Kevin Holtberg
- License
- C92760
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C92760 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Switchback Enterprises, Inc
- Based in
- Lockeford
- On San Francisco permits
- Jul 2025 to Jun 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Herrero Builders Incorporated (2), Principal Builders Inc.
- Architects
- Sujendra Mishra (2), Michael Zelazek
- Engineers
- Allen Scott Nudell, Jesus B Cabellon Jr
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jul 2026 | 2545 16th St | Principal Builders Inc. | deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and rampsDetails
deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and ramps | |
| Sep 19, 2025 | Completed final sign-off Oct 2025 | 2300 California St | Herrero Builders Incorporated | revision to pa # 2025-0731-2073. changes include 1/2" strong bolt- 2 wedge anchors have been revised to 1/2" titen anchors with approve from structural engineer of record.Details
revision to pa # 2025-0731-2073. changes include 1/2" strong bolt- 2 wedge anchors have been revised to 1/2" titen anchors with approve from structural engineer of record. | |
| Jul 31, 2025 | Completed final sign-off Oct 2025 | 2300 California St | Herrero Builders Incorporated | level 1: finish and millwork updates to treatment rooms, office, and storage areas. modifications to light fixtures in treatement rooms, door modification in office and new wing wall in waiting area. update to restroom accessories. restriping parking.Details
level 1: finish and millwork updates to treatment rooms, office, and storage areas. modifications to light fixtures in treatement rooms, door modification in office and new wing wall in waiting area. update to restroom accessories. restriping parking. | $180,654 |