Block 8721, lot 033
1455 03rd St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
144 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Jul 2026 | 1455 03rd St | Principal Builders Inc. | assembly permit associated with pa 202508082619 & 202404129924Details
assembly permit associated with pa 202508082619 & 202404129924 | |
| May 19, 2026 | Completed final sign-off Jun 2026 | 1455 03rd St | Siemens Industry, Inc. | fire only work to obtain an as built permit for the phone booth additions on the floors 10 and 11 under 202506178877. all phone booths on floor 10 and 2 phone booths on floor 9 were not installed under 202511210211. 10 strobes were not installed due to the booth removals.Details
fire only work to obtain an as built permit for the phone booth additions on the floors 10 and 11 under 202506178877. all phone booths on floor 10 and 2 phone booths on floor 9 were not installed under 202511210211. 10 strobes were not installed due to the booth removals. | |
| Feb 26, 2026 | In progress issued Feb 2026 | 1455 03rd St | Siemens Industry, Inc. | 2/f: as-built fire alarm for conference area remodel on 2/f. 1 duct detector and 1 module were added to o/g f/a pa 202507170998., mech refe# 202508062463Details
2/f: as-built fire alarm for conference area remodel on 2/f. 1 duct detector and 1 module were added to o/g f/a pa 202507170998., mech refe# 202508062463 | $3,279 |
| Jan 16, 2026 | Completed final sign-off Apr 2026 | 1455 03rd St | Siemens Industry, Inc. | 9th fl - fire only work for the phone booth additions on floor 9 under pa 202506178881. additions are strobesDetails
9th fl - fire only work for the phone booth additions on floor 9 under pa 202506178881. additions are strobes | $4,347 |
| Jan 9, 2026 | Completed final sign-off Jun 2026 | 1455 03rd St | Siemens Industry, Inc. | 10th & 11th fl ref pa# 2025-0617-8877: 15 strobes are being addedDetails
10th & 11th fl ref pa# 2025-0617-8877: 15 strobes are being added | $9,315 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1455 03rd St | Siemens Industry, Inc. | floor 2; fire only work for the phone booth additions on floor 2 under ref#: 202506178874; 4 strobes are added for 4 boothsDetails
floor 2; fire only work for the phone booth additions on floor 2 under ref#: 202506178874; 4 strobes are added for 4 booths | $2,484 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 1455 03rd St | Siemens Industry, Inc. | floor 4; fire only work for the phone booth additions on floor 4 under ref#: 202506178882; 2 strobes are added and 2 strobes for 4 boothsDetails
floor 4; fire only work for the phone booth additions on floor 4 under ref#: 202506178882; 2 strobes are added and 2 strobes for 4 booths | $2,484 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 1455 03rd St | R L H Fire Protection Inc | 11th fl - ti sprinkler add 5 sprinklers ti pa 202506178877 & 202511210211 (revision)Details
11th fl - ti sprinkler add 5 sprinklers ti pa 202506178877 & 202511210211 (revision) | $8,100 |
| Dec 12, 2025 | In progress issued Dec 2025 | 1455 03rd St | Siemens Industry, Inc. | level 8; fire only work for air distribution alteration on level 8; pa: 202507221295; 1 relay module added for shutdown of 2 fcu.Details
level 8; fire only work for air distribution alteration on level 8; pa: 202507221295; 1 relay module added for shutdown of 2 fcu. | $600 |
| Dec 12, 2025 | Completed final sign-off Jan 2026 | 1455 03rd St | Siemens Industry, Inc. | level 3; fire only work for the it room remodel on level 3 done under pa: 202506108366; 1 smoke detector and 1 speaker/strobe are relocated (no new devices).Details
level 3; fire only work for the it room remodel on level 3 done under pa: 202506108366; 1 smoke detector and 1 speaker/strobe are relocated (no new devices). | $1,681 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1455 03rd St | Principal Builders Inc. | 11/f: (n) power signal devices for phone booths. ref#2025-0617-8877Details
11/f: (n) power signal devices for phone booths. ref#2025-0617-8877 | $1,938 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1455 03rd St | Principal Builders Inc. | 2/f: (n) power signal devices for phone booths. ref#2025-0617-8874Details
2/f: (n) power signal devices for phone booths. ref#2025-0617-8874 | $3,774 |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 1455 03rd St | Siemens Industry, Inc. | 1st fl - fire only work for the bike storage remodel under pa 202506239234 additions are 4 speaker/strobes and 1 moduleDetails
1st fl - fire only work for the bike storage remodel under pa 202506239234 additions are 4 speaker/strobes and 1 module | $4,445 |
| Nov 21, 2025 | Completed final sign-off Mar 2026 | 1455 03rd St | R L H Fire Protection Inc | level 9: t.i fire sprinkler. add 7 fire sprinklers. ref t.i permit 202506178881Details
level 9: t.i fire sprinkler. add 7 fire sprinklers. ref t.i permit 202506178881 | $4,500 |
| Nov 21, 2025 | In progress issued Nov 2025 | 1455 03rd St | Principal Builders Inc. | revision to bpa: 202506178877. revised phone booth layout on level 11. eliminate scope of work on level 10Details
revision to bpa: 202506178877. revised phone booth layout on level 11. eliminate scope of work on level 10 | |
| Nov 21, 2025 | In progress issued Dec 2025 | 1455 03rd St | R L H Fire Protection Inc | level 4: t.i fire sprinkler. add 4 fire sprinklers. ref t.i permit 202506178882Details
level 4: t.i fire sprinkler. add 4 fire sprinklers. ref t.i permit 202506178882 | $2,500 |
| Nov 21, 2025 | In progress issued Dec 2025 | 1455 03rd St | R L H Fire Protection Inc | 2nd fl ref pa # 2025-0617-8874: ti fire sprinkler. add 4 fire sprinklers.Details
2nd fl ref pa # 2025-0617-8874: ti fire sprinkler. add 4 fire sprinklers. | $2,500 |
| Nov 18, 2025 | In progress issued Nov 2025 | 1455 03rd St | Principal Builders Inc. | revision to pa#: 202506178874. revised phone booth layout on 2nd floorDetails
revision to pa#: 202506178874. revised phone booth layout on 2nd floor | |
| Nov 10, 2025 | In progress issued Nov 2025 | 1455 03rd St | Siemens Industry, Inc. | fire only work to replace 4 existing beam detector sets at the atriums of floor, 2,3,6& 9; 4 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system addition only)Details
fire only work to replace 4 existing beam detector sets at the atriums of floor, 2,3,6& 9; 4 power supplies & 4 modules are also added. no associated remodel or ref permit number. (fire alarm system addition only) | $29,990 |
| Oct 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Acco Engineered Systems Inc. Dba Acco En | 3rd floor: addition of one under floor vav box and alteration of lowside air distribution in area of work. ref pa #202506108366Details
3rd floor: addition of one under floor vav box and alteration of lowside air distribution in area of work. ref pa #202506108366 | $40,000 |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 1455 03rd St | R L H Fire Protection Inc | 1st fl - as built revision to approved fire sprinkler ref pa 202508294190 add 1, relocate 2 fire sprinklersDetails
1st fl - as built revision to approved fire sprinkler ref pa 202508294190 add 1, relocate 2 fire sprinklers | $1,200 |
| Sep 17, 2025 | Completed final sign-off Nov 2025 | 1455 03rd St | R L H Fire Protection Inc | 2nd fl - ti sprinklers add 3, delete 3, relocate 3 fire sprinklers ref pa 202508082619Details
2nd fl - ti sprinklers add 3, delete 3, relocate 3 fire sprinklers ref pa 202508082619 | $2,700 |
| Aug 29, 2025 | In progress issued Aug 2025 | 1455 03rd St | R L H Fire Protection Inc | 1/f: t.i fire sprinkler. relocate 13 fire sprinklers. t.i #202506239234Details
1/f: t.i fire sprinkler. relocate 13 fire sprinklers. t.i #202506239234 | $3,500 |
| Aug 29, 2025 | Completed final sign-off Jan 2026 | 1455 03rd St | R L H Fire Protection Inc | 2/f: t.i fire sprinkler. relocate 11, add 2, delete 4. t.i #202506108373Details
2/f: t.i fire sprinkler. relocate 11, add 2, delete 4. t.i #202506108373 | $4,500 |
| Aug 29, 2025 | In progress issued Aug 2025 | 1455 03rd St | R L H Fire Protection Inc | 3/f: t.i fire sprinkler. relocate 5 fire sprinklers. t.i #202506108366Details
3/f: t.i fire sprinkler. relocate 5 fire sprinklers. t.i #202506108366 | $1,500 |
| Aug 8, 2025 | Completed final sign-off Apr 2026 | 1455 03rd St | Principal Builders Inc. | installation of new miillwork and finishes to replace existing, in existing micro kitchen at level 2Details
installation of new miillwork and finishes to replace existing, in existing micro kitchen at level 2 | $189,800 |
| Aug 6, 2025 | In progress issued Aug 2025 | 1455 03rd St | Principal Builders Inc. | level 2: deferred mep for 202506108373Details
level 2: deferred mep for 202506108373 | $80,640 |
| Aug 5, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 3rd & 5th fl/ l3 and l5: new power and signal devices throughout space.Details
3rd & 5th fl/ l3 and l5: new power and signal devices throughout space. | $15,000 |
| Jul 22, 2025 | In progress issued Jul 2025 | 1455 03rd St | Acco Engineered Systems Inc. Dba Acco En | level 8: alteration of new lowside air distribution for conferenceDetails
level 8: alteration of new lowside air distribution for conference | $84,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 1455 03rd St | Siemens Industry, Inc. | 2nd floor; fire only work for the conference area remodel on floor 2 under pa#: 202506108373; additonal are 5 speaker/strobes.Details
2nd floor; fire only work for the conference area remodel on floor 2 under pa#: 202506108373; additonal are 5 speaker/strobes. | $4,805 |
| Jun 23, 2025 | Completed final sign-off Jan 2026 | 1455 03rd St | Principal Builders Inc. | 1/f: provide new bike storage - demo of ceiling & finishes. minor alteration to the (e) room including non-load bearing partitions, suspended ceilings, new millwork.Details
1/f: provide new bike storage - demo of ceiling & finishes. minor alteration to the (e) room including non-load bearing partitions, suspended ceilings, new millwork. | $750,000 |
| Jun 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Principal Builders Inc. | 4th floor: installation of phone booth and workstation & structural and electricalDetails
4th floor: installation of phone booth and workstation & structural and electrical | $30,000 |
| Jun 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Principal Builders Inc. | 10th and 11th floors: installation of phone booth and workstation & structural and electricalDetails
10th and 11th floors: installation of phone booth and workstation & structural and electrical | $30,000 |
| Jun 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Principal Builders Inc. | 2nd floor: installation of phone booth and workstation & structural and electricalDetails
2nd floor: installation of phone booth and workstation & structural and electrical | $30,000 |
| Jun 17, 2025 | Completed final sign-off Jan 2026 | 1455 03rd St | Principal Builders Inc. | 7th fl ti: demo of door, finishes, millwork. new finishes and light fixtures.Details
7th fl ti: demo of door, finishes, millwork. new finishes and light fixtures. | $150,000 |
| Jun 17, 2025 | In progress issued Oct 2025 | 1455 03rd St | Principal Builders Inc. | 9th floor: installation of phone booth and workstation & structural and electricalDetails
9th floor: installation of phone booth and workstation & structural and electrical | $30,000 |
| Jun 10, 2025 | Completed final sign-off Apr 2026 | 1455 03rd St | Principal Builders Inc. | l2: demo of existing ceiling, partitions, millwork, & minor alterations to the existing office including non-load bearing partitions. suspended ceiling, new millwork, and finishes, and selective new light fixture. mep deffered.Details
l2: demo of existing ceiling, partitions, millwork, & minor alterations to the existing office including non-load bearing partitions. suspended ceiling, new millwork, and finishes, and selective new light fixture. mep deffered. | $750,000 |
| Jun 10, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | l3 and l5: demo of existing ceiling, partitions, millwork, and minor alterations to the (e) office including non-load bearing partitions, suspended ceiling, new millwork and finishes, and selective new light fixture.Details
l3 and l5: demo of existing ceiling, partitions, millwork, and minor alterations to the (e) office including non-load bearing partitions, suspended ceiling, new millwork and finishes, and selective new light fixture. | $580,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 1455 03rd St | R L H Fire Protection Inc | ti fire sprinkler, 8/f, add 18 and relocate 1 fire sprinklers. 9/f: add 12 and relocate 1 fire sprinklers. t.i #202501238912Details
ti fire sprinkler, 8/f, add 18 and relocate 1 fire sprinklers. 9/f: add 12 and relocate 1 fire sprinklers. t.i #202501238912 | $20,000 |
| Mar 28, 2025 | In progress issued Mar 2025 | 1455 03rd St | Siemens Industry, Inc. | 8th * 9th floors - fire only work for the phone booth installations under pa 202501238912. additions are 28 strobesDetails
8th * 9th floors - fire only work for the phone booth installations under pa 202501238912. additions are 28 strobes | $17,388 |
| Mar 28, 2025 | In progress issued Mar 2025 | 1455 03rd St | Siemens Industry, Inc. | fire only work for the phone booth installations on floors 2 and 3 under 202501238909. additions are 21 strobes.Details
fire only work for the phone booth installations on floors 2 and 3 under 202501238909. additions are 21 strobes. | $13,041 |
| Mar 28, 2025 | In progress issued Mar 2025 | 1455 03rd St | Siemens Industry, Inc. | fire only work for the phone booth installations on floors 6 and 7 under 202501238911. addition are 19 strobesDetails
fire only work for the phone booth installations on floors 6 and 7 under 202501238911. addition are 19 strobes | $11,800 |
| Mar 28, 2025 | In progress issued Mar 2025 | 1455 03rd St | Siemens Industry, Inc. | fire only work for the phone booth installations on floors 10 & 11 under pa 202501238907. additions are 26 strobesDetails
fire only work for the phone booth installations on floors 10 & 11 under pa 202501238907. additions are 26 strobes | $16,146 |
| Mar 28, 2025 | Completed final sign-off Aug 2025 | 1455 03rd St | R L H Fire Protection Inc | ti fire sprinkler, 10/f, add 14 and relocate 1 fire sprinklers. 11/f: add 15 and relocate 2 fire sprinklers. t.i #202501238907Details
ti fire sprinkler, 10/f, add 14 and relocate 1 fire sprinklers. 11/f: add 15 and relocate 2 fire sprinklers. t.i #202501238907 | $20,000 |
| Mar 28, 2025 | In progress issued Mar 2025 | 1455 03rd St | Siemens Industry, Inc. | 4th & 5th fl ref pa #2025-0123-8910 fire only work for the phone booth installations. add 14 strobesDetails
4th & 5th fl ref pa #2025-0123-8910 fire only work for the phone booth installations. add 14 strobes | $8,694 |
| Mar 27, 2025 | In progress issued Mar 2025 | 1455 03rd St | R L H Fire Protection Inc | ti fire sprinkler. 4/f: add 12 fire sprinklers & relocate 1 fire sprinklers. 5/f: add 8 and relcate 1 fire sprinkers. t.i 202501238910Details
ti fire sprinkler. 4/f: add 12 fire sprinklers & relocate 1 fire sprinklers. 5/f: add 8 and relcate 1 fire sprinkers. t.i 202501238910 | $14,500 |
| Mar 27, 2025 | Completed final sign-off May 2025 | 1455 03rd St | R L H Fire Protection Inc | ti fire sprinlers: 2nd/fl: add 05 fire spsrinklers. 3rd/fl: add 17 and relocate 01 fire sprinklers. ti ref 202501238909Details
ti fire sprinlers: 2nd/fl: add 05 fire spsrinklers. 3rd/fl: add 17 and relocate 01 fire sprinklers. ti ref 202501238909 | $14,500 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 1455 03rd St | R L H Fire Protection Inc | 6th & 7th ti fire sprinkler 6th fl - add 12 & relocate 01 fire sprinklers; 7th fl - add 09 & relocate 01 fire sprinklers. ref pa 202501238911Details
6th & 7th ti fire sprinkler 6th fl - add 12 & relocate 01 fire sprinklers; 7th fl - add 09 & relocate 01 fire sprinklers. ref pa 202501238911 | $13,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 6th & 7th fl - install phone structural & electricalDetails
6th & 7th fl - install phone structural & electrical | $30,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 2nd & 3rd fl - install phone structural & electricalDetails
2nd & 3rd fl - install phone structural & electrical | $30,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 10th & 11th fl - install phone structural & electricalDetails
10th & 11th fl - install phone structural & electrical | $30,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 4th & 5th fl - install phone structural & electricalDetails
4th & 5th fl - install phone structural & electrical | $30,000 |
| Jan 23, 2025 | Completed final sign-off Feb 2026 | 1455 03rd St | Principal Builders Inc. | 8th & 9th fl - install phone structural & electricalDetails
8th & 9th fl - install phone structural & electrical | $30,000 |
| Apr 12, 2024 | Completed final sign-off Jan 2025 | 1455 03rd St | Principal Builders Inc. | 2nd fl. addition of 2 (n) fences with gates to (e) terraceDetails
2nd fl. addition of 2 (n) fences with gates to (e) terrace | $170,466 |
| Oct 19, 2021 | Completed final sign-off Nov 2021 | 1455 03rd St | Siemens Industry, Inc. | level 1: to reprogram the (e) level 1 childcare area pull station (yellow) from an evacuation device to a fire drill device. voluntary replacement.Details
level 1: to reprogram the (e) level 1 childcare area pull station (yellow) from an evacuation device to a fire drill device. voluntary replacement. | |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 1455 03rd St | Cosco Fire Protection Inc. | relocate 7 fire sprinkler heads ref pa 202108055845 architectural drawings.Details
relocate 7 fire sprinkler heads ref pa 202108055845 architectural drawings. | $10,000 |
| Aug 5, 2021 | Completed final sign-off Nov 2021 | 1455 03rd St | Truebeck Construction | level 2-11: add ada door operators to (30) atrium doors.Details
level 2-11: add ada door operators to (30) atrium doors. | $30,000 |
| Jul 16, 2021 | Completed final sign-off Aug 2021 | 1455 03rd St | Siemens Industry, Inc. | level 1:fire only work to add 1 pull station at the "childcare" exissting tenant space, no ref permit applicationDetails
level 1:fire only work to add 1 pull station at the "childcare" exissting tenant space, no ref permit application | $550 |
| Jul 1, 2021 | Completed final sign-off Aug 2021 | 1455 03rd St | Truebeck Construction | addition of ada power door operator to 5 childcare doors ("at the request of district fire licensing inspector").Details
addition of ada power door operator to 5 childcare doors ("at the request of district fire licensing inspector"). | $7,500 |
| Feb 24, 2021 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | per district inspector, revision #5 to site permit #201508245071 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201912190079Details
per district inspector, revision #5 to site permit #201508245071 addendum #3: to memorialize ab-005 for 2 hr rated through penetration of fire rated assemblies at end of bridges. fire rated assemblies at ends of bridges under app#201912190079 | |
| Feb 18, 2021 | Completed final sign-off Mar 2021 | 1455 03rd St | Siemens Industry, Inc. | as-built permit for the 2-way communication system; 14 call stations and a second master command station were added and installed to the original scope of work under permite app # 2015 0824 5071 (addenda 9).Details
as-built permit for the 2-way communication system; 14 call stations and a second master command station were added and installed to the original scope of work under permite app # 2015 0824 5071 (addenda 9). | $8,800 |
| Oct 3, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | installation of accelerograph per ab 58.Details
installation of accelerograph per ab 58. | |
| Sep 16, 2020 | Completed final sign-off Nov 2020 | 1455 03rd St | Truebeck Construction | 1-11/f: mb1-fabricate & install evacuation signage for level 1 through 11Details
1-11/f: mb1-fabricate & install evacuation signage for level 1 through 11 | $10,000 |
| Aug 26, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | level 3: fire alarm additions are 2 smoke duct detectors, 4 duct detectors, 6 modules, 2 strobe power supply, 7 speakers, and 26 speaker strobes. ref app#201906203975Details
level 3: fire alarm additions are 2 smoke duct detectors, 4 duct detectors, 6 modules, 2 strobe power supply, 7 speakers, and 26 speaker strobes. ref app#201906203975 | $34,700 |
| Aug 26, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | 1455 lg fire alarm-additionas are 1 smoke detector, 4 duct detectors, 1 strobe power supply , 8 speakers, 28 speaker strobes. ref 20190806804Details
1455 lg fire alarm-additionas are 1 smoke detector, 4 duct detectors, 1 strobe power supply , 8 speakers, 28 speaker strobes. ref 20190806804 | $35,900 |
| Aug 26, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | 1455 03rd st level 1 fire alarm - childcare. additions are 17 smoke detectors, 9 duct detectors, 10 modules and 20 speaker/strobes. ref pa#201807094012Details
1455 03rd st level 1 fire alarm - childcare. additions are 17 smoke detectors, 9 duct detectors, 10 modules and 20 speaker/strobes. ref pa#201807094012 | $42,750 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane. this is a free standing exterior wayfinding totem.Details
mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane. this is a free standing exterior wayfinding totem. | $500 | |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | Truebeck Construction | mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this sign is 1 face, non-illuminated "uber" sign on s/w corner facing west.Details
mb1-master signage plan per g-04. this permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this sign is 1 face, non-illuminated "uber" sign on s/w corner facing west. | $5,000 |
| Aug 20, 2020 | Expired or cancelled cancelled Sep 2020 | 1455 03rd St | Truebeck Construction | mb1-master signage plan per g-04.permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this 1 face non-electric sign "1455 third street" is in s/w corner facing west.Details
mb1-master signage plan per g-04.permit submission includes free-standing exterior wayfinding totem signage at the entry of 1455 3rd street and glass decal signage at the entry of 1455 3rd street and 188 pierpoint lane.this 1 face non-electric sign "1455 third street" is in s/w corner facing west. | $200 |
| Aug 13, 2020 | Never finaled issued Aug 2020, no final | 1455 03rd St | Truebeck Construction | mbi- to incorporate revised fsae waterproofing meeting minutes. changes reflect development of waterproofing details through actualization and construction. revision to app#201508245071 s4.Details
mbi- to incorporate revised fsae waterproofing meeting minutes. changes reflect development of waterproofing details through actualization and construction. revision to app#201508245071 s4. | |
| Aug 13, 2020 | Completed final sign-off Jul 2022 | 188 Pierpoint Ln | Truebeck Construction | mbi- fabricate and install childcare evacuation signage associated with t.i. work approved under app#201807094012Details
mbi- fabricate and install childcare evacuation signage associated with t.i. work approved under app#201807094012 | |
| Aug 11, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | revision to app#201508245071 to incorporate revised bridge seismic joint fire protection strategy, including pre-application meeting min, report & 3rd party review.Details
revision to app#201508245071 to incorporate revised bridge seismic joint fire protection strategy, including pre-application meeting min, report & 3rd party review. | |
| Aug 6, 2020 | Completed final sign-off Nov 2021 | 1455 03rd St | Siemens Industry, Inc. | mb1 - fire alarm work for uber remodel on 11/f; addtions are 1 smoke detector, 3 duct detector, 6 modules, 2 strobe power supplies, 4 speakers 28 speaker/strobes, ref pa# 201910073722Details
mb1 - fire alarm work for uber remodel on 11/f; addtions are 1 smoke detector, 3 duct detector, 6 modules, 2 strobe power supplies, 4 speakers 28 speaker/strobes, ref pa# 201910073722 | $31,850 |
| Aug 6, 2020 | Completed final sign-off Dec 2021 | 1455 03rd St | Siemens Industry, Inc. | fire alarm work for uber remodel on 8/f; addtions are 1 smoke detectors, 4 duct detectors, 8 moduels, 1 strobe power supply, 7 speakers, 31 speaker/strobes. ref #201910073711Details
fire alarm work for uber remodel on 8/f; addtions are 1 smoke detectors, 4 duct detectors, 8 moduels, 1 strobe power supply, 7 speakers, 31 speaker/strobes. ref #201910073711 | $36,650 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | mb1 - fire alarm work for uber remodel on 7/f; addtions are 1 remote node panel, 1 smoke detector, 4 duct detector, 5 modules, 2 strobe power supplies, 8 speakers 29 speaker/strobes, ref pa# 201908068049Details
mb1 - fire alarm work for uber remodel on 7/f; addtions are 1 remote node panel, 1 smoke detector, 4 duct detector, 5 modules, 2 strobe power supplies, 8 speakers 29 speaker/strobes, ref pa# 201908068049 | $39,730 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | mb1 - fire alarm for uber "common areas" remodel on level 1. additions are 7 smoke detectors, 20 modules and 25 speaker / strobes. ref pa 201901301584.Details
mb1 - fire alarm for uber "common areas" remodel on level 1. additions are 7 smoke detectors, 20 modules and 25 speaker / strobes. ref pa 201901301584. | $30,300 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | mb 1-fire alarm work for uber remodel on 2/f; addtions are a remode node panel, 4 duct detectors, 10 modules, 1 strobe power supply, 4 speakers, and 24 speaker/strobes. ref pa#201906203971Details
mb 1-fire alarm work for uber remodel on 2/f; addtions are a remode node panel, 4 duct detectors, 10 modules, 1 strobe power supply, 4 speakers, and 24 speaker/strobes. ref pa#201906203971 | $32,800 |
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | level 10: mb1-fire alarm work for the uber remodel on level 10. additions are 1 smoke detector, 4 duct detectors, 7 modules, 1 strobe power supply, 4 speakers, and 26 speaker/strobes. ref app#201910073715Details
level 10: mb1-fire alarm work for the uber remodel on level 10. additions are 1 smoke detector, 4 duct detectors, 7 modules, 1 strobe power supply, 4 speakers, and 26 speaker/strobes. ref app#201910073715 | $31,100 |
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | level 4: mb1-fire alarm work for the uber remodel on level 4. additions are 4 smoke detector, 4 duct detectors, 1 strobe power supply, 8 speakers, and 27 speaker/strobes. ref app#201906203977Details
level 4: mb1-fire alarm work for the uber remodel on level 4. additions are 4 smoke detector, 4 duct detectors, 1 strobe power supply, 8 speakers, and 27 speaker/strobes. ref app#201906203977 | $34,650 |
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | level 9: mb1-fire alarm work for the uber remodel on level 9. additions are 1 smoke detector, 4 duct detectors, 7 modules, 2 strobe power supplies, 4 speakers, and 27 speaker/strobes. ref app#201910073709Details
level 9: mb1-fire alarm work for the uber remodel on level 9. additions are 1 smoke detector, 4 duct detectors, 7 modules, 2 strobe power supplies, 4 speakers, and 27 speaker/strobes. ref app#201910073709 | $33,300 |
| Aug 4, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Siemens Industry, Inc. | level 5: mb1-fire alarm work for the uber remodel on level 5. additions are 1 smoke detector, 4 duct detectors, 9 modules, 2 strobe power supplies, 8 speakers, and 26 speaker/strobes. ref app#201908068046Details
level 5: mb1-fire alarm work for the uber remodel on level 5. additions are 1 smoke detector, 4 duct detectors, 9 modules, 2 strobe power supplies, 8 speakers, and 26 speaker/strobes. ref app#201908068046 | $36,200 |
| Jul 8, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | mbi- revision to t.i. permits for level 6(201908068048) and level 7 (201908068049) to memorialize update smoke control narrative.Details
mbi- revision to t.i. permits for level 6(201908068048) and level 7 (201908068049) to memorialize update smoke control narrative. | |
| Jun 24, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a ground, non-electric sign,includes free-standing exterior wayfinding totem signage at the entry of 1455 03rd st. **maher n/a**Details
to erect a ground, non-electric sign,includes free-standing exterior wayfinding totem signage at the entry of 1455 03rd st. **maher n/a** | $500 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a non-electric,single faced, door/window sign.Details
to erect a non-electric,single faced, door/window sign. | $200 |
| Jun 19, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to erect a non-electric, single faced, door/window sign. "1455 third street"operational decals a the entry of 1455 3rd st **maher n/a**Details
to erect a non-electric, single faced, door/window sign. "1455 third street"operational decals a the entry of 1455 3rd st **maher n/a** | $200 |
| Jun 17, 2020 | Completed final sign-off Mar 2021 | 188 Pierpoint Ln | Truebeck Construction | erect new operational decals at the entry of 188 pierpoint lane childcare center.Details
erect new operational decals at the entry of 188 pierpoint lane childcare center. | |
| Jun 12, 2020 | Completed final sign-off May 2024 | 1455 03rd St | Cosco Fire Protection Inc. | level 1 t.i.: add 35 new sprinkler heads. ref 201606079321.Details
level 1 t.i.: add 35 new sprinkler heads. ref 201606079321. | $30,000 |
| Feb 27, 2020 | Completed final sign-off Nov 2020 | 1455 03rd St | Decker Electric Co Inc Electrical Contra | revision to errcs permit# 2015-0824-5071 s16.Details
revision to errcs permit# 2015-0824-5071 s16. | $100,000 |
| Feb 19, 2020 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | revision to 201511182997 to show pierpoint laneretractable bollards wiring diagram and fire alarm tie-insDetails
revision to 201511182997 to show pierpoint laneretractable bollards wiring diagram and fire alarm tie-ins | $100 |
| Feb 19, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | revision to 201508245071-s3 to add fixed crash rated bollards along bridgeview way at lot 34.Details
revision to 201508245071-s3 to add fixed crash rated bollards along bridgeview way at lot 34. | |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1455 03rd St | Truebeck Construction | revision to pa #2019-0104-9632: revise smoke control riser & matrix for floor closure between levels 6 & 7 to operate as separate smoke zones. revised ahu dmaper and fan control on smoke control panelDetails
revision to pa #2019-0104-9632: revise smoke control riser & matrix for floor closure between levels 6 & 7 to operate as separate smoke zones. revised ahu dmaper and fan control on smoke control panel | |
| Jan 24, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to obtain final inspection for work approved under pa #201706139222, 201712126186. all work is complete.Details
to obtain final inspection for work approved under pa #201706139222, 201712126186. all work is complete. | |
| Jan 24, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | to obtain final inspection for work approved under pa #201608124852, 201707182150, 201711214513. all work is complete.Details
to obtain final inspection for work approved under pa #201608124852, 201707182150, 201711214513. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | renewal of pa# 201606079321 for final inspection. all work is complete.Details
renewal of pa# 201606079321 for final inspection. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | renewal of pa# 201612225732, 201612225734 for final inspection. all work is complete.Details
renewal of pa# 201612225732, 201612225734 for final inspection. all work is complete. | |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | renewal of pa# 201701257865, 201704133910 for final inspection. all work is complete.Details
renewal of pa# 201701257865, 201704133910 for final inspection. all work is complete. | |
| Jan 14, 2020 | Never finaled issued Nov 2020, no final | 1455 03rd St | Truebeck Construction | administrative permit to memorialize installation requirement per ab005 for framery phone booths as shown in ti permits. pa#201906203971,201906203975,201906203977,201908068046,201908068048,201908068049,201910073711,201910073709,201910073715,201910073722Details
administrative permit to memorialize installation requirement per ab005 for framery phone booths as shown in ti permits. pa#201906203971,201906203975,201906203977,201908068046,201908068048,201908068049,201910073711,201910073709,201910073715,201910073722 | |
| Jan 9, 2020 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | ref pa# 201910073722; added 73 new sprnikler heads for l11 ti n/a maherDetails
ref pa# 201910073722; added 73 new sprnikler heads for l11 ti n/a maher | $30,000 |
| Jan 9, 2020 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | added 98 new sprnikler heads for l10 ti n/a maherDetails
added 98 new sprnikler heads for l10 ti n/a maher | $30,000 |
| Dec 19, 2019 | Never finaled issued Nov 2020, no final | 1455 03rd St | Truebeck Construction | revision to issued permit #201508245071-s3 to incorporate changes to various life safety, egress path, door schedule room layout & misc drawings.Details
revision to issued permit #201508245071-s3 to incorporate changes to various life safety, egress path, door schedule room layout & misc drawings. | |
| Dec 17, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | level 9 - add 109 new fire sprinkler heads for level 9 tiDetails
level 9 - add 109 new fire sprinkler heads for level 9 ti | $30,000 |
| Dec 10, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | add 116 ti heads fire sprinklers ref 201910073711Details
add 116 ti heads fire sprinklers ref 201910073711 | $30,000 |
| Dec 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | installation of art on (e) privately owned, publicly accessed open space, lot 34.Details
installation of art on (e) privately owned, publicly accessed open space, lot 34. | $25,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | 1st fl. add 55 new sprinkler heads for level 1 t.i.Details
1st fl. add 55 new sprinkler heads for level 1 t.i. | $30,000 |
| Nov 21, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | fire sprinkler for 6th fl: add 107 new sprinklers for ti. maher naDetails
fire sprinkler for 6th fl: add 107 new sprinklers for ti. maher na | $30,000 |
| Nov 21, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | fire sprinkler for 7th fl: add 133 new sprinklers for ti. maher naDetails
fire sprinkler for 7th fl: add 133 new sprinklers for ti. maher na | $30,000 |
| Nov 14, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | 4/f: add 102 new sprinkler heads for l4 tiDetails
4/f: add 102 new sprinkler heads for l4 ti | $30,000 |
| Nov 14, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | 5/f: add 95 new sprinkler heads for l5 tiDetails
5/f: add 95 new sprinkler heads for l5 ti | $30,000 |
| Nov 12, 2019 | Completed final sign-off May 2022 | 1455 03rd St | Cosco Fire Protection Inc. | level #3:t.i. to add 100 new sprinkler heads tiDetails
level #3:t.i. to add 100 new sprinkler heads ti | $30,000 |
| Nov 4, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | rev to pa# 201901301584; scope of work includes revisions to architectural walls, ceilings & mepDetails
rev to pa# 201901301584; scope of work includes revisions to architectural walls, ceilings & mep | |
| Oct 23, 2019 | Completed final sign-off Jan 2021 | 1455 03rd St | Cosco Fire Protection Inc. | add 82 new sprinkler heads for l2 ti.Details
add 82 new sprinkler heads for l2 ti. | $30,000 |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | mbi-level 8; t.i. for business & assembly interior wall & floor improvements w/new finishes mepDetails
mbi-level 8; t.i. for business & assembly interior wall & floor improvements w/new finishes mep | $2,562,990 | |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | mbi-level 9; t.i. for business & assembly interior wall & floor improvements w/new finishes mepDetails
mbi-level 9; t.i. for business & assembly interior wall & floor improvements w/new finishes mep | $2,324,155 |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | mbi-level 11; t.i. for business & assembly interior wall & floor improvements w/new finishes mep n/a maherDetails
mbi-level 11; t.i. for business & assembly interior wall & floor improvements w/new finishes mep n/a maher | $1,976,170 |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | mbi-level 10; t.i. for business & assembly interior wall & floor improvements w/new finishes mep na maherDetails
mbi-level 10; t.i. for business & assembly interior wall & floor improvements w/new finishes mep na maher | $2,469,935 |
| Aug 19, 2019 | Completed final sign-off Mar 2021 | 1455 03rd St | Truebeck Construction | admin permit to correct app # incorectly recorded on the dwgs and job card/ adden 1 of site permit 201511182997 for pier point lane, aka lot 34 the correct app # for this adden dwgs & job card is 201511182997Details
admin permit to correct app # incorectly recorded on the dwgs and job card/ adden 1 of site permit 201511182997 for pier point lane, aka lot 34 the correct app # for this adden dwgs & job card is 201511182997 | |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | 7th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systemsDetails
7th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systems | $2,454,950 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | 5th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systemsDetails
5th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systems | $2,454,950 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | 6th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systemsDetails
6th flr - tenant improvement for business & assembly. interior wall & floor improvements with new finishes, mep, tech, security & av systems | $2,442,000 |
| Jul 31, 2019 | Never finaled issued Oct 2019, no final | 1455 03rd St | Truebeck Construction | reference p.a. #2015 0824 5071. structural, mechanical, ele, plumbing engineering and deisign for a complete and operational fuel cell system that will serve future telecommunications and network rooms in building. tlecommunications and network rooms under ti maher not req. ref pa 2019-0731-7520Details
reference p.a. #2015 0824 5071. structural, mechanical, ele, plumbing engineering and deisign for a complete and operational fuel cell system that will serve future telecommunications and network rooms in building. tlecommunications and network rooms under ti maher not req. ref pa 2019-0731-7520 | $10,000 |
| Jun 20, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | level 4 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher naDetails
level 4 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na | $2,400,000 | |
| Jun 20, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | level 2 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher naDetails
level 2 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na | $2,300,000 |
| Jun 20, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | level 3 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher naDetails
level 3 tenant improvement: new interior wall & floor. new finishes, mep, tech, secutiry, & av. maher na | $2,300,000 |
| Apr 24, 2019 | Never finaled issued Apr 2019, no final | 1451 03rd St | change address per owner at pa #201508245072 from 1453 3rd street to 1451 3rd street.Details
change address per owner at pa #201508245072 from 1453 3rd street to 1451 3rd street. | ||
| Mar 5, 2019 | Never finaled issued Mar 2019, no final | 1453 03rd St | per pa #201508245072, add address to block 8721, lot 033 as; 1453 03rd street, 18 pierpoint street.Details
per pa #201508245072, add address to block 8721, lot 033 as; 1453 03rd street, 18 pierpoint street. | ||
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 1455 03rd St | per pa #201508245071s, add new address to block 8721, lot 033; 1453 3rd street (retail) and 188 pierpoint lane (child care).Details
per pa #201508245071s, add new address to block 8721, lot 033; 1453 3rd street (retail) and 188 pierpoint lane (child care). | ||
| Jan 30, 2019 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | first flr tenant improvement. non-structural interiors, floor improvement. (n) mep, tech, security + av. fully sprinklered buildingDetails
first flr tenant improvement. non-structural interiors, floor improvement. (n) mep, tech, security + av. fully sprinklered building | $960,500 |
| Jan 4, 2019 | Never finaled issued Jan 2019, no final | 1455 03rd St | Truebeck Construction | revision to bpa 201508245071 s3 for sequence of operation changesDetails
revision to bpa 201508245071 s3 for sequence of operation changes | |
| Jul 9, 2018 | Completed final sign-off May 2021 | 1455 03rd St | Truebeck Construction | interior child care t.i. on ground level. ** maher: n/a **Details
interior child care t.i. on ground level. ** maher: n/a ** | $1,200,000 |
| Apr 5, 2018 | Completed final sign-off Mar 2021 | 1455 03rd St | Gecms Inc/Mcguire And Hester Joint Ventu | installation two (2) (n) 8-inch fire services with backflow preventers off of 8-inch city main on 3rd st. from street curb sidewalk to 5 feet from building. reference #201508245071. comply w/ maher ord 155-13.Details
installation two (2) (n) 8-inch fire services with backflow preventers off of 8-inch city main on 3rd st. from street curb sidewalk to 5 feet from building. reference #201508245071. comply w/ maher ord 155-13. | $253,000 |
| Jan 12, 2018 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | water flow information in conjunction w/ new bldg construction under pa #2015-0824-5071, per plumbing inspectors request.Details
water flow information in conjunction w/ new bldg construction under pa #2015-0824-5071, per plumbing inspectors request. | |
| Dec 12, 2017 | Expired or cancelled expired Mar 2021 | 1455 03rd St | Truebeck Construction | revision to 201508245071 (s1) foundation to include pile caps and child care ramps. n/a for maherDetails
revision to 201508245071 (s1) foundation to include pile caps and child care ramps. n/a for maher | |
| Nov 21, 2017 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | revision to pa #201707182150. file revision to show updates to pile design. maher naDetails
revision to pa #201707182150. file revision to show updates to pile design. maher na | |
| Jul 18, 2017 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | revision to app#201606039050. scope is to revise piles based on field conditions.Details
revision to app#201606039050. scope is to revise piles based on field conditions. | |
| Jun 13, 2017 | Expired or cancelled expired Mar 2021 | 1455 03rd St | Truebeck Construction | tower crane foundation & erection for (n) bldg under pa 2015-0824-5071Details
tower crane foundation & erection for (n) bldg under pa 2015-0824-5071 | $50,000 |
| Apr 13, 2017 | Completed final sign-off Dec 2020 | 1455 03rd St | Cosco Fire Protection Inc. | revision to app#201701257865. add back flow preventer.Details
revision to app#201701257865. add back flow preventer. | $25,000 |
| Jan 25, 2017 | Completed final sign-off Mar 2021 | 1455 03rd St | Cosco Fire Protection Inc. | 2 8" fire services 5ft out from building maher not reqDetails
2 8" fire services 5ft out from building maher not req | $25,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | construction of shoring wall in association of bld construction at 1455 3rd 280 lineal ft of wall with 17 tiebacks within property and 3 tiebacks encroaching onto park maher naDetails
construction of shoring wall in association of bld construction at 1455 3rd 280 lineal ft of wall with 17 tiebacks within property and 3 tiebacks encroaching onto park maher na | $5,000 |
| Dec 22, 2016 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | construction of shoring wall in association of bld construction at 1455 3rd 460 lineal ft of wall with 17 tiebacks within property and 13 tiebacks encroaching along 3rd street maher naDetails
construction of shoring wall in association of bld construction at 1455 3rd 460 lineal ft of wall with 17 tiebacks within property and 13 tiebacks encroaching along 3rd street maher na | $800,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | indicator piles associated with/production pile permit 201606039050 maher naDetails
indicator piles associated with/production pile permit 201606039050 maher na | $10,000 |
| Jun 7, 2016 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | demo & excavation in advance of (n) bldg park & public thruway under separate site permit 201508245071. work includes site preparation & grading & #201511182997Details
demo & excavation in advance of (n) bldg park & public thruway under separate site permit 201508245071. work includes site preparation & grading & #201511182997 | $35,000 |
| Jun 3, 2016 | Completed final sign-off Oct 2020 | 1455 03rd St | Truebeck Construction | installation of piles in advance of construction of new building under site permit 201508245071: work includes installation of (114) 16/26 tibex piles includes (159) existing h-piles. n/a for maher ordinance no.155-13.Details
installation of piles in advance of construction of new building under site permit 201508245071: work includes installation of (114) 16/26 tibex piles includes (159) existing h-piles. n/a for maher ordinance no.155-13. | $120,000 |
| Nov 18, 2015 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | landscaping at adjcent lot 034 of new building, renovation of (e) privately owned public space (lot 34) adjacent to (n) bldg submitted under appln #201508245071 & lot 33. scopte include (n) landscaping, planters, benches.Details
landscaping at adjcent lot 034 of new building, renovation of (e) privately owned public space (lot 34) adjacent to (n) bldg submitted under appln #201508245071 & lot 33. scopte include (n) landscaping, planters, benches. | $2,000,000 |
| Aug 24, 2015 | Completed final sign-off Apr 2021 | 1455 03rd St | Truebeck Construction | erect 12 stories for office, daycare.Details
erect 12 stories for office, daycare. | $66,591,018 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (52), Siemens Industry, Inc. (31), Principal Builders Inc. (22), Cosco Fire Protection Inc. (15), R L H Fire Protection Inc (14), Acco Engineered Systems Inc. Dba Acco En (2), Decker Electric Co Inc Electrical Contra, Gecms Inc/Mcguire And Hester Joint Ventu
- Architects
- Luda Hoe (14), Stanley H Lew (14), Coren D Sharples (7), Alfred Quezada, Jr (2), Ceren Sharples, Red Cloud Wireless
- Engineers
- Mark Koenigs (5), Erik Elmtoft (3), Hassan Ally (3), Lars P. Mortensen (3), Robert Nixdorf (3), Charles Lew (2), Coren D Sharples (2), Stephen Shaffer (2), Fini Jafar, Leo Panian, Saied Nazeri
- Authorized agent-otherss
- Ronald Demartini (2), Southwest Sign Co.
- Designers
- David Michael Young (6), R L H Fire Protection Inc (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.