Alexander Jermyn
- Listed as
- architect, designer
- Firm
- Alexander Jermyn Architecture
- Based in
- Berkeley
- On San Francisco permits
- Jun 2013 to Mar 2026
9 permits since 2000 (architect on 8 permits, designer on 1 permit): 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 50 Hawthorne St | Principal Builders Inc. | all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal.Details
all floors: interior tenant improvement to include non-structural partitions, new ceilings, and associated electrical, lighting, plumbing, and new finishes throughout area of work. new millwork elements and new furniture. mep, fire life safety to be deferred submittal. | $940,000 |
| Aug 11, 2017 | Completed final sign-off Feb 2018 | 4037 22nd St | Mc Cutcheon Construction Co. | revision to pa# 2014/11/19/1909. garage door design revision. window lites added to door panels.Details
revision to pa# 2014/11/19/1909. garage door design revision. window lites added to door panels. | $500 |
| Aug 15, 2016 | Completed final sign-off Feb 2017 | 180 Sutter St | Gci, Inc | ground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit.Details
ground flr: ti- new tenant. work includes new partitions, fixtures, finishes, new bathrooms, pantry, mep. no exterior work, fire protection under sep permit. | $480,000 |
| Jun 30, 2016 | Completed final sign-off Apr 2019 | 180 Sutter St | new front entry doors. no other construction work.Details
new front entry doors. no other construction work. | $10,000 | |
| Jun 30, 2016 | Expired or cancelled withdrawn Dec 2017 | 180 Sutter St | erect non electric single face wall sign.Details
erect non electric single face wall sign. | $3,000 | |
| Jun 30, 2016 | Completed final sign-off Jul 2019 | 180 Sutter St | Gci, Inc | erect two non electric single face wall signs on south & west elevations.Details
erect two non electric single face wall signs on south & west elevations. | $5,000 |
| Aug 31, 2015 | Completed final sign-off Dec 2015 | 901 Castro St | Lynch Construction Inc | change of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards.Details
change of occupancy from m occupancy to b ocupancy. remodel of existing commercial space to incorporate 5 rooms. no work to existing bathroom or kitchen area. electrical work: adding receptacles, lighting, new doors, trim, baseboards. | $21,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2018 | 4037 22nd St | Mc Cutcheon Construction Co. | horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbathDetails
horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbath | $313,000 |
| Jun 5, 2013 | Completed final sign-off Mar 2014 | 140 New Montgomery St | Gci, Inc | 25th floor tenant improvement of existing office, showroom, pentry, conference rooms open office area. sprinkler & fire alarm on separate permit.Details
25th floor tenant improvement of existing office, showroom, pentry, conference rooms open office area. sprinkler & fire alarm on separate permit. | $450,000 |