Block 3726, lot 002
106 06th St
- City’s use
- Commercial Hotel
- Built
- 1912
- Stories
- 7
- Units
- 4
- Rooms
- 39 bathrooms
- Building
- 28,054 sq ft
- Lot
- 4,499 sq ft
- Zoning
- RSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off Jan 2026 | 106 06th St | G J Chavez Inc | toilet room floor repair at lobby due to cracked tiles.Details
toilet room floor repair at lobby due to cracked tiles. | $12,000 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 110 06th St | Najjar Construction Inc | relocating machines. adding drink machines. changing location of register to place at fridge. adding hand was sink behind register.Details
relocating machines. adding drink machines. changing location of register to place at fridge. adding hand was sink behind register. | $9,500 |
| Feb 11, 2025 | In progress filed Feb 2025, not yet issued | 110 06th St | switching ada pos counter to produce fridge location adding hand sink behind ada pos. adding new equipment to store.Details
switching ada pos counter to produce fridge location adding hand sink behind ada pos. adding new equipment to store. | $9,500 | |
| Jan 15, 2025 | In progress issued Jan 2025 | 110 06th St | a ventless hood will be added to the kitchen to fry fried chichen. easily moved around, connected, and disconnected. no exterior work.Details
a ventless hood will be added to the kitchen to fry fried chichen. easily moved around, connected, and disconnected. no exterior work. | $70 | |
| Jan 10, 2023 | Never finaled issued Jan 2023, no final | 106 06th St | Lee's Signs | install 1 wall sign, electric, single faced "soma produce"Details
install 1 wall sign, electric, single faced "soma produce" | $5,500 |
| Oct 3, 2022 | Completed final sign-off Dec 2022 | 110 06th St | A S Fire Protection | instlall (3) new fire sprinkler head and relocate 4 per new layout on ground fl. grocery store onlyDetails
instlall (3) new fire sprinkler head and relocate 4 per new layout on ground fl. grocery store only | $4,500 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 106 06th St | Super Home Builders Inc. | unit #509 only. install sheetrock over existing ceiling.Details
unit #509 only. install sheetrock over existing ceiling. | $3,800 |
| Jul 14, 2022 | Expired or cancelled cancelled Jan 2026 | 110 06th St | Admiral Builders Inc | change of use and t.i. : remodeling (e) retail locatoin by adding new walls, new electrical, new plumbing, new ada bathroom, new paint and new flooring.Details
change of use and t.i. : remodeling (e) retail locatoin by adding new walls, new electrical, new plumbing, new ada bathroom, new paint and new flooring. | $100,000 |
| May 9, 2022 | Completed final sign-off Feb 2023 | 110 06th St | Admiral Builders Inc | to comply with nov#202179781. proposed to open a grocery store:fruits, vegtable, packaged food, house hold items. propose to change floor tiles, add fridge, shelves, and storage. change of use from beauty supply to grocery store.Details
to comply with nov#202179781. proposed to open a grocery store:fruits, vegtable, packaged food, house hold items. propose to change floor tiles, add fridge, shelves, and storage. change of use from beauty supply to grocery store. | $20,000 |
| Jan 5, 2022 | Completed final sign-off Jan 2022 | 106 06th St | Super Home Builders Inc. | unit 410: replace existing wall and ceiling sheetrock with new 5/8" type 'x' drywall. approx 490 sf. uit 410 is a residential unit and not a tourist guestroom.Details
unit 410: replace existing wall and ceiling sheetrock with new 5/8" type 'x' drywall. approx 490 sf. uit 410 is a residential unit and not a tourist guestroom. | $5,500 |
| Dec 6, 2021 | Expired or cancelled withdrawn May 2022 | 110 06th St | store improvement to open cloth and beatuy supply store (no food/no beverage). change of use. new floor tile, new partition wall in (e) storage room. change storage to changing room, replace water heater.Details
store improvement to open cloth and beatuy supply store (no food/no beverage). change of use. new floor tile, new partition wall in (e) storage room. change storage to changing room, replace water heater. | $5,000 | |
| Oct 5, 2021 | Never finaled issued Jul 2023, no final | 106 06th St | Geisseler Engineering | to comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height.Details
to comply with nov# 202179781. repair pilasters and brick walls at rear of building & basement by providing epoxy and installation of steel tie-back braces. no change to existing use, area, height. | $34,000 |
| Jan 12, 2021 | Completed final sign-off Apr 2021 | 106 06th St | Super Home Builders Inc. | repair water damaged drywall at common hallway restroom. comply complaint 202071603, approx 240 sf of dry wall repairDetails
repair water damaged drywall at common hallway restroom. comply complaint 202071603, approx 240 sf of dry wall repair | $5,300 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 106 06th St | street spaceDetails
street space | ||
| Sep 6, 2019 | Never finaled issued Sep 2019, no final | 106 06th St | street spaceDetails
street space | ||
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 106 06th St | streetspaceDetails
streetspace | ||
| May 23, 2019 | Completed final sign-off Jul 2019 | 106 06th St | to comply with nov # 201937621, referencing building permit for approved grab bars in tub room next to room 401Details
to comply with nov # 201937621, referencing building permit for approved grab bars in tub room next to room 401 | $150 | |
| May 16, 2019 | Never finaled issued May 2019, no final | 106 06th St | street spaceDetails
street space | ||
| Oct 24, 2018 | Completed final sign-off Sep 2019 | 106 06th St | Super Home Builders Inc. | repair 2 (e) balconies at 3rd flr. 2 missing balustrades will be provided. all rotted wood members to be replaced w/ correct waterproofing system. no change to use, height and window. work limited to balconies. less than 25% structural work replacement. maher n/a.Details
repair 2 (e) balconies at 3rd flr. 2 missing balustrades will be provided. all rotted wood members to be replaced w/ correct waterproofing system. no change to use, height and window. work limited to balconies. less than 25% structural work replacement. maher n/a. | $5,400 |
| Apr 19, 2016 | Completed final sign-off May 2016 | 106 06th St | Occidental Express | to comply with nov 201547101: establish room count as 100 residential and 21 tourist. maher na; no construction work.Details
to comply with nov 201547101: establish room count as 100 residential and 21 tourist. maher na; no construction work. | $5,000 |
| Mar 31, 2016 | Completed final sign-off Aug 2018 | 106 06th St | C & K Housing Const Co *Ck Id* | comply with nov 201547101 item no 15 and 16. handrails at basementDetails
comply with nov 201547101 item no 15 and 16. handrails at basement | $200 |
| Jun 12, 2013 | Completed final sign-off Aug 2017 | 106 06th St | to comply with ordinance 029-13 only. 7 story bldg. 13 common toilets: 2 per floor and one at lobby level, 6 showers one per floor. 4 grab bars per floor, 2 each for 2 toilets, 2 per shower, 25 total grab bars.Details
to comply with ordinance 029-13 only. 7 story bldg. 13 common toilets: 2 per floor and one at lobby level, 6 showers one per floor. 4 grab bars per floor, 2 each for 2 toilets, 2 per shower, 25 total grab bars. | $750 | |
| Dec 23, 2010 | Completed final sign-off Jul 2011 | 106 06th St | Suf Constructon Co | replacing two interior doors, placing 5/8" type-x gyp. over (e) lath & plaster in living-room and replacing 4 elec. receptacles in living-room.Details
replacing two interior doors, placing 5/8" type-x gyp. over (e) lath & plaster in living-room and replacing 4 elec. receptacles in living-room. | $2,000 |
| Oct 5, 2006 | Never finaled issued Oct 2006, no final | 106 06th St | street spaceDetails
street space | ||
| Apr 4, 2006 | Expired or cancelled expired Apr 2007 | 106 06th St | Fire Protection Retrofit Specialist | renew pa#200411129036.Details
renew pa#200411129036. | |
| Aug 17, 2005 | Never finaled issued Nov 2005, no final | 106 06th St | Fire & Security & Alarm Co/ F.S.A.C. | upgrading fire alarm system and all devices - entire building, adding 64 horns, 44 horn stobes, 20 strobes & 2 power expanders, 2 heat detectors, 56 sd, 1 ps & annunicatorDetails
upgrading fire alarm system and all devices - entire building, adding 64 horns, 44 horn stobes, 20 strobes & 2 power expanders, 2 heat detectors, 56 sd, 1 ps & annunicator | $28,000 |
| Apr 5, 2005 | Never finaled issued Apr 2005, no final | 106 06th St | streetspaceDetails
streetspace | ||
| Jan 4, 2005 | Expired or cancelled expired Mar 2007 | 106 06th St | S M Construction/Assoc. *Check For I.D* | sidewalk replacement as per plan.Details
sidewalk replacement as per plan. | $12,500 |
| Nov 12, 2004 | Completed final sign-off Apr 2006 | 106 06th St | Fire Protection Retrofit Specialist | to install fire sprinkler system per ord. 165.01 and amendment 170-02 and comply w/his complaintDetails
to install fire sprinkler system per ord. 165.01 and amendment 170-02 and comply w/his complaint | $17,200 |
| Apr 29, 2004 | Expired or cancelled cancelled Dec 2004 | 106 06th St | Occidental Express | as built plans for existing fire sprinkler system complying with sro ordinance #170-02 notice #2003/Details
as built plans for existing fire sprinkler system complying with sro ordinance #170-02 notice #2003/ | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.