Brian Milford
- License
- 33430
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Martinkovich Milford Arch
- Based in
- San Francisco
- On San Francisco permits
- Sep 2012 to Nov 2026
6 permits since 2000 (architect on 6 permits): 2 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Finbarr Collins Construction Inc., Gci, Inc, Howard S. Wright Constructors Lp, Recon Dragon & Building
- Architects
- Nathaniel Haynes
- Engineers
- Don David, Shaun Moynahan
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2026 | In progress filed Nov 2026, not yet issued | 785 Mission St | ground flr interior demolition of (e) day spa tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors,and finisehs.patching of finishes and preparation for future t.i. build out.space to remain vacant and disables access compliance is defered per ab-017.no exterior workDetails
ground flr interior demolition of (e) day spa tenant space: plumbing, electrical, and lighting fixtures, interior walls, doors,and finisehs.patching of finishes and preparation for future t.i. build out.space to remain vacant and disables access compliance is defered per ab-017.no exterior work | $25,353 | |
| Sep 25, 2025 | In progress issued Sep 2026 | 2320 Ulloa St | Recon Dragon & Building | renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roofDetails
renovate (e)ground flr w/ new bedrm & bathrm. relocated laundry to garage. enclose (e) lightwell, new inter connecting stair. relocated bathrm @ main flr, new finishes @ (e)kitchen. new elec wiring & lighting @ reconfigured areas & throughout lower lvl. adjust slab on grade. repairs & infill @ roof | $259,417 |
| Jun 25, 2025 | In progress issued Oct 2025 | 839 North Point St | Finbarr Collins Construction Inc. | horizontal addition at the 3rd lvl to accommodate new bedroom, office and exterior deck at rear. removal of (e) exterior walls and roof at 2nd lvl to accommodate horizontal addition at 3rd lvl. removal (e) roof over (e) bedroom to accommodate raised head height. removal (e) doors, finihes & fixturesDetails
horizontal addition at the 3rd lvl to accommodate new bedroom, office and exterior deck at rear. removal of (e) exterior walls and roof at 2nd lvl to accommodate horizontal addition at 3rd lvl. removal (e) roof over (e) bedroom to accommodate raised head height. removal (e) doors, finihes & fixtures | $110,000 |
| Apr 25, 2025 | Completed final sign-off Nov 2026 | 50 Fremont St | Gci, Inc | to comply with ab-056 disabled access compliance status documentation.Details
to comply with ab-056 disabled access compliance status documentation. | |
| Jan 22, 2020 | Expired or cancelled cancelled Jul 2024 | 240 Santa Paula Av | 2-story horizontal add. in rear yard @ ground lvl. exterior roof patio & basement floor connecting w/ rear yard. basement: (n) bedroom, (n) bathroom, storage & utility rm. (e) garage on santa paula ave to be converted to a bedroom. a (n) garage to be built at the rear of the property on terrace dr.Details
2-story horizontal add. in rear yard @ ground lvl. exterior roof patio & basement floor connecting w/ rear yard. basement: (n) bedroom, (n) bathroom, storage & utility rm. (e) garage on santa paula ave to be converted to a bedroom. a (n) garage to be built at the rear of the property on terrace dr. | $345,430 | |
| Sep 10, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | Howard S. Wright Constructors Lp | facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit.Details
facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit. | $17,500 |