Permit GraphShortlistSan Francisco building permits since 2000

Block 6616, lot 026

1529 Dolores St

City’s use
Single Family Residential
Built
1910
Stories
3
Units
1
Rooms
4 bedrooms, 3 bathrooms
Building
2,529 sq ft
Lot
2,495 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

10 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 11, 2021Completed
final sign-off Oct 2021
1529 Dolores StGolden State Windows Increplacing 4 front windows for a like kind. facing street. marvin wood with true divided lights with ogee lugs, double hung.
Details
Permit
202105110112
Status
complete
Filed
May 11, 2021
Permit issued
May 25, 2021
Final sign-off
Oct 25, 2021
Declared cost
$15,000
Address
1529 Dolores St

replacing 4 front windows for a like kind. facing street. marvin wood with true divided lights with ogee lugs, double hung.

Open the permit page

$15,000
Aug 22, 2020Completed
final sign-off Mar 2021
1529 Dolores StGreen Metro Increvision to pa #2019-0924-2506: grd floor - relocate laundry units. add water heater for radiant heating system. new 8' fence at rear yard. 2nd flr: rearrange powder room layout. 3rd floor: rearrange master bedroom layout.
Details
Permit
202008222418
Status
complete
Filed
Aug 22, 2020
Permit issued
Oct 7, 2020
Final sign-off
Mar 25, 2021
Declared cost
$20,000
Address
1529 Dolores St

revision to pa #2019-0924-2506: grd floor - relocate laundry units. add water heater for radiant heating system. new 8' fence at rear yard. 2nd flr: rearrange powder room layout. 3rd floor: rearrange master bedroom layout.

Open the permit page

$20,000
Jun 25, 2020Never finaled
issued Jul 2020, no final
1529 Dolores Ststreet space
Details
Permit
M1213449
Status
issued
Filed
Jun 25, 2020
Permit issued
Jul 7, 2020
Address
1529 Dolores St

street space

Open the permit page

Nov 7, 2019Never finaled
issued Nov 2019, no final
1529 Dolores Ststreet space
Details
Permit
M1163667
Status
issued
Filed
Nov 7, 2019
Permit issued
Nov 7, 2019
Address
1529 Dolores St

street space

Open the permit page

Sep 24, 2019Completed
final sign-off Sep 2023
1529 Dolores StGreen Metro Increvision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan.
Details
Permit
201909242506
Status
complete
Filed
Sep 24, 2019
Permit issued
Oct 17, 2019
Final sign-off
Sep 28, 2023
Declared cost
$30,000
Address
1529 Dolores St

revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan.

Open the permit page

$30,000
Dec 1, 2017Completed
final sign-off Mar 2021
1529 Dolores StGreen Metro Incadd 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.
Details
Permit
201712015277
Status
complete
Filed
Dec 1, 2017
Permit issued
Sep 11, 2019
Final sign-off
Mar 25, 2021
Declared cost
$250,000
Address
1529 Dolores St

add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.

Open the permit page

$250,000
Jun 6, 2013Never finaled
issued Jun 2013, no final
1529 Dolores StO'neill & Neville Construction Incbathroom additon and kitchen remodel on 1st floor. structural upgrade in basement
Details
Permit
201306068832
Status
issued
Filed
Jun 6, 2013
Permit issued
Jun 27, 2013
Declared cost
$35,000
Address
1529 Dolores St

bathroom additon and kitchen remodel on 1st floor. structural upgrade in basement

Open the permit page

$35,000
Jul 11, 2011Completed
final sign-off Nov 2012
1529 Dolores Strepair rear stairs & add new deck
Details
Permit
201107119859
Status
complete
Filed
Jul 11, 2011
Permit issued
Nov 10, 2011
Final sign-off
Nov 15, 2012
Declared cost
$4,000
Address
1529 Dolores St

repair rear stairs & add new deck

Open the permit page

$4,000
Aug 30, 2010Completed
final sign-off Sep 2010
1529 Dolores StNew High Protection Roofingreroofing
Details
Permit
201008309802
Status
complete
Filed
Aug 30, 2010
Permit issued
Aug 30, 2010
Final sign-off
Sep 10, 2010
Declared cost
$10,000
Address
1529 Dolores St

reroofing

Open the permit page

$10,000
Apr 8, 2010Never finaled
issued Apr 2010, no final
1529 Dolores Ststreet and sidewalk permits
Details
Permit
M196748
Status
issued
Filed
Apr 8, 2010
Permit issued
Apr 8, 2010
Address
1529 Dolores St

street and sidewalk permits

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Green Metro Inc (3), Golden State Windows Inc, New High Protection Roofing, O'neill & Neville Construction Inc
Architects
David Armour, Jeff Tsz Wai Chow
Engineers
Rodrigo Santos

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.