Shawn P.H. Vessels
- Listed as
- engineer
- On San Francisco permits
- Mar 2021 to Oct 2022
2 permits since 2000 (engineer on 2 permits): 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2022 | Never finaled issued Sep 2023, no final | 300 Lake St | Tank - Tek Environmental Corporation | replacement of (e) fueling system with (n) 2000 gallon wall underground storage tank (diesel). double wall underground fuel oil supply/return piping, piping transition sump, 50 gallon double wall day tank, (2) gpm remote pumping skid & new veeder-root fuel mgmt control system (rewire old to new...Details
replacement of (e) fueling system with (n) 2000 gallon wall underground storage tank (diesel). double wall underground fuel oil supply/return piping, piping transition sump, 50 gallon double wall day tank, (2) gpm remote pumping skid & new veeder-root fuel mgmt control system (rewire old to new... | $40,000 |
| Mar 17, 2021 | Never finaled issued Jul 2021, no final | 450 Sutter St | Derry Casey Builders Inc | 6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work.Details
6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work. | $700,000 |