Permit GraphSan Francisco building permits since 2000

Geisseler Engineering

Contractor license
464570
State license record
Based in
Belvedere
On San Francisco permits
Jul 2014 to Oct 2021
Last 24 months
0 permits filed

21 permits since 2000: 14 completed, 3 never finaled, 4 expired or cancelled.

Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 1Stairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 5, 2021Never finaled
issued Jul 2023, no final
106 06th Stto comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height.
Details
Permit
202110059822
Status
reinstated
Filed
Oct 5, 2021
Permit issued
Jul 20, 2023
Final sign-off
Sep 8, 2023
Declared cost
$34,000
Address
106 06th St

to comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height.

Open the permit page

$34,000
Oct 29, 2018Completed
final sign-off Mar 2019
217 Arkansas Strepair (e) retaining wall and install superstructure to prevent further retainwall wall rotation.
Details
Permit
201810294433
Status
complete
Filed
Oct 29, 2018
Permit issued
Nov 2, 2018
Final sign-off
Mar 15, 2019
Declared cost
$37,500
Address
217 Arkansas St

repair (e) retaining wall and install superstructure to prevent further retainwall wall rotation.

Open the permit page

$37,500
Aug 10, 2018Completed
final sign-off Sep 2018
888 Howard Stinstallation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit)
Details
Permit
201808107067
Status
complete
Filed
Aug 10, 2018
Permit issued
Aug 29, 2018
Final sign-off
Sep 27, 2018
Declared cost
$17,500
Address
888 Howard St

installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit)

Open the permit page

$17,500
May 2, 2018Never finaled
filed May 2018, never issued
4236 25th Stexisting unocuppied space at the ground level shall be converted to an accessory dwelling unit per add units ordinance no. 162-16.
Details
Permit
201805028044
Status
filed
Filed
May 2, 2018
Declared cost
$42,500
Address
4236 25th St

existing unocuppied space at the ground level shall be converted to an accessory dwelling unit per add units ordinance no. 162-16.

Open the permit page

$42,500
May 1, 2018Completed
final sign-off May 2018
115 Stillings Avin reference to issued building permit no 2018-0122-9201, a revision is applied wherein the original scope of work is reduce and following is removed: (i) epoxy crack repair of (e) concrete slab; and (ii) waterproofing of (e) footing
Details
Permit
201805017878
Status
complete
Filed
May 1, 2018
Permit issued
May 1, 2018
Final sign-off
May 3, 2018
Address
115 Stillings Av

in reference to issued building permit no 2018-0122-9201, a revision is applied wherein the original scope of work is reduce and following is removed: (i) epoxy crack repair of (e) concrete slab; and (ii) waterproofing of (e) footing

Open the permit page

Jan 22, 2018Completed
final sign-off May 2018
115 Stillings Avscope of work consists 3 unrelated tasks: sump pump installation, concrete crack repairs of garage slab floor (e) footing, waterproofing perimeter footing and concrete slab floor
Details
Permit
201801229201
Status
complete
Filed
Jan 22, 2018
Permit issued
Mar 21, 2018
Final sign-off
May 3, 2018
Declared cost
$27,500
Address
115 Stillings Av

scope of work consists 3 unrelated tasks: sump pump installation, concrete crack repairs of garage slab floor (e) footing, waterproofing perimeter footing and concrete slab floor

Open the permit page

$27,500
Dec 21, 2017Completed
final sign-off Oct 2018
100 Hugo Strevision to 201710312806, structural details added
Details
Permit
201712217182
Status
complete
Filed
Dec 21, 2017
Permit issued
Oct 1, 2018
Final sign-off
Oct 2, 2018
Address
100 Hugo St

revision to 201710312806, structural details added

Open the permit page

Dec 21, 2017Expired or cancelled
cancelled Jan 2026
4236 25th Strevisions in ref to issued building 201708164975 structural detail added
Details
Permit
201712217180
Status
cancelled
Filed
Dec 21, 2017
Address
4236 25th St

revisions in ref to issued building 201708164975 structural detail added

Open the permit page

Oct 31, 2017Completed
final sign-off Oct 2018
100 Hugo Stsoft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4
Details
Permit
201710312806
Status
complete
Filed
Oct 31, 2017
Permit issued
Nov 17, 2017
Final sign-off
Oct 2, 2018
Declared cost
$37,500
Address
100 Hugo St

soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4

Open the permit page

$37,500
Aug 16, 2017Completed
final sign-off Mar 2018
4236 25th Stexisting slab at gr lvl shall be replaced and lowered by 6 in. depth of proposed slab shall no exceed depth of bottom of e foundation. propsed volume of excavated soils 13.3 cubic yards
Details
Permit
201708164975
Status
complete
Filed
Aug 16, 2017
Permit issued
Oct 24, 2017
Final sign-off
Mar 27, 2018
Declared cost
$27,000
Address
4236 25th St

existing slab at gr lvl shall be replaced and lowered by 6 in. depth of proposed slab shall no exceed depth of bottom of e foundation. propsed volume of excavated soils 13.3 cubic yards

Open the permit page

$27,000
Jul 3, 2017Completed
final sign-off Oct 2017
4236 25th Stsoft story retrofit per sfebc chaper 4d, per 2016 cebc appendix a-4.
Details
Permit
201707030920
Status
complete
Filed
Jul 3, 2017
Permit issued
Jul 21, 2017
Final sign-off
Oct 23, 2017
Declared cost
$35,000
Address
4236 25th St

soft story retrofit per sfebc chaper 4d, per 2016 cebc appendix a-4.

Open the permit page

$35,000
Apr 28, 2017Expired or cancelled
cancelled Nov 2022
529 Flood Avunit legalization ord 43-14. legalization of a dwelling unit installed without a permit. minor structural improvements shall be installed which include shear walls.
Details
Permit
201704285148
Status
cancelled
Filed
Apr 28, 2017
Declared cost
$22,000
Address
529 Flood Av

unit legalization ord 43-14. legalization of a dwelling unit installed without a permit. minor structural improvements shall be installed which include shear walls.

Open the permit page

$22,000
Apr 28, 2017Expired or cancelled
cancelled Nov 2022
464 Arkansas Stunit legalization ord 43-14. legalization of a existing illegal dwelling unit. minor structural improvements shall incl installation of shear walls.
Details
Permit
201704285158
Status
cancelled
Filed
Apr 28, 2017
Declared cost
$20,000
Address
464 Arkansas St

unit legalization ord 43-14. legalization of a existing illegal dwelling unit. minor structural improvements shall incl installation of shear walls.

Open the permit page

$20,000
Oct 5, 2016Completed
final sign-off Apr 2017
2621 Lombard Strepairs shall be made to the north brick facade wall and some interior walls of the existing building where damage was caused by auto impact collision same as original; repair/replace garage door and other doors; repairs as per plan. n/a maher ordinance
Details
Permit
201610059569
Status
complete
Filed
Oct 5, 2016
Permit issued
Oct 7, 2016
Final sign-off
Apr 3, 2017
Declared cost
$138,500
Address
2621 Lombard St

repairs shall be made to the north brick facade wall and some interior walls of the existing building where damage was caused by auto impact collision same as original; repair/replace garage door and other doors; repairs as per plan. n/a maher ordinance

Open the permit page

$138,500
Mar 28, 2016Never finaled
issued Mar 2016, no final
1275 Bay Stelectrical and plumbing lines shall be routed to the existing roof, new polyurethane foam shall be applied to existing roof.
Details
Permit
201603283168
Status
issued
Filed
Mar 28, 2016
Permit issued
Mar 28, 2016
Declared cost
$7,500
Address
1275 Bay St

electrical and plumbing lines shall be routed to the existing roof, new polyurethane foam shall be applied to existing roof.

Open the permit page

$7,500
Mar 2, 2016Completed
final sign-off Apr 2016
1275 Bay Stminor design changes to existing building permit 2016-0223-00315, revised strengthening wall assemblies
Details
Permit
201603021042
Status
complete
Filed
Mar 2, 2016
Permit issued
Mar 3, 2016
Final sign-off
Apr 7, 2016
Address
1275 Bay St

minor design changes to existing building permit 2016-0223-00315, revised strengthening wall assemblies

Open the permit page

Feb 23, 2016Completed
final sign-off Apr 2016
1275 Bay Stminor design changes to e building permit 201602028607 which comprise of revised anchor bolt schedules and revised strengthening wall assemblies
Details
Permit
201602230315
Status
complete
Filed
Feb 23, 2016
Permit issued
Feb 23, 2016
Final sign-off
Apr 7, 2016
Declared cost
$15,000
Address
1275 Bay St

minor design changes to e building permit 201602028607 which comprise of revised anchor bolt schedules and revised strengthening wall assemblies

Open the permit page

$15,000
Feb 2, 2016Completed
final sign-off Apr 2016
1275 Bay Stvoluntary structural strengthening
Details
Permit
201602028607
Status
complete
Filed
Feb 2, 2016
Permit issued
Feb 5, 2016
Final sign-off
Apr 7, 2016
Declared cost
$15,000
Address
1275 Bay St

voluntary structural strengthening

Open the permit page

$15,000
Feb 2, 2016Expired or cancelled
cancelled Aug 2022
1275 Bay Sta roof deck shall be constructed on the existing roof of the subject property. the existing roof shall not be altered/repaired. new stair shall be constructed connecting to proposed deck. ** maher: n/a **
Details
Permit
201602028645
Status
cancelled
Filed
Feb 2, 2016
Declared cost
$60,000
Address
1275 Bay St

a roof deck shall be constructed on the existing roof of the subject property. the existing roof shall not be altered/repaired. new stair shall be constructed connecting to proposed deck. ** maher: n/a **

Open the permit page

$60,000
Oct 15, 2014Completed
final sign-off Dec 2014
4348 26th Stfoundation underpinning piers per section 832 of the california civil code shall be constructed underneath west perimeter foundation. add 2 sump pumps.
Details
Permit
201410158936
Status
complete
Filed
Oct 15, 2014
Permit issued
Nov 13, 2014
Final sign-off
Dec 23, 2014
Declared cost
$43,725
Address
4348 26th St

foundation underpinning piers per section 832 of the california civil code shall be constructed underneath west perimeter foundation. add 2 sump pumps.

Open the permit page

$43,725
Jul 9, 2014Completed
final sign-off Jul 2014
4287 24th Stan existing beam shall be reinforced with sistered beams.
Details
Permit
201407090808
Status
complete
Filed
Jul 9, 2014
Permit issued
Jul 10, 2014
Final sign-off
Jul 18, 2014
Declared cost
$900
Address
4287 24th St

an existing beam shall be reinforced with sistered beams.

Open the permit page

$900