Balfour Beatty Construction Llc
- Based in
- Oakland
- On San Francisco permits
- Sep 2013 to Mar 2021
- Last 24 months
- 0 permits filed
58 permits since 2000: 49 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2021 | Completed final sign-off Apr 2021 | 532 Folsom St | to obtain final inspection for work approved under permit application no(s): 201604184988. all work is completeDetails
to obtain final inspection for work approved under permit application no(s): 201604184988. all work is complete | $55,800 |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 500 Folsom St | remove in-duct detectors from certain garage exhaust fans per recommendations from the smoke control consultant, modify the fa programming & gcp graphics so that the fso's in the garage used solely for sc remain open to evacuate smoke, unless closed by sffd from the manual override on the smoke c...Details
remove in-duct detectors from certain garage exhaust fans per recommendations from the smoke control consultant, modify the fa programming & gcp graphics so that the fso's in the garage used solely for sc remain open to evacuate smoke, unless closed by sffd from the manual override on the smoke c... | $11,000 |
| Dec 27, 2019 | Never finaled issued Dec 2019, no final | 500 Folsom St | ref pa# 201503110506; updated smoke control matrix for revisions to the garage exhausetDetails
ref pa# 201503110506; updated smoke control matrix for revisions to the garage exhauset | |
| Nov 19, 2019 | Completed final sign-off Apr 2021 | 500 Folsom St | for record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s)Details
for record purposes only that pertain to unit reduction. 2 studio units were removed from each floor on levels 39-42 for a total of 8 units removed from the project. (ref pa #2015-0311-0506 s) | |
| May 29, 2019 | Never finaled issued May 2019, no final | 500 Folsom St | smoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher.Details
smoke control panel layout submitted as a revision to the addendum 4 (mep) issued permit. ref pa #201503110506 s4. n/a for maher. | |
| Dec 3, 2018 | Completed final sign-off Dec 2018 | 801 Brannan St | to obtain final inspection for work approved under pa#2016-0421-5391, 2017-0417-4155 & 201705257609Details
to obtain final inspection for work approved under pa#2016-0421-5391, 2017-0417-4155 & 201705257609 | |
| Sep 6, 2018 | Completed final sign-off Dec 2020 | 500 Folsom St | shoring & hold down anchors to combat hydrostatic pressure from ground water: relocation of one hydrostatic tiedown anchor one foot away from the original location. (ref pa #2015-0311-0506 s1)Details
shoring & hold down anchors to combat hydrostatic pressure from ground water: relocation of one hydrostatic tiedown anchor one foot away from the original location. (ref pa #2015-0311-0506 s1) | $240,000 |
| Jul 26, 2018 | Completed final sign-off Dec 2020 | 500 Folsom St | document parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a.Details
document parking layout from pre-app meeting & da-09. rev to pa#201503110506-s3(arch). maher n/a. | |
| May 31, 2018 | Completed final sign-off Apr 2021 | 500 Folsom St | grey water system (storm water).**maher n/a**Details
grey water system (storm water).**maher n/a** | |
| Jan 23, 2018 | Completed final sign-off Dec 2020 | 500 Folsom St | temporary truss shoring for levels 3-9 (ref pa #201503110506-s)Details
temporary truss shoring for levels 3-9 (ref pa #201503110506-s) | $1,000 |
| Nov 27, 2017 | Completed final sign-off Dec 2020 | 500 Folsom St | phase 2 of the tower crane submital - tower crane permit for tie-ins. ref pa# 2015/03/11/0506-s. ** maher: n/a **Details
phase 2 of the tower crane submital - tower crane permit for tie-ins. ref pa# 2015/03/11/0506-s. ** maher: n/a ** | $116,000 |
| May 25, 2017 | Expired or cancelled expired Dec 2018 | 801 Brannan St | for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a **Details
for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a ** | |
| May 18, 2017 | Completed final sign-off May 2017 | 801 Brannan St | to obtain final inspection for work approved under pa# 201503191348 & 201309045884. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa# 201503191348 & 201309045884. all work is complete. n/a for maher. | |
| Apr 25, 2017 | Never finaled issued Aug 2017, no final | 522 08th St | relocation of extg low pressure fire hydrant 10 feet from current location on corner.Details
relocation of extg low pressure fire hydrant 10 feet from current location on corner. | |
| Apr 17, 2017 | Expired or cancelled expired Dec 2018 | 801 Brannan St | revision to title sheet good for 201309045886 s2 revision to bike count to 311 spaces and reduction of parking by 1 to 428 to reflect final condition in the bldg. revisions meet planning code requirementDetails
revision to title sheet good for 201309045886 s2 revision to bike count to 311 spaces and reduction of parking by 1 to 428 to reflect final condition in the bldg. revisions meet planning code requirement | |
| Mar 20, 2017 | Completed final sign-off Dec 2020 | 500 Folsom St | tower crane for new construction at 500 folsom street. (ref pa#201503110506). this permit is for phase 1 tower crane erection up to level 16 (mast height 217 ft) ** maher; n/a **Details
tower crane for new construction at 500 folsom street. (ref pa#201503110506). this permit is for phase 1 tower crane erection up to level 16 (mast height 217 ft) ** maher; n/a ** | $200,000 |
| Jan 24, 2017 | Completed final sign-off Dec 2018 | 801 Brannan St | alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a **Details
alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a ** | $250,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2018 | 801 Brannan St | temporary leasing office will be placed on a temporary parking lot maher not reqDetails
temporary leasing office will be placed on a temporary parking lot maher not req | $50,000 |
| Dec 16, 2016 | Completed final sign-off Jan 2018 | 801 Brannan St | revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinanceDetails
revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinance | $200,000 |
| Aug 8, 2016 | Completed final sign-off Aug 2017 | 801 Brannan St | roof deck fire pit (ref. pa 201309045886); maher n/aDetails
roof deck fire pit (ref. pa 201309045886); maher n/a | $5,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2020 | 500 Folsom St | temporary excavation shoring for the removal of an existing burried basement wall (ref. pa 201503110506s).Details
temporary excavation shoring for the removal of an existing burried basement wall (ref. pa 201503110506s). | $90,000 |
| May 5, 2016 | Completed final sign-off Dec 2020 | 500 Folsom St | temporary equipment trestle for new construction.ref pa# 2015/03/11/0506-s ** maher: n/a **Details
temporary equipment trestle for new construction.ref pa# 2015/03/11/0506-s ** maher: n/a ** | $465,000 |
| Apr 21, 2016 | Expired or cancelled expired Dec 2018 | 801 Brannan St | revision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher.Details
revision to s1 app#201309045886. provide additional drainage from the garage open to the sky. n/a for maher. | |
| Apr 18, 2016 | Never finaled issued May 2016, no final | 532 Folsom St | tiebacks extending to 532 folsom street for shoring off 500 folsom per pa 2015-0925-8114 ** maher: exempted - approval from dph attached. **Details
tiebacks extending to 532 folsom street for shoring off 500 folsom per pa 2015-0925-8114 ** maher: exempted - approval from dph attached. ** | $55,800 |
| Apr 18, 2016 | Completed final sign-off Apr 2021 | 19 Clementina St | tiebacks extending into 19 clementina due to shoring for 500 folsom street ref pa2015-0925-8114 ** maher: exempted - approval from dph attached **Details
tiebacks extending into 19 clementina due to shoring for 500 folsom street ref pa2015-0925-8114 ** maher: exempted - approval from dph attached ** | $249,550 |
| Apr 18, 2016 | Completed final sign-off Apr 2021 | 528 Folsom St | tiebacks extending into 528 folsom street due to shoring of 500 folsom per pa 2015-0925-8114 ** maher: exempted - approval from dph attached **Details
tiebacks extending into 528 folsom street due to shoring of 500 folsom per pa 2015-0925-8114 ** maher: exempted - approval from dph attached ** | $305,350 |
| Mar 14, 2016 | Completed final sign-off May 2017 | 801 Brannan St | revision per bldg inspector request to comply with the correction notice & report #2 filed 3/4/16 under pa 2013-0904-5886, to provide an approved revision for the change in boundary element ties to #4 bar from #5 bar.Details
revision per bldg inspector request to comply with the correction notice & report #2 filed 3/4/16 under pa 2013-0904-5886, to provide an approved revision for the change in boundary element ties to #4 bar from #5 bar. | |
| Mar 3, 2016 | Completed final sign-off May 2017 | 801 Brannan St | revision per bldg inspection request to comply with the correction notice and report #1 filed 2/23/16 under app#201309045886 for the concrete beam schedule change. n/a for maherDetails
revision per bldg inspection request to comply with the correction notice and report #1 filed 2/23/16 under app#201309045886 for the concrete beam schedule change. n/a for maher | |
| Feb 19, 2016 | Completed final sign-off Dec 2020 | 500 Folsom St | jet grout ground improvement for new construction. ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph **Details
jet grout ground improvement for new construction. ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph ** | $1,000 |
| Feb 19, 2016 | Completed final sign-off Dec 2020 | 500 Folsom St | soil removal for new construction (site migitation plan). ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph **Details
soil removal for new construction (site migitation plan). ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph ** | $1,000 |
| Feb 5, 2016 | Completed final sign-off May 2017 | 801 Brannan St | additional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not reqDetails
additional structural detail as corrective measure requested by inspector at area they were unable to inspect. ref 201601278143, 201601257916, 201309045886 maher not req | |
| Jan 27, 2016 | Completed final sign-off May 2017 | 801 Brannan St | revision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required.Details
revision to 201601257916. additonal clarification regarding corner condition detail as requested by bldg inspector to comply with correction notice and report filed under 201309045886. compliance with maher ordinance no 155-13 not required. | |
| Jan 25, 2016 | Completed final sign-off May 2017 | 801 Brannan St | comply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher.Details
comply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher. | |
| Dec 17, 2015 | Completed final sign-off Dec 2018 | 801 Brannan St | revision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a **Details
revision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a ** | $5,700,000 |
| Sep 25, 2015 | Completed final sign-off Dec 2020 | 500 Folsom St | excavate shoring for new construction pa #2015-03-11-0506s. maher ordinance exempted by dph.Details
excavate shoring for new construction pa #2015-03-11-0506s. maher ordinance exempted by dph. | $3,000,000 |
| Aug 21, 2015 | Completed final sign-off May 2017 | 801 Brannan St | rev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance.Details
rev. to addendum 1 ref pa#201309045886. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. n/a for maher ordinance. | $4,500,000 |
| Jul 21, 2015 | Completed final sign-off Apr 2016 | 360 Post St | revision to 201412163862 to simplify scope of work with existing offices to remainDetails
revision to 201412163862 to simplify scope of work with existing offices to remain | |
| May 18, 2015 | Completed final sign-off Jan 2017 | 939 Ellis St | facde renovate w/ new cladding on building, and the rooftop will be updated to provide private roof-top space for tenants. maher ordinance ext is not required.Details
facde renovate w/ new cladding on building, and the rooftop will be updated to provide private roof-top space for tenants. maher ordinance ext is not required. | $5,670,128 |
| May 6, 2015 | Completed final sign-off Dec 2018 | 801 Brannan St | revision to s1. revised foundation pile plans based on revised test pile layout & calcs; added sand/oil & grease interceptors in level 1; added cable thru in transformer rooms; revised area separation wall details; added leasing entry canopy & eliminated concrete column. ref #201309045886-s1.Details
revision to s1. revised foundation pile plans based on revised test pile layout & calcs; added sand/oil & grease interceptors in level 1; added cable thru in transformer rooms; revised area separation wall details; added leasing entry canopy & eliminated concrete column. ref #201309045886-s1. | $150,000 |
| Apr 23, 2015 | Never finaled issued Jun 2015, no final | 315 Montgomery St | interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required.Details
interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required. | $600,000 |
| Mar 23, 2015 | Completed final sign-off Aug 2015 | 995 Market St | to abate nov numbers 200993151, 200236116, which were performed under permit #201409226984Details
to abate nov numbers 200993151, 200236116, which were performed under permit #201409226984 | |
| Mar 19, 2015 | Expired or cancelled expired May 2017 | 801 Brannan St | indicator piles for site permit #201309045886. maher ordinance-exempted per letter.Details
indicator piles for site permit #201309045886. maher ordinance-exempted per letter. | $1,000 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 995 Market St | 1st floor: demo select partitions, power/data, & construction of demising wall & slab infill @ (e) stair location between ground floor & mezz.Details
1st floor: demo select partitions, power/data, & construction of demising wall & slab infill @ (e) stair location between ground floor & mezz. | $100,000 |
| Dec 16, 2014 | Completed final sign-off Apr 2016 | 360 Post St | 8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permitDetails
8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permit | $386,000 |
| Oct 28, 2014 | Completed final sign-off Nov 2015 | 995 Market St | barrier removal only. install new restrooms in kadvance of new t.i. on mezzanine. mep and fire projection under seperate permits.Details
barrier removal only. install new restrooms in kadvance of new t.i. on mezzanine. mep and fire projection under seperate permits. | |
| Oct 28, 2014 | Completed final sign-off Aug 2015 | 995 Market St | revision to app#201312264763. removing 2 accessible restrooms from mezz level. tenant space to remain vacant per ab-017 until all accessible features and required fixture counts are returned. ada restroom to be installed under separate permit.Details
revision to app#201312264763. removing 2 accessible restrooms from mezz level. tenant space to remain vacant per ab-017 until all accessible features and required fixture counts are returned. ada restroom to be installed under separate permit. | |
| Sep 22, 2014 | Completed final sign-off Aug 2015 | 995 Market St | to comply with nov 200236116. restoring aluminum and non-structrual cladding system in designated exterior area with the following. remaining all deteriorated components and installing new flashing system, hand scrub cleaning panels, restoring operation of windows. new structural framework will beDetails
to comply with nov 200236116. restoring aluminum and non-structrual cladding system in designated exterior area with the following. remaining all deteriorated components and installing new flashing system, hand scrub cleaning panels, restoring operation of windows. new structural framework will be | $2,340,000 |
| Aug 13, 2014 | Completed final sign-off Apr 2016 | 360 Post St | rev. to pa#201203166226 adding fsd's to electrical & communications closets based on building inspectors request. work includes shaft infill with light weight concrete on basement & 1/f.Details
rev. to pa#201203166226 adding fsd's to electrical & communications closets based on building inspectors request. work includes shaft infill with light weight concrete on basement & 1/f. | $12,000 |
| Jun 23, 2014 | Completed final sign-off Apr 2016 | 360 Post St | revision to 201203166226. add fire smoke dampers to electrical closets on floor 3-11, except for 5 based on bldg inspectors requestDetails
revision to 201203166226. add fire smoke dampers to electrical closets on floor 3-11, except for 5 based on bldg inspectors request | $150,000 |
| May 9, 2014 | Completed final sign-off Apr 2016 | 360 Post St | revision to 201203166226. 5th fl change single tenant layout to 2 tenant layoutDetails
revision to 201203166226. 5th fl change single tenant layout to 2 tenant layout | $95,000 |
| Apr 30, 2014 | Completed final sign-off Jul 2014 | 1019 Market St | b/f -for place of assembly permit for commercial t.i. approved under permit #201312194666 to establish a-2 occupancy loadsDetails
b/f -for place of assembly permit for commercial t.i. approved under permit #201312194666 to establish a-2 occupancy loads | |
| Apr 28, 2014 | Completed final sign-off Jul 2015 | 995 Market St | comply w/nov 200236116-mock up w/intend to later repair. exterior repair: restore alum & glass curtain wall sys, remove deteriorated components, install new flashing, hand-scrub cleaning panels, restore operation of windows, install 3-coat stucco cladding panel sys to replace miss ext panels.Details
comply w/nov 200236116-mock up w/intend to later repair. exterior repair: restore alum & glass curtain wall sys, remove deteriorated components, install new flashing, hand-scrub cleaning panels, restore operation of windows, install 3-coat stucco cladding panel sys to replace miss ext panels. | $10,000 |
| Apr 18, 2014 | Completed final sign-off Jun 2014 | 1019 Market St | revision to permit #2012-1219-4666 change electrical room names 208,308,406,507Details
revision to permit #2012-1219-4666 change electrical room names 208,308,406,507 | |
| Dec 20, 2013 | Completed final sign-off Apr 2015 | 995 Market St | voluntary structural upgrade, interior upgrades, restroom upgrades. mep deferred permits. no exterior work in job scope. ** interim controls - market street & soma: see attached. **Details
voluntary structural upgrade, interior upgrades, restroom upgrades. mep deferred permits. no exterior work in job scope. ** interim controls - market street & soma: see attached. ** | $1,330,000 |
| Dec 20, 2013 | Completed final sign-off Apr 2015 | 995 Market St | barrier removal at restrooms on 4, 5, 6, 7, 10, 11, & 14 floors. project scope consists demo of partitions, and associated elec,plumbing and ceiling work at restrooms. install new ceilings,finishes, elec, plumbing. no modifaction of e mech or structural. mech,elec, ls,sprinklers, separate permit.Details
barrier removal at restrooms on 4, 5, 6, 7, 10, 11, & 14 floors. project scope consists demo of partitions, and associated elec,plumbing and ceiling work at restrooms. install new ceilings,finishes, elec, plumbing. no modifaction of e mech or structural. mech,elec, ls,sprinklers, separate permit. | $250,000 |
| Dec 19, 2013 | Completed final sign-off Jun 2014 | 1017 Market St | interior commercial tenant improvement & fit-out of (e) bldg totalling approx 75,000 sq ft. improvements comprise open office w/ distributed offices & mtg rms, pantrys, break area, (n) 1-story staircase element & storage rooms. (interim controls see attached).Details
interior commercial tenant improvement & fit-out of (e) bldg totalling approx 75,000 sq ft. improvements comprise open office w/ distributed offices & mtg rms, pantrys, break area, (n) 1-story staircase element & storage rooms. (interim controls see attached). | $4,200,000 |
| Nov 5, 2013 | Completed final sign-off Apr 2015 | 995 Market St | project scope consists of path of travel upgrades with minor construction involved for compliance with sf dbi administrative bulletin #056. no modification to (e) mechanical or structural system is required.Details
project scope consists of path of travel upgrades with minor construction involved for compliance with sf dbi administrative bulletin #056. no modification to (e) mechanical or structural system is required. | $18,500 |
| Sep 4, 2013 | Completed final sign-off Dec 2018 | 801 Brannan St | to erect 6 stories, no basement, 434 dwelling units, type 1a & 3a, residential/retail/parking building. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 6 stories, no basement, 434 dwelling units, type 1a & 3a, residential/retail/parking building. ** maher: compliance with ordinance no# 155-13 not required ** | $112,000,000 |