Geisseler Engineering
- Based in
- Belvedere
- On San Francisco permits
- Jul 2014 to Oct 2021
- Last 24 months
- 0 permits filed
21 permits since 2000: 14 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2021 | Never finaled issued Jul 2023, no final | 106 06th St | to comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height.Details
to comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height. | $34,000 |
| Oct 29, 2018 | Completed final sign-off Mar 2019 | 217 Arkansas St | repair (e) retaining wall and install superstructure to prevent further retainwall wall rotation.Details
repair (e) retaining wall and install superstructure to prevent further retainwall wall rotation. | $37,500 |
| Aug 10, 2018 | Completed final sign-off Sep 2018 | 888 Howard St | installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit)Details
installation of anchor bolts only (baseplates) on 4th fl balcony for temporary tents not to exceed 180 days within a 12-month period on a single premise. not visible from street. (tent installation under separate permit) | $17,500 |
| May 2, 2018 | Never finaled filed May 2018, never issued | 4236 25th St | existing unocuppied space at the ground level shall be converted to an accessory dwelling unit per add units ordinance no. 162-16.Details
existing unocuppied space at the ground level shall be converted to an accessory dwelling unit per add units ordinance no. 162-16. | $42,500 |
| May 1, 2018 | Completed final sign-off May 2018 | 115 Stillings Av | in reference to issued building permit no 2018-0122-9201, a revision is applied wherein the original scope of work is reduce and following is removed: (i) epoxy crack repair of (e) concrete slab; and (ii) waterproofing of (e) footingDetails
in reference to issued building permit no 2018-0122-9201, a revision is applied wherein the original scope of work is reduce and following is removed: (i) epoxy crack repair of (e) concrete slab; and (ii) waterproofing of (e) footing | |
| Jan 22, 2018 | Completed final sign-off May 2018 | 115 Stillings Av | scope of work consists 3 unrelated tasks: sump pump installation, concrete crack repairs of garage slab floor (e) footing, waterproofing perimeter footing and concrete slab floorDetails
scope of work consists 3 unrelated tasks: sump pump installation, concrete crack repairs of garage slab floor (e) footing, waterproofing perimeter footing and concrete slab floor | $27,500 |
| Dec 21, 2017 | Completed final sign-off Oct 2018 | 100 Hugo St | revision to 201710312806, structural details addedDetails
revision to 201710312806, structural details added | |
| Dec 21, 2017 | Expired or cancelled cancelled Jan 2026 | 4236 25th St | revisions in ref to issued building 201708164975 structural detail addedDetails
revisions in ref to issued building 201708164975 structural detail added | |
| Oct 31, 2017 | Completed final sign-off Oct 2018 | 100 Hugo St | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $37,500 |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 4236 25th St | existing slab at gr lvl shall be replaced and lowered by 6 in. depth of proposed slab shall no exceed depth of bottom of e foundation. propsed volume of excavated soils 13.3 cubic yardsDetails
existing slab at gr lvl shall be replaced and lowered by 6 in. depth of proposed slab shall no exceed depth of bottom of e foundation. propsed volume of excavated soils 13.3 cubic yards | $27,000 |
| Jul 3, 2017 | Completed final sign-off Oct 2017 | 4236 25th St | soft story retrofit per sfebc chaper 4d, per 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chaper 4d, per 2016 cebc appendix a-4. | $35,000 |
| Apr 28, 2017 | Expired or cancelled cancelled Nov 2022 | 529 Flood Av | unit legalization ord 43-14. legalization of a dwelling unit installed without a permit. minor structural improvements shall be installed which include shear walls.Details
unit legalization ord 43-14. legalization of a dwelling unit installed without a permit. minor structural improvements shall be installed which include shear walls. | $22,000 |
| Apr 28, 2017 | Expired or cancelled cancelled Nov 2022 | 464 Arkansas St | unit legalization ord 43-14. legalization of a existing illegal dwelling unit. minor structural improvements shall incl installation of shear walls.Details
unit legalization ord 43-14. legalization of a existing illegal dwelling unit. minor structural improvements shall incl installation of shear walls. | $20,000 |
| Oct 5, 2016 | Completed final sign-off Apr 2017 | 2621 Lombard St | repairs shall be made to the north brick facade wall and some interior walls of the existing building where damage was caused by auto impact collision same as original; repair/replace garage door and other doors; repairs as per plan. n/a maher ordinanceDetails
repairs shall be made to the north brick facade wall and some interior walls of the existing building where damage was caused by auto impact collision same as original; repair/replace garage door and other doors; repairs as per plan. n/a maher ordinance | $138,500 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 1275 Bay St | electrical and plumbing lines shall be routed to the existing roof, new polyurethane foam shall be applied to existing roof.Details
electrical and plumbing lines shall be routed to the existing roof, new polyurethane foam shall be applied to existing roof. | $7,500 |
| Mar 2, 2016 | Completed final sign-off Apr 2016 | 1275 Bay St | minor design changes to existing building permit 2016-0223-00315, revised strengthening wall assembliesDetails
minor design changes to existing building permit 2016-0223-00315, revised strengthening wall assemblies | |
| Feb 23, 2016 | Completed final sign-off Apr 2016 | 1275 Bay St | minor design changes to e building permit 201602028607 which comprise of revised anchor bolt schedules and revised strengthening wall assembliesDetails
minor design changes to e building permit 201602028607 which comprise of revised anchor bolt schedules and revised strengthening wall assemblies | $15,000 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 1275 Bay St | voluntary structural strengtheningDetails
voluntary structural strengthening | $15,000 |
| Feb 2, 2016 | Expired or cancelled cancelled Aug 2022 | 1275 Bay St | a roof deck shall be constructed on the existing roof of the subject property. the existing roof shall not be altered/repaired. new stair shall be constructed connecting to proposed deck. ** maher: n/a **Details
a roof deck shall be constructed on the existing roof of the subject property. the existing roof shall not be altered/repaired. new stair shall be constructed connecting to proposed deck. ** maher: n/a ** | $60,000 |
| Oct 15, 2014 | Completed final sign-off Dec 2014 | 4348 26th St | foundation underpinning piers per section 832 of the california civil code shall be constructed underneath west perimeter foundation. add 2 sump pumps.Details
foundation underpinning piers per section 832 of the california civil code shall be constructed underneath west perimeter foundation. add 2 sump pumps. | $43,725 |
| Jul 9, 2014 | Completed final sign-off Jul 2014 | 4287 24th St | an existing beam shall be reinforced with sistered beams.Details
an existing beam shall be reinforced with sistered beams. | $900 |