Alex Heuer
- License
- C61027
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C61027 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Oct 2017 to Jun 2018
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clune Construction Company L P, G Swanson Constr. Inc.
- Architects
- Michael R. Downey (2)
- Engineers
- Eric Christian Stovner, Srdjan Rebraca, Wilson Lee
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 1945 Irving St | G Swanson Constr. Inc. | t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.Details
t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository. | $750,000 |
| Oct 17, 2017 | Expired or cancelled cancelled Jan 2026 | 4638 Mission St | Clune Construction Company L P | voluntary ada barrier removal project regrade in front of (e) citi bank exterior thru-the-wall atm to provide level landing for wheelchair. no change in use or occupancy. no work to exterior facadeDetails
voluntary ada barrier removal project regrade in front of (e) citi bank exterior thru-the-wall atm to provide level landing for wheelchair. no change in use or occupancy. no work to exterior facade | $55,525 |