Brandon John Jones
- Listed as
- authorized agent-others, contractor
- Firm
- Principal Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Oct 2026
1,403 permits since 2000 (contractor on 1,403 permits, authorized agent-others on 9 permits): 1,119 completed, 77 in progress, 156 never finaled, 51 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 1,403.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 88 Spear St | Principal Builders Inc. | 9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred.Details
9th floor: partial interior ti includes new partitions, doors, ceilings, finishes, and millwork. mep deferred. | $2,170,000 |
| Sep 24, 2026 | In progress issued Sep 2026 | 145 New Montgomery St | Principal Builders Inc. | ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit.Details
ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit. | $842,811 |
| Sep 18, 2026 | In progress issued Sep 2026 | 850 Brannan St | Principal Builders Inc. | revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work.Details
revision 202608146613 to modification of (e) stair handrail. removal of double doors @ loading dock from scope of work. | |
| Sep 17, 2026 | In progress issued Sep 2026 | 475 Sansome St | Principal Builders Inc. | floor 12-15 interior soft demo. ab-017Details
floor 12-15 interior soft demo. ab-017 | $120,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 475 Sansome St | Principal Builders Inc. | floor 20 +21- interior soft demo.Details
floor 20 +21- interior soft demo. | $80,000 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1 California St | Principal Builders Inc. | 19th floor: t.i. work includes non-structural partitions, ceilings, finishes and associated mech and electrical expansion of existing tenant suite.Details
19th floor: t.i. work includes non-structural partitions, ceilings, finishes and associated mech and electrical expansion of existing tenant suite. | $375,000 |
| Sep 11, 2026 | In progress issued Sep 2026 | 840 Battery St | Principal Builders Inc. | revision to pa#: 202607144985. level 2: relocate drinking foundation. jan closet. update wall mounted water closets remove idf room 212. level#: relocate mdf room. demo (e) idf 140. structural drawing included for mdf room equipment support.Details
revision to pa#: 202607144985. level 2: relocate drinking foundation. jan closet. update wall mounted water closets remove idf room 212. level#: relocate mdf room. demo (e) idf 140. structural drawing included for mdf room equipment support. | |
| Sep 3, 2026 | In progress issued Sep 2026 | 600 Montgomery St | Principal Builders Inc. | 43rd fl: soft demo of interior, replacement with new non bearing partitions, new lighting, new millwork and appliances, partial replacement of mech, electrical, plumbing, districtDetails
43rd fl: soft demo of interior, replacement with new non bearing partitions, new lighting, new millwork and appliances, partial replacement of mech, electrical, plumbing, district | $624,369 |
| Aug 31, 2026 | In progress issued Oct 2026 | 120 Kearny St | Principal Builders Inc. | 24/fl- revision 202602115770- includes altered reception layout to accomadate (n) secure vestibule. (n) fire rated wall and door and four additional phone booths. no plumbing fixture changesDetails
24/fl- revision 202602115770- includes altered reception layout to accomadate (n) secure vestibule. (n) fire rated wall and door and four additional phone booths. no plumbing fixture changes | |
| Aug 24, 2026 | In progress issued Sep 2026 | 600 Montgomery St | Principal Builders Inc. | interior tenant fit out of office space on level 19. non-structural partitions and ceilings, finishes and millworkDetails
interior tenant fit out of office space on level 19. non-structural partitions and ceilings, finishes and millwork | $2,800,000 |
| Aug 24, 2026 | Completed final sign-off Sep 2026 | 850 Brannan St | Principal Builders Inc. | interior tenant improvement consisting of new interior partitions.Details
interior tenant improvement consisting of new interior partitions. | $57,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 50 California St | Principal Builders Inc. | level 27; alterations to conference rooms, storage area and employee break room. mep deferred.Details
level 27; alterations to conference rooms, storage area and employee break room. mep deferred. | $2,862,400 |
| Aug 11, 2026 | In progress issued Aug 2026 | 120 Kearny St | Principal Builders Inc. | level 20. install (1) phone booth.Details
level 20. install (1) phone booth. | $2,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 595 Pacific Av | Principal Builders Inc. | fire only: evacuation maps for 2nd and 3rd floorsDetails
fire only: evacuation maps for 2nd and 3rd floors | |
| Aug 7, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Principal Builders Inc. | 4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates.Details
4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates. | |
| Jul 21, 2026 | Completed final sign-off Aug 2026 | 595 Pacific Av | Principal Builders Inc. | 2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power.Details
2/f: revision to pa#: 202602246389. adding (2) new phone booths with new supporting power. | $8,000 |
| Jul 17, 2026 | In progress issued Aug 2026 | 145 New Montgomery St | Principal Builders Inc. | minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.Details
minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork. | $750,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 149 New Montgomery St | Principal Builders Inc. | stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.Details
stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements. | $1,130,000 |
| Jul 14, 2026 | In progress issued Aug 2026 | 840 Battery St | Principal Builders Inc. | ti includes (n) non strutural partitions, finishes, alterations to (e) bathrooms, and mep associated with listed wsork. soft demo under 202606032472Details
ti includes (n) non strutural partitions, finishes, alterations to (e) bathrooms, and mep associated with listed wsork. soft demo under 202606032472 | $2,000,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 50 California St | Principal Builders Inc. | l27: suite 2750 non-structural demo per ab-017Details
l27: suite 2750 non-structural demo per ab-017 | $25,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 1455 03rd St | Principal Builders Inc. | assembly permit associated with pa 202508082619 & 202404129924Details
assembly permit associated with pa 202508082619 & 202404129924 | |
| Jun 24, 2026 | In progress issued Jul 2026 | 2545 16th St | Principal Builders Inc. | deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and rampsDetails
deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and ramps | |
| Jun 17, 2026 | In progress issued Jun 2026 | 2545 16th St | Principal Builders Inc. | new power and signal devices. deferred under pa# 202606032472Details
new power and signal devices. deferred under pa# 202606032472 | |
| Jun 16, 2026 | In progress issued Jun 2026 | 400 Montgomery St | Principal Builders Inc. | 2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred.Details
2nd floor: ti includes light demo, new conference room, new storage alcore, relocation of mens room door, new breakroom for employee use. mep deferred. | $600,000 |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 120 Kearny St | Principal Builders Inc. | revision to pa# 202602115767, level 20. various minor mep updates, corrected address on title blocks of sheets.Details
revision to pa# 202602115767, level 20. various minor mep updates, corrected address on title blocks of sheets. | $600 |
| Jun 3, 2026 | In progress issued Jun 2026 | 2545 16th St | Principal Builders Inc. | 1st fl. tenant improvement, constructing 2 rooms with non-struct partitions, new equipment slab to support 3 equipment chamber paints and floor finishesDetails
1st fl. tenant improvement, constructing 2 rooms with non-struct partitions, new equipment slab to support 3 equipment chamber paints and floor finishes | $322,150 |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318.Details
revision to 202603187875 to include: reconfigured 2 hr wall layout on floor 1. structural steel posts for motorized door on floor 01. conference 318 to become shared office 318. | |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 475 Sansome St | Principal Builders Inc. | 6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space.Details
6th fl: renovation to existing commercial ti. includes non structural partitions, acoustic ceiling tiles and finishes. new power and signal devices throught the space. | $162,000 |
| May 29, 2026 | Completed final sign-off Jun 2026 | 120 Kearny St | Principal Builders Inc. | 21st fl - revision to pa 202511189893 correct project address in title blocksDetails
21st fl - revision to pa 202511189893 correct project address in title blocks | |
| May 26, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | l1-3: deferred mep for pa# 202603187875Details
l1-3: deferred mep for pa# 202603187875 | $713,232 |
| May 21, 2026 | In progress issued Jun 2026 | 1800 Owens St | Principal Builders Inc. | installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers.Details
installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers. | $150,000 |
| May 15, 2026 | In progress issued Jun 2026 | 120 Kearny St | Principal Builders Inc. | 24th fl - revision to pa 202602115770 minor plumbing updatesDetails
24th fl - revision to pa 202602115770 minor plumbing updates | |
| May 6, 2026 | Completed final sign-off Aug 2026 | 595 Pacific Av | Principal Builders Inc. | level 2; revision to pa#: 202602246389 and deferred mep. revised existing wall layouts to mof 256 and conference room 257. revised room function 210 with new supporting power and data layout.Details
level 2; revision to pa#: 202602246389 and deferred mep. revised existing wall layouts to mof 256 and conference room 257. revised room function 210 with new supporting power and data layout. | $849,601 |
| May 4, 2026 | Completed final sign-off Jun 2026 | 555 California St | Principal Builders Inc. | 38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork.Details
38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork. | $49,000 |
| Apr 30, 2026 | Completed final sign-off Jul 2026 | 120 Kearny St | Principal Builders Inc. | level 20. revision to 202602115767. addition of 11 new phonebooths, minor mep, millwork updates.Details
level 20. revision to 202602115767. addition of 11 new phonebooths, minor mep, millwork updates. | $20,000 |
| Apr 30, 2026 | In progress issued May 2026 | 120 Kearny St | Principal Builders Inc. | l24: revision to pa# 202602115770. demolish (e) door & minor upgrades to millwork and finishes, updated dimensions for closet & interior window.Details
l24: revision to pa# 202602115770. demolish (e) door & minor upgrades to millwork and finishes, updated dimensions for closet & interior window. | |
| Apr 29, 2026 | Completed final sign-off Jun 2026 | 1800 Owens St | Principal Builders Inc. | installation of phone booths in sector 2 fl, 4 & 5 & sector 3 fls, 5,7Details
installation of phone booths in sector 2 fl, 4 & 5 & sector 3 fls, 5,7 | $150,000 |
| Apr 27, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | 3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area.Details
3rd floor interior tenant improvement to include new barista bar serving coffee, tea and grab & go prepackaged food. new back of house catering area. | $48,000 |
| Apr 24, 2026 | Completed final sign-off Jul 2026 | 45 Fremont St | Principal Builders Inc. | installation of phonebooths on - 4 on level 7 and 4 on level 8Details
installation of phonebooths on - 4 on level 7 and 4 on level 8 | $95,000 |
| Apr 22, 2026 | Completed final sign-off Aug 2026 | 1800 Owens St | Principal Builders Inc. | sector 3/c floor 5, new walk in coolers.Details
sector 3/c floor 5, new walk in coolers. | $450,000 |
| Apr 22, 2026 | In progress issued May 2026 | 840 Battery St | Principal Builders Inc. | per ab-017- demo of non structrual partitions ceilings, light fixtures, millwork, finishesDetails
per ab-017- demo of non structrual partitions ceilings, light fixtures, millwork, finishes | $195,000 |
| Apr 20, 2026 | In progress issued Jul 2026 | 149 New Montgomery St | Principal Builders Inc. | commercial tenant improvement of (e) floors 5 & 6.Details
commercial tenant improvement of (e) floors 5 & 6. | $5,670,000 |
| Apr 20, 2026 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 10th & 11th fl - evac mapsDetails
10th & 11th fl - evac maps | $958 |
| Apr 20, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Principal Builders Inc. | 4/f: commercial ti of (e) 4th floor. scope of work includes partial demo of interior non-bearing walls, ceilings, light fixtures and (e) flooring. new construction of non-bearing walls, finishes, power (as required), and associated mep improvements.Details
4/f: commercial ti of (e) 4th floor. scope of work includes partial demo of interior non-bearing walls, ceilings, light fixtures and (e) flooring. new construction of non-bearing walls, finishes, power (as required), and associated mep improvements. | $3,270,000 |
| Apr 16, 2026 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at elevator lobby doorsDetails
revision to 202512222392 10th/f & 202512151826 11th/f: showing shaft due to unforseen conditions, power & lighting refiguration. lighting & ceiling modification, add emergency release buttom at elevator lobby doors | |
| Apr 7, 2026 | In progress issued May 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | l1-l4, evac maps for level 1-4.Details
l1-l4, evac maps for level 1-4. | |
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal.Details
all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal. | $940,000 |
| Mar 11, 2026 | Completed final sign-off Jul 2026 | 595 Pacific Av | Principal Builders Inc. | l3: revision to pa #202601284695: revised booth locations and structural attachments of phone boothsDetails
l3: revision to pa #202601284695: revised booth locations and structural attachments of phone booths | |
| Feb 24, 2026 | Completed final sign-off Aug 2026 | 595 Pacific Av | Principal Builders Inc. | 2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferredDetails
2nd fl - office ti installation of new non-bearing partitions, ceilings, power/data and finishes. structural & mep deferred | $1,407,813 |
| Feb 12, 2026 | Completed final sign-off Jun 2026 | 1800 Owens St | Principal Builders Inc. | lb4: minor modifications to existing open area. l5b: minor modifications to existing pantry. l6c: minor modifications to existing servery soft and islands, walkin cooler in bo#: servery. l7c: new finishes, ceiling, and food service equipment at (e) storage.Details
lb4: minor modifications to existing open area. l5b: minor modifications to existing pantry. l6c: minor modifications to existing servery soft and islands, walkin cooler in bo#: servery. l7c: new finishes, ceiling, and food service equipment at (e) storage. | $150,000 |
| Feb 11, 2026 | Completed final sign-off Jul 2026 | 120 Kearny St | Principal Builders Inc. | 20/f: ti demo (e) + (n) partitions, break area, meeting rooms, mep finishes.Details
20/f: ti demo (e) + (n) partitions, break area, meeting rooms, mep finishes. | $500,000 |
| Feb 11, 2026 | In progress issued Apr 2026 | 120 Kearny St | Principal Builders Inc. | l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep.Details
l24. ti demo of existing non-structural partitions, millwork, finishes, and new non-structural partitions, millwork, finishes, mep. | $1,411,768 |
| Feb 10, 2026 | Completed final sign-off Jul 2026 | 595 Pacific Av | Principal Builders Inc. | 3/fl- deferred mep associated with 202601284695Details
3/fl- deferred mep associated with 202601284695 | $50,000 |
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 1 Sansome St | Principal Builders Inc. | 37th floor ti renovation of (e) breakroom: occ load from 23 to 32.Details
37th floor ti renovation of (e) breakroom: occ load from 23 to 32. | $109,000 |
| Feb 4, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | floor 31-33- 202507110624 and ref 202601284713 to capture as built detailsDetails
floor 31-33- 202507110624 and ref 202601284713 to capture as built details | |
| Jan 28, 2026 | Completed final sign-off Jul 2026 | 595 Pacific Av | Principal Builders Inc. | 3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred.Details
3rd floor: ti non-structural partitions , ceiling power data and finishes. mep deferred. | $652,080 |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4Details
structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4 | |
| Jan 27, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.Details
partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas. | $588,286 |
| Jan 27, 2026 | In progress issued May 2026 | 555 California St | Principal Builders Inc. | partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.Details
partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas. | $1,170,366 |
| Jan 26, 2026 | Completed final sign-off Feb 2026 | 1515 03rd St | Principal Builders Inc. | to obtain final inspection for work approved under pa# 202410112789. all work is complete.Details
to obtain final inspection for work approved under pa# 202410112789. all work is complete. | |
| Jan 20, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areasDetails
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| Jan 15, 2026 | Completed final sign-off Jun 2026 | 120 Kearny St | Principal Builders Inc. | 21/fl- revision 202511189893- add 3 (n) phonebooths, fire sprinkler and alarm submittal deferredDetails
21/fl- revision 202511189893- add 3 (n) phonebooths, fire sprinkler and alarm submittal deferred | $16,500 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 41/fl- new communicating stair between floors 40 and 41.Details
41/fl- new communicating stair between floors 40 and 41. | $42,600 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floorDetails
39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor | $15,000 |
| Jan 7, 2026 | Completed final sign-off May 2026 | 1 Embarcadero Center | Principal Builders Inc. | 32/fl- defferred submittal from 202510217760 for operable partitionDetails
32/fl- defferred submittal from 202510217760 for operable partition | |
| Dec 23, 2025 | In progress issued Apr 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | l1 - l4. electrical only revision to approved pa# 202503172334.Details
l1 - l4. electrical only revision to approved pa# 202503172334. | |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080.Details
10/f. t.i (n) non structural partitions, ceiling, finishes, fixtures. demo under pa# 202511069080. | $3,900,000 |
| Dec 16, 2025 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.Details
l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| Dec 15, 2025 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafeDetails
11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe | $4,000,000 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512.Details
suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512. | |
| Dec 8, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | l5-l6: evav maps for levels 5 & 6Details
l5-l6: evav maps for levels 5 & 6 | $3,500 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1455 03rd St | Principal Builders Inc. | 11/f: (n) power signal devices for phone booths. ref#2025-0617-8877Details
11/f: (n) power signal devices for phone booths. ref#2025-0617-8877 | $1,938 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1455 03rd St | Principal Builders Inc. | 2/f: (n) power signal devices for phone booths. ref#2025-0617-8874Details
2/f: (n) power signal devices for phone booths. ref#2025-0617-8874 | $3,774 |
| Nov 25, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revised details to illustrate design changes to exteior security wall. added cdu and thermal chamber both for future installation ref#: 202504043753Details
revised details to illustrate design changes to exteior security wall. added cdu and thermal chamber both for future installation ref#: 202504043753 | $10,000 |
| Nov 24, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202510177584. update structural details including cross sections, concrete pavement, handrail details, and rebar placement.Details
revision to 202510177584. update structural details including cross sections, concrete pavement, handrail details, and rebar placement. | |
| Nov 21, 2025 | In progress issued Nov 2025 | 1455 03rd St | Principal Builders Inc. | revision to bpa: 202506178877. revised phone booth layout on level 11. eliminate scope of work on level 10Details
revision to bpa: 202506178877. revised phone booth layout on level 11. eliminate scope of work on level 10 | |
| Nov 18, 2025 | Completed final sign-off Jun 2026 | 120 Kearny St | Principal Builders Inc. | 21/fl- relocating 4 (e) phone boothsDetails
21/fl- relocating 4 (e) phone booths | $22,000 |
| Nov 18, 2025 | In progress issued Nov 2025 | 1455 03rd St | Principal Builders Inc. | revision to pa#: 202506178874. revised phone booth layout on 2nd floorDetails
revision to pa#: 202506178874. revised phone booth layout on 2nd floor | |
| Nov 6, 2025 | Completed final sign-off Jun 2026 | 221 Main St | Principal Builders Inc. | 10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017Details
10/fl: demo existing non structured partitions, ceilings, lights fixtures, millwork and finishes per ab-017 | $176,364 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 221 Main St | Principal Builders Inc. | 11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017Details
11/f: demo at non-structural partitions, ceilings, lights fixtures, millwork and finishes. per ab017 | $179,229 |
| Nov 4, 2025 | Completed final sign-off May 2026 | 1 Embarcadero Center | Principal Builders Inc. | 32nd and 33rd/f - deferred mep submittal per ti. ref pa# 202510217760Details
32nd and 33rd/f - deferred mep submittal per ti. ref pa# 202510217760 | $301,104 |
| Oct 29, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202503111984: removal of fsd-5-25 & fsd 5-26 from schedule & plans, mechanical schedule only scopeDetails
revision to 202503111984: removal of fsd-5-25 & fsd 5-26 from schedule & plans, mechanical schedule only scope | |
| Oct 21, 2025 | Completed final sign-off May 2026 | 1 Embarcadero Center | Principal Builders Inc. | 32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately. (bldg is fully sprinklered)Details
32nd and 33rd floors: t.i. include the removal of non structural partitions and new non-structural partition, doors millwork and finishes. all new or revised hvac electrical, plumbing and life safety work will be design build and submitted separately. (bldg is fully sprinklered) | |
| Oct 17, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to bpa: 202503172334. exterior door updates and new exterior ramp; minor interior geometry. revision and incorporate fitness room requipment, update raised floor detail and to 2 hour rated library, window detail. across levels 1,2,3,4Details
revision to bpa: 202503172334. exterior door updates and new exterior ramp; minor interior geometry. revision and incorporate fitness room requipment, update raised floor detail and to 2 hour rated library, window detail. across levels 1,2,3,4 | |
| Sep 24, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | 31 and 32/fl- deferred submittal 202507110624 for stair pan and connectionDetails
31 and 32/fl- deferred submittal 202507110624 for stair pan and connection | |
| Sep 23, 2025 | In progress issued Nov 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | 1-4/fl- deferred submittal for sfdph food service review only ref 202503172334Details
1-4/fl- deferred submittal for sfdph food service review only ref 202503172334 | |
| Sep 16, 2025 | Expired or cancelled cancelled May 2026 | 650 07th St | Principal Builders Inc. | interior ti of ground fl existing office space. mechanical deferred.Details
interior ti of ground fl existing office space. mechanical deferred. | $250,000 |
| Sep 5, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to 202503112039 to incorporate 2) new executive offices w/ watiting rooms & modified restroom layoutDetails
revision to 202503112039 to incorporate 2) new executive offices w/ watiting rooms & modified restroom layout | $500 |
| Sep 2, 2025 | Expired or cancelled cancelled May 2026 | 650 07th St | Principal Builders Inc. | level 1,2,3: new partition construction for mechanical shaffs & partial demo of e) floors. new mech equipment, ductwork at roofDetails
level 1,2,3: new partition construction for mechanical shaffs & partial demo of e) floors. new mech equipment, ductwork at roof | $450,000 |
| Aug 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | 31st floor: interior office tenant improvement with associated mepDetails
31st floor: interior office tenant improvement with associated mep | $1,627,500 |
| Aug 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | 32nd floor: interior office tenant improvement with associated mepDetails
32nd floor: interior office tenant improvement with associated mep | $3,472,000 |
| Aug 13, 2025 | In progress issued Sep 2025 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to pa#: 202504043753. to modify assembly for (e) security wall in room 1124, and to add new security wall in room 1123.Details
revision to pa#: 202504043753. to modify assembly for (e) security wall in room 1124, and to add new security wall in room 1123. | $278,168 |
| Aug 8, 2025 | Completed final sign-off Apr 2026 | 1455 03rd St | Principal Builders Inc. | installation of new miillwork and finishes to replace existing, in existing micro kitchen at level 2Details
installation of new miillwork and finishes to replace existing, in existing micro kitchen at level 2 | $189,800 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | 25/f, ste 2500. ref arch set #202507160935. mep for this project.Details
25/f, ste 2500. ref arch set #202507160935. mep for this project. | $2,900,000 |
| Aug 6, 2025 | In progress issued Aug 2025 | 1455 03rd St | Principal Builders Inc. | level 2: deferred mep for 202506108373Details
level 2: deferred mep for 202506108373 | $80,640 |
| Aug 6, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | temporary lobby at level 1 to facilitate building entry and access to levels 5 and 6 once they are complete. during which the time levels 1-4 will still be under construction.Details
temporary lobby at level 1 to facilitate building entry and access to levels 5 and 6 once they are complete. during which the time levels 1-4 will still be under construction. | $100,000 |
| Aug 5, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 3rd & 5th fl/ l3 and l5: new power and signal devices throughout space.Details
3rd & 5th fl/ l3 and l5: new power and signal devices throughout space. | $15,000 |
| Jul 31, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Principal Builders Inc. | floor 33- ti non structural (partitions, fixtures, floors, ceilings, and mep) structural for operable partitions.Details
floor 33- ti non structural (partitions, fixtures, floors, ceilings, and mep) structural for operable partitions. | $2,886,100 |
| Jul 18, 2025 | Expired or cancelled cancelled May 2026 | 650 07th St | Principal Builders Inc. | 2nd & 3rd floor - partial demo of existing non structural partitions for pass through; brick wall to receive partial demo and new concrete portal reinforcement assembly for new openingsDetails
2nd & 3rd floor - partial demo of existing non structural partitions for pass through; brick wall to receive partial demo and new concrete portal reinforcement assembly for new openings | $75,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2026 | 550 Terry A Francois Bl | Principal Builders Inc. | revision to approved pa #202503111984. to incorporate a horizontal exit to accomodate additional loading. minor additional revisions included and clouded.Details
revision to approved pa #202503111984. to incorporate a horizontal exit to accomodate additional loading. minor additional revisions included and clouded. | $10,000 |