Block 3724, lot 072
888 Howard St
- City’s use
- Commercial Hotel
- Built
- 2008
- Stories
- 32
- Building
- 564,614 sq ft
- Lot
- 39,270 sq ft
- Zoning
- C3S
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
43 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 29, 2023 | In progress issued Jan 2024 | 888 Howard St | Paganini Electric Corp(See Signatories) | installation of power to a tritium rtm75 elecrical vehicle charger.Details
installation of power to a tritium rtm75 elecrical vehicle charger. | $70,000 |
| Mar 10, 2022 | Completed final sign-off Apr 2022 | 888 Howard St | Thomas Swan Sign Co Inc | to relocate/install 1 electric, projecting, double faced sign. (bar 888). ref pa# 201908269785Details
to relocate/install 1 electric, projecting, double faced sign. (bar 888). ref pa# 201908269785 | $5,000 |
| Sep 22, 2021 | Completed final sign-off Oct 2021 | 888 Howard St | Everon Llc | fire alarm - reprogram duct detectors on 6th floor guest room from alarm to supervising signal.Details
fire alarm - reprogram duct detectors on 6th floor guest room from alarm to supervising signal. | |
| Jan 3, 2020 | Never finaled issued Feb 2020, no final | 888 Howard St | Build Group Inc. | revision to 201902193201 to add title 24 requirements deferred electrical submittalDetails
revision to 201902193201 to add title 24 requirements deferred electrical submittal | |
| Dec 19, 2019 | Expired or cancelled cancelled Jul 2024 | 888 Howard St | add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged.Details
add a retractable fabric canopy at an existing outdoor deck of this hotel, the space is already permitted as an outdoor place of assembly, occupancy, occupancy load, use, and egress are unchanged. | $3,000,000 | |
| Aug 26, 2019 | Never finaled issued Sep 2019, no final | 888 Howard St | Thomas Swan Sign Co Inc | install 2 illuminated signs onto (e) canopiesDetails
install 2 illuminated signs onto (e) canopies | $8,000 |
| Aug 26, 2019 | Never finaled issued Sep 2019, no final | 888 Howard St | Thomas Swan Sign Co Inc | install 1 illuminated projecting signDetails
install 1 illuminated projecting sign | $3,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 888 Howard St | Eco Fire Sprinklers Inc | lobby: move a pendent sprinkler up in area of work for renovation. ref app#201810042244. n/a for maherDetails
lobby: move a pendent sprinkler up in area of work for renovation. ref app#201810042244. n/a for maher | $6,200 |
| Jun 19, 2019 | Completed final sign-off Jul 2019 | 888 Howard St | Eco Fire Sprinklers Inc | 1/f: fire sprinlker move 1 head restaurant area in closet. ref t.i. pa201902193201.Details
1/f: fire sprinlker move 1 head restaurant area in closet. ref t.i. pa201902193201. | $1,200 |
| Jun 11, 2019 | Never finaled filed Jun 2019, never issued | 888 Howard St | street spaceDetails
street space | ||
| May 14, 2019 | Completed final sign-off Mar 2020 | 888 Howard St | Red Hawk Fire & Security Ca Llc | 6th fl - fire alarm ti add 1 control relay for holder. ref pa 2018-0327-4716Details
6th fl - fire alarm ti add 1 control relay for holder. ref pa 2018-0327-4716 | $600 |
| Feb 19, 2019 | Never finaled issued Jun 2019, no final | 888 Howard St | Build Group Inc. | interior renovation of (e) luce restaurant (also to document the space as a-2)Details
interior renovation of (e) luce restaurant (also to document the space as a-2) | $1,600,000 |
| Nov 26, 2018 | Never finaled issued Nov 2018, no final | 888 Howard St | street spaceDetails
street space | ||
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 888 Howard St | Red Hawk Fire & Security Ca Llc | fire alarm ti 6th fl - add 3 speaker strobes, 5 speakers, 2 strobes, 4 smoke detector with sounder base, 2 sync modules for ada room, 8 duct detectors for fsd with control & 1 smoke detector for fsr with control. ref pa 2018-0327-4716Details
fire alarm ti 6th fl - add 3 speaker strobes, 5 speakers, 2 strobes, 4 smoke detector with sounder base, 2 sync modules for ada room, 8 duct detectors for fsd with control & 1 smoke detector for fsr with control. ref pa 2018-0327-4716 | $20,000 |
| Oct 4, 2018 | Never finaled issued Jun 2019, no final | 888 Howard St | Build Group Inc. | add vestibule to entrance of the luce restaraunt to reduce air infiltration.Details
add vestibule to entrance of the luce restaraunt to reduce air infiltration. | $180,000 |
| Sep 12, 2018 | Expired or cancelled cancelled Aug 2023 | 888 Howard St | Eco Fire Sprinklers Inc | addition of 83 new hsw heads for addition of a exterior canopy 4th floor. ref app#201806202470Details
addition of 83 new hsw heads for addition of a exterior canopy 4th floor. ref app#201806202470 | $30,000 |
| Aug 21, 2018 | Completed final sign-off Apr 2020 | 888 Howard St | Acco Engineered Systems Inc. Dba Acco En | install (6) new 4 pipe fan coil units, install (5) new vav terminal boxes including ductwork & thermostat, provide exhause to bathrooms tying it to existing exhuast fan. reference pa# 2018-0327-4716 for related building permitDetails
install (6) new 4 pipe fan coil units, install (5) new vav terminal boxes including ductwork & thermostat, provide exhause to bathrooms tying it to existing exhuast fan. reference pa# 2018-0327-4716 for related building permit | $90,000 |
| Aug 10, 2018 | Completed final sign-off Sep 2018 | 888 Howard St | Geisseler Engineering | installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit)Details
installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit) | $17,500 |
| Aug 7, 2018 | Completed final sign-off Dec 2018 | 888 Howard St | Eco Fire Sprinklers Inc | sprinklers t.i - 6th floor-add relocate 54 new pendent sprinklers for a tenant improvement project of a 6th fl spa turned into guest rooms ref 201803274716Details
sprinklers t.i - 6th floor-add relocate 54 new pendent sprinklers for a tenant improvement project of a 6th fl spa turned into guest rooms ref 201803274716 | $8,000 |
| Aug 2, 2018 | Completed final sign-off Apr 2019 | 888 Howard St | Red Hawk Fire & Security Ca Llc | floor 6-11, 20-24, 31 - fire alarm ti multiple floor - add 17 ceiling strobe only in existing ada guestrooms ref pa 2017-0829-6308Details
floor 6-11, 20-24, 31 - fire alarm ti multiple floor - add 17 ceiling strobe only in existing ada guestrooms ref pa 2017-0829-6308 | $9,000 |
| Jun 20, 2018 | Never finaled issued Jul 2018, no final | 888 Howard St | Build Group Inc. | installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permitDetails
installation of anchor bolts only for possible future fabric canopy, the canopy (if built) will be a seperate project under separate permit | $100,000 |
| Mar 27, 2018 | Completed final sign-off Jul 2020 | 888 Howard St | Build Group Inc. | 6th fl - renovate 5950 sf of (e)6th fl to change it from a day spa ( b occupancy) to 7 guest rooms (r-1 occupancy) mep/fire under separate permit. ** maher: n/a **Details
6th fl - renovate 5950 sf of (e)6th fl to change it from a day spa ( b occupancy) to 7 guest rooms (r-1 occupancy) mep/fire under separate permit. ** maher: n/a ** | $1,500,000 |
| Aug 29, 2017 | Completed final sign-off Dec 2019 | 888 Howard St | Build Group Inc. | removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occursDetails
removal and replacement in kind of 26% of insulating glass units. approx 1700 units (windows). appearance of building will be unchanged. no change in use, height, area or egress, or construction type occurs | $15,000,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 888 Howard St | for planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance.Details
for planning purposes, this is only for conversion of popos (privately owned public open space) to private open space per sf ord 90-17. no construction involved. (4th and sixth floor) n/a for maher ordinance. | ||
| Mar 3, 2015 | Expired or cancelled cancelled Jan 2026 | 888 Howard St | renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher.Details
renovate room 3118 to remove non-structural walls, reconfigure bathroom, add a pantry/closet and replace interior finishes. minor incidental work also related to this in room 3117 and 3018. n/a for the maher. | $150,000 | |
| Sep 5, 2014 | Completed final sign-off Mar 2015 | 888 Howard St | Red Hawk Fire & Security Ca Llc | 3rd, 4th & 5th floors fire alarm, adding door holders & smoke detectors including (13) smoke detectors, (23) door holders.Details
3rd, 4th & 5th floors fire alarm, adding door holders & smoke detectors including (13) smoke detectors, (23) door holders. | $4,000 |
| Apr 18, 2013 | Expired or cancelled cancelled Mar 2020 | 888 Howard St | add an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department.Details
add an exterior vestibule to an (e) building to reduce wind & air infiltration. add planter/landscaping per discussions with city planning department. | $150,000 | |
| Dec 10, 2009 | Completed final sign-off Jan 2010 | 888 Howard St | Western Allied Mechanical Inc. | install 1 heat exchanger unit at the mechanical room on the roof levelDetails
install 1 heat exchanger unit at the mechanical room on the roof level | $83,000 |
| Oct 30, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Diversified Fire Products | fire alarm ti for the 1st floor. hvac unit ah1-3. 1 control relay, 1 duct detectorDetails
fire alarm ti for the 1st floor. hvac unit ah1-3. 1 control relay, 1 duct detector | $6,300 |
| Jul 3, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Diversified Fire Products | fire alarm ti for meeting rm elev lobbies/back of house area on floor one thru five, 5 control relays, 29 smoke detectors, 36 door holdes.Details
fire alarm ti for meeting rm elev lobbies/back of house area on floor one thru five, 5 control relays, 29 smoke detectors, 36 door holdes. | $21,390 |
| Mar 25, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Fire Safety Supply Inc | add tank to existing hood & duct fire system on 3rd floor & rework piping to properly protect new appliances.Details
add tank to existing hood & duct fire system on 3rd floor & rework piping to properly protect new appliances. | $2,400 |
| Mar 25, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Webcor Construction Lp | floor 7 thru 11: revision to appl #200208154137-s4 to eliminate ws sprinklers. provide 1-hour fire rated interior wall over window assembly at light courts at 2 locations on the south bldg elevation. complaint #200796901.Details
floor 7 thru 11: revision to appl #200208154137-s4 to eliminate ws sprinklers. provide 1-hour fire rated interior wall over window assembly at light courts at 2 locations on the south bldg elevation. complaint #200796901. | $75,000 |
| Jan 14, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Fire Safety Supply Inc | install four ansul fire suppression systems in kitchen hoods. one on each floor - 1,3,4,5.Details
install four ansul fire suppression systems in kitchen hoods. one on each floor - 1,3,4,5. | $11,000 |
| Nov 28, 2007 | Completed final sign-off Nov 2008 | 888 Howard St | revision to approved permit application #200208154137. provide one standpipe outlet on the refuge side of the horisontal exit wall near the center door of the ballroom on the 5th floor. similar solution was previously submitted and approved for 3rd floor which is submitted agin to document the appDetails
revision to approved permit application #200208154137. provide one standpipe outlet on the refuge side of the horisontal exit wall near the center door of the ballroom on the 5th floor. similar solution was previously submitted and approved for 3rd floor which is submitted agin to document the app | ||
| Aug 16, 2007 | Completed final sign-off Nov 2008 | 888 Howard St | Universal Systems Int | install gas fireplace & pipe on level 31; 7" dia pipe thru flrs 32 & 33, to exterior wall on flr 33.Details
install gas fireplace & pipe on level 31; 7" dia pipe thru flrs 32 & 33, to exterior wall on flr 33. | $1,400 |
| Apr 18, 2007 | Never finaled issued Apr 2007, no final | 888 Howard St | street space permitDetails
street space permit | ||
| Oct 3, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | install underground fire water service to the building sprinkler system under 200208154137s.complaint #200667155.Details
install underground fire water service to the building sprinkler system under 200208154137s.complaint #200667155. | $6,000 | |
| Sep 11, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | provide arch. and structural details and equipments for swimming pool. ref. #200208154137 1s./occupant load calculations and path of travel on arch. addendum under app #2002081541371sDetails
provide arch. and structural details and equipments for swimming pool. ref. #200208154137 1s./occupant load calculations and path of travel on arch. addendum under app #2002081541371s | $50,000 | |
| Apr 28, 2006 | Expired or cancelled cancelled Jan 2026 | 888 Howard St | erect and operate tower caneDetails
erect and operate tower cane | $350,000 | |
| Apr 28, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | Webcor Construction Lp | erect and operate cane to comply with notice of violation issued on 5/16/2006Details
erect and operate cane to comply with notice of violation issued on 5/16/2006 | $350,000 |
| Apr 14, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | provide food service per plan. ref new building pa# 2002/08/15/4137sDetails
provide food service per plan. ref new building pa# 2002/08/15/4137s | $20,000 | |
| Apr 6, 2006 | Completed final sign-off Nov 2008 | 888 Howard St | provide structural detail up to podium. this permit is to include work from foundation to podium in addendum one per revised addendum schedule ref app #200208154137Details
provide structural detail up to podium. this permit is to include work from foundation to podium in addendum one per revised addendum schedule ref app #200208154137 | ||
| Aug 15, 2002 | Completed final sign-off Nov 2008 | 888 Howard St | Webcor Construction Lp | erect a 32 story 555 units hotelDetails
erect a 32 story 555 units hotel | $10,000,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.