of (e) 2 story sfd into 3 (three) story sfd. additonal bedrooms, bath & family room.Details
vertical & horizontal addition. renovation of (e) 2 story sfd into 3 (three) story sfd. additonal bedrooms, bath & family room. | $400,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 243 Vallejo St | Derry Casey Builders | revision/modifications to app#201511092172. remove 2 concrete beams at roof and install 2 steel beam in same location.Details
revision/modifications to app#201511092172. remove 2 concrete beams at roof and install 2 steel beam in same location. | $22,000 |
| Feb 29, 2016 | Completed final sign-off Oct 2018 | 15 Mangels Av | Jab Construction Company Ltd | revision to pa #201411212263 - update structural plans to reflect scope reductions during main permit planning review: front door no longer being relocated, smaller roof deck.Details
revision to pa #201411212263 - update structural plans to reflect scope reductions during main permit planning review: front door no longer being relocated, smaller roof deck. | |
| Nov 21, 2014 | Completed final sign-off Oct 2018 | 15 Mangels Av | Jab Construction Company Ltd | remodel of lower level bed & bath & extension under (e) 2nd floor space (within overall foot print). addition of roof deck. relocation of front door, front decorative "rain-screen" siding.Details
remodel of lower level bed & bath & extension under (e) 2nd floor space (within overall foot print). addition of roof deck. relocation of front door, front decorative "rain-screen" siding. | $110,000 |
| Jan 31, 2014 | Completed final sign-off May 2017 | 135 Mendosa Av | J Reilly Construction | horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck.Details
horizontal addition to rear of building. living room, 2 guest room addition. relocate master bedroom, bath and new deck. | $380,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2014 | 2742 Pierce St | new powder room in e closet, remove partition between closet and master bath, new larger master bath. remove wall betwen 2 rear bedrooms, install beams, posts,footings to replace wall. remove wall section on lower floor near stairs. new casework. reduction of fr. dr. @Details
new powder room in e closet, remove partition between closet and master bath, new larger master bath. remove wall betwen 2 rear bedrooms, install beams, posts,footings to replace wall. remove wall section on lower floor near stairs. new casework. reduction of fr. dr. @ | $72,000 | |
| Apr 2, 2013 | Never finaled issued Apr 2013, no final | 1682 Dolores St | Forma Construction | 2 new footings and install 1 steel beam.Details
2 new footings and install 1 steel beam. | $15,000 |
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 450 Ortega St | Forma Construction | revision to app#201209119452. beam replacement at roof.Details
revision to app#201209119452. beam replacement at roof. | $5,000 |
| Jun 11, 2012 | Completed final sign-off Apr 2013 | 508 Connecticut St | Levitch Associates, Inc. | kitchen and laundry remodel. window and oor dhanges at rear and sides. change roof at rear portion of kitchen from sloped to flatDetails
kitchen and laundry remodel. window and oor dhanges at rear and sides. change roof at rear portion of kitchen from sloped to flat | $54,000 |
| Feb 5, 2009 | Never finaled issued Apr 2009, no final | 575 Howard St | tenant improvement: conversio from office to bar. remove 3 extg non bearing partition walls,upgrade to ada restrooms, install bar /counter built in seating fire corridor, recess entry into facade per plan.Details
tenant improvement: conversio from office to bar. remove 3 extg non bearing partition walls,upgrade to ada restrooms, install bar /counter built in seating fire corridor, recess entry into facade per plan. | $125,000 |