Permit GraphShortlistSan Francisco building permits since 2000

Alexander Jermyn

License
C32883
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, designer
Firm
Alexander Jermyn Architecture
Based in
Berkeley
On San Francisco permits
Jun 2013 to Mar 2026

9 permits since 2000 (architect on 8 permits, designer on 1 permit): 8 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Gci, Inc (3), Mc Cutcheon Construction Co. (2), Lynch Construction Inc, Principal Builders Inc.
Architects
Mark Douglas Brand, Mark Thomas

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 18, 2026Completed
final sign-off Sep 2026
50 Hawthorne StPrincipal Builders Inc.all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal.
Details
Permit
202603187875
Permit issued
Apr 7, 2026
Final sign-off
Sep 23, 2026

all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal.

Open the permit page

$940,000
Aug 11, 2017Completed
final sign-off Feb 2018
4037 22nd StMc Cutcheon Construction Co.revision to pa# 2014/11/19/1909. garage door design revision. window lites added to door panels.
Details
Permit
201708114626
Permit issued
Nov 15, 2017
Final sign-off
Feb 2, 2018

revision to pa# 2014/11/19/1909. garage door design revision. window lites added to door panels.

Open the permit page

$500
Aug 15, 2016Completed
final sign-off Feb 2017
180 Sutter StGci, Incground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit.
Details
Permit
201608155010
Permit issued
Aug 22, 2016
Final sign-off
Feb 9, 2017

ground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit.

Open the permit page

$480,000
Jun 30, 2016Completed
final sign-off Jul 2019
180 Sutter StGci, Incerect two non electric single face wall signs on south & west elevations.
Details
Permit
201606301330
Permit issued
Apr 4, 2018
Final sign-off
Jul 10, 2019

erect two non electric single face wall signs on south & west elevations.

Open the permit page

$5,000
Jun 30, 2016Expired or cancelled
withdrawn Dec 2017
180 Sutter Sterect non electric single face wall sign.
Details
Permit
201606301333

erect non electric single face wall sign.

Open the permit page

$3,000
Jun 30, 2016Completed
final sign-off Apr 2019
180 Sutter Stnew front entry doors. no other construction work.
Details
Permit
201606301322
Permit issued
Apr 4, 2018
Final sign-off
Apr 15, 2019

new front entry doors. no other construction work.

Open the permit page

$10,000
Aug 31, 2015Completed
final sign-off Dec 2015
901 Castro StLynch Construction Incchange of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards.
Details
Permit
201508315631
Permit issued
Sep 1, 2015
Final sign-off
Dec 11, 2015

change of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards.

Open the permit page

$21,000
Nov 19, 2014Completed
final sign-off Feb 2018
4037 22nd StMc Cutcheon Construction Co.horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbath
Details
Permit
201411191909
Permit issued
Sep 29, 2016
Final sign-off
Feb 2, 2018

horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbath

Open the permit page

$313,000
Jun 5, 2013Completed
final sign-off Mar 2014
140 New Montgomery StGci, Inc25th floor tenant improvement of existing office, showroom, pentry, conference rooms open office area. sprinkler & fire alarm on separate permit.
Details
Permit
201306058737
Permit issued
Jun 18, 2013
Final sign-off
Mar 18, 2014

25th floor tenant improvement of existing office, showroom, pentry, conference rooms open office area. sprinkler & fire alarm on separate permit.

Open the permit page

$450,000